ENS 55129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 19: Line 19:
| event text = At 1027 CST on 3/8/21, while the reactor was at 900 kW at steady state, a sample was pulled before the planned down power was executed. As a result, the reactor may have exceeded the 1000 kW limit for one second by 1 kW per Tech Spec 3.1. The duration was recorded on the strip chart recorder.
| event text = At 1027 CST on 3/8/21, while the reactor was at 900 kW at steady state, a sample was pulled before the planned down power was executed. As a result, the reactor may have exceeded the 1000 kW limit for one second by 1 kW per Tech Spec 3.1. The duration was recorded on the strip chart recorder.
The licensee has notified the NRC Project Manager (Patrick Boyle).
The licensee has notified the NRC Project Manager (Patrick Boyle).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20210310en.html#en55129
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2021/20210311en.html#en55129
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Revision as of 08:30, 11 March 2021

ENS 55129 +/-
Where
Texas A&Amp;M University
College Station, Texas (NRC Region 0)
License number: R-83
Reporting
Non
Time - Person (Reporting Time:+18.92 h0.788 days <br />0.113 weeks <br />0.0259 months <br />)
Opened: Sean Mcdeavitt
11:22 Mar 9, 2021
NRC Officer: Bethany Cecere
Last Updated: Mar 9, 2021
55129 - NRC Website