ENS 55503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the AFW system. Unit 1 was not affected by this issue.  
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the AFW system. Unit 1 was not affected by this issue.  
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20211004en.html#en55503
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20211005en.html#en55503
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 06:30, 5 October 2021

ENS 55503 +/-
Where
Prairie Island Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+2.22 h0.0925 days <br />0.0132 weeks <br />0.00304 months <br />)
Opened: Jonathon Tepley
22:38 Oct 3, 2021
NRC Officer: Thomas Herrity
Last Updated: Oct 3, 2021
55503 - NRC Website
Loading map...