05000440/FIN-2005003-26: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 95003
| Inspection procedure = IP 95003
| Inspector = G Wrightj Bongarra, J Cai, J Ellegood, J Richmond, K Elsea, M Beilby, M Kunowski, M Shannon,
| Inspector = G Wright, J Bongarra, J Cai, J Ellegood, J Richmond, K Elsea, M Beilby, M Kunowski, M Shannon
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Revision as of 20:31, 20 February 2018

26
Site: Perry FirstEnergy icon.png
Report IR 05000440/2005003 Section 4OA4
Date counted Jun 30, 2005 (2005Q2)
Type: TEV: Severity level IV
cornerstone Emergency Prep
Identified by: NRC identified
Inspection Procedure: IP 95003
Inspectors (proximate) G Wright
J Bongarra
J Cai
J Ellegood
J Richmond
K Elsea
M Beilby
M Kunowski
M Shannon
INPO aspect
'