ENS 55038: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 22: | Line 22: | ||
All rods inserted into the core during the trip. The electrical grid is stable and all safe shutdown equipment is available for service. No reliefs lifted during the transient. | All rods inserted into the core during the trip. The electrical grid is stable and all safe shutdown equipment is available for service. No reliefs lifted during the transient. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201218en.html#en55038 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201218en.html#en55038 | ||
}}{{unit info | |||
| Unit = 1 | |||
| type = W-3-LP | |||
| Scram code = A/R | |||
| Reactor critical = Y | |||
| Initial power = 80 | |||
| Initial reactor mode = Power Operation | |||
| Current power = 0 | |||
| Current reactor mode = Hot Standby | |||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Revision as of 11:56, 15 January 2021
Where | |
---|---|
Harris ![]() North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-1.53 h-0.0638 days <br />-0.00911 weeks <br />-0.0021 months <br />) | |
Opened: | Chris Hayes 12:19 Dec 16, 2020 |
NRC Officer: | Howie Crouch |
Last Updated: | Dec 16, 2020 |
55038 - NRC Website
| |