ENS 55056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 17: Line 17:
| last update date = 01/07/2021
| last update date = 01/07/2021
| title = Unusual Event Declared Due to Rise in Drywell Unidentified Reactor Coolant System Leakage
| title = Unusual Event Declared Due to Rise in Drywell Unidentified Reactor Coolant System Leakage
| event text = "An Unusual Event was declared at Grand Gulf Nuclear Station at 0124 [CST] on 01/07/2021 due to Unidentified Drywell Leakage exceeding 10 GPM for 15 minutes. Unidentified leakage has reduced to less than 0.44 GPM as of 0213 CST on 01/07/2021."
| event text = "An Unusual Event was declared at Grand Gulf Nuclear Station at 0124 [CST] on 01/07/2021 due to Unidentified Drywell Leakage exceeding 10 GPM for 15 minutes. Unidentified leakage has reduced to less than 0.44 GPM as of 0213 CST on 01/07/2021."
The cause of the increase leakage rate is under investigation.
The cause of the increase leakage rate is under investigation.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Revision as of 23:06, 13 January 2021

ENS 55056 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
Emergency class: Unusual Event
10 CFR 50.72(a) (1) (i), Emergency Class Declaration
Time - Person (Reporting Time:+-4.1 h-0.171 days <br />-0.0244 weeks <br />-0.00562 months <br />)
Opened: Leroy Purdy
03:18 Jan 7, 2021
NRC Officer: Brian Lin
Last Updated: Jan 7, 2021
55056 - NRC Website
Loading map...