ENS 55038: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
| utype = W-3-LP
| utype = W-3-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 12/16/2020 12:19
| notification date = 12/16/2020 12:19
| notification by = Chris Hayes
| notification by = Chris Hayes
Line 22: Line 22:
All rods inserted into the core during the trip. The electrical grid is stable and all safe shutdown equipment is available for service. No reliefs lifted during the transient.
All rods inserted into the core during the trip. The electrical grid is stable and all safe shutdown equipment is available for service. No reliefs lifted during the transient.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201218en.html#en55038
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201218en.html#en55038
}}{{unit info
| Unit = 1
| type = W-3-LP
| Scram code = A/R
| Reactor critical = Y
| Initial power = 80
| Initial reactor mode = Power Operation
| Current power = 0
| Current reactor mode = Hot Standby
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Latest revision as of 12:06, 15 January 2021

ENS 55038 +/-
Where
Harris Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-1.53 h-0.0638 days <br />-0.00911 weeks <br />-0.0021 months <br />)
Opened: Chris Hayes
12:19 Dec 16, 2020
NRC Officer: Howie Crouch
Last Updated: Dec 16, 2020
55038 - NRC Website
Loading map...