VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION , | |||
MONTHLY OPERATING REPORT MONTH OCTOBER YEAR 1981 (Revised 12-03-81) | |||
-f | |||
\ | |||
f 1 | |||
APPROVED: | |||
J l | |||
l J | |||
STATION MANAGER / | |||
'. l l | |||
l T 8211030166 811218 ' | |||
DR ADDCK 05000338 PDR | |||
_ . _ . - . - - . . _ . _ . _ . _ . . . _ , . _ . _ .m . | |||
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-03-81 COMPLETED BY L.L. Rogers _ | |||
TELEPHONE (703) 894-5151 X2510 OPERATING STATUS i Notes | |||
* Reflects corrected | |||
: 1. Unit Name: North Anna 2 number of hours i | |||
: 2. Reporting Period: October 1981 (Revised 12-03-81) generator on line. l | |||
: 3. Licensed Thermal Power (MWt): 2775 | |||
: 4. Nameplate Rating (Gross MWe): 947 | |||
: 5. Design Electrical Rating (Net MWe): 907 | |||
: 6. Maximum Dependable Capacity (Gross NWe): 939 | |||
: 7. Maximum Dependable Capacity (Net HWe): 890 | |||
: 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons l Corrects re-evaluation of auxiliary load consumption dated May 1981. | |||
l | |||
: 9. Power Level To Which Restricted, If Any (Net NWe): N/A 1 | |||
: 10. Reasons For Restrictions, If Any: N/A l l | |||
6el h it4 0 M r 9/ ~ 3 9 0 | |||
This Month Yr.-to-Date Cumulative , | |||
: 11. Hours In Reporting Period 745 7,296 7,728 i | |||
: 12. Number of Hours Reactor Was Critical 733.2 5,524.3 5,953.2 l | |||
: 13. Reactor Reserve Shutdown Hours 7/3, .4 17m1 1.358.5_ 1,638.5 | |||
: 14. Hours Generator On-Line Ok (*?!; 23 d5,362.M ,*5,775 > ! | |||
: 15. Unit Reserve Shutdown Hours 88 4 0 0 . 0 | |||
: 16. Gross Thermal Energy Generated (MWH) 1,898,994 13,802,996 14,889,993 | |||
: 17. Gross Electrical Energy Generated (MWH) 643,948 4,653,876 5,022,307 | |||
: 18. Net Electrical Energy Generated (MWH) 611,338 4,402,998 4,752,642 | |||
: 19. Unit Service Factor *95.7 *73.5 *74.7 | |||
: 20. Unit Availability Factor *95.7 *73.5 *74.7 ; | |||
: 21. Unit Capacity Factor (Using MDC Net) 92.2 67.8 69.1 ! | |||
: 22. Unit Capacity Factor (Using DER Net) 90.5 66.5 67.8 ' | |||
: 23. Unit Forced Outage Rate *4.3 *23.3 *22.2 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
1 Refueling Outane 05-82 thru 05-14-82 l | |||
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A | |||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast | |||
\. Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
* corrects duratica of shutdown 81-38' j | |||
Page 1 of 2 I | |||
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 12-03-81 REPORT MONTH OCTOBER (Revised) COMPLETED BY L. L. ROGERS TELEPHONE (703) 894-5151 X2510 2 Component Cause & Corrective No. Date Typel Duration Reason Method of Licensee System (Hours) Shutting Event Code Code Action to 3 4 5 Down Reactor Report # Prevent Recurrence 81-37 811001 F N/A F 5 N/A N/A N/A Reduced load to 90% due to "B" Transformer hi alarm and No. 4 | |||
, governor valve cycling. | |||
81-38 811003 F *26.8 *A 3 N/A N/A N/ Reactor trip due to ENC line rupture on No.4 governor. | |||
ld M | |||
^ | |||
,( Closed No. 4 governor valve and Mk - | |||
installed new supports l. | |||
81-39 811004 F 5.0 . A 3 N/A N/A N/A Reactor Trip due to generator leads differential. | |||
Reduced load to 91% due to "B" 81-40 811005 F N/A F 5 N/A N/A N/A Transformer hi temperature i alarm. | |||
! 81-41 811006 F N/A F 5 N/A N/A N/A ' Reduced load to 90% due to "B" Transformer hi temperature alarm. | |||
; / | |||
1 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions 8: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance or Test 2-Maiinh1 Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File l | |||
D-Regulatory Restriction 4-Continuations (NUREG-0161) | |||
; E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other | |||
' G-Operational Error (Explain) | |||
H-Other (Explain) Exhibit H - Same Source | |||
_ _ - - _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _}} |
Latest revision as of 03:14, 6 January 2021
ML20065T862 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 12/03/1981 |
From: | Rogers L VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML20065T858 | List: |
References | |
NUDOCS 8211030166 | |
Download: ML20065T862 (3) | |
Text
. . _ _ _ . . _ _ - - __ . _ _ ._
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION ,
MONTHLY OPERATING REPORT MONTH OCTOBER YEAR 1981 (Revised 12-03-81)
-f
\
f 1
APPROVED:
J l
l J
STATION MANAGER /
'. l l
l T 8211030166 811218 '
DR ADDCK 05000338 PDR
_ . _ . - . - - . . _ . _ . _ . _ . . . _ , . _ . _ .m .
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-03-81 COMPLETED BY L.L. Rogers _
TELEPHONE (703) 894-5151 X2510 OPERATING STATUS i Notes
- Reflects corrected
- 1. Unit Name: North Anna 2 number of hours i
- 2. Reporting Period: October 1981 (Revised 12-03-81) generator on line. l
- 3. Licensed Thermal Power (MWt): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross NWe): 939
- 7. Maximum Dependable Capacity (Net HWe): 890
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons l Corrects re-evaluation of auxiliary load consumption dated May 1981.
l
- 9. Power Level To Which Restricted, If Any (Net NWe): N/A 1
- 10. Reasons For Restrictions, If Any: N/A l l
6el h it4 0 M r 9/ ~ 3 9 0
This Month Yr.-to-Date Cumulative ,
- 11. Hours In Reporting Period 745 7,296 7,728 i
- 12. Number of Hours Reactor Was Critical 733.2 5,524.3 5,953.2 l
- 13. Reactor Reserve Shutdown Hours 7/3, .4 17m1 1.358.5_ 1,638.5
- 14. Hours Generator On-Line Ok (*?!; 23 d5,362.M ,*5,775 > !
- 15. Unit Reserve Shutdown Hours 88 4 0 0 . 0
- 16. Gross Thermal Energy Generated (MWH) 1,898,994 13,802,996 14,889,993
- 17. Gross Electrical Energy Generated (MWH) 643,948 4,653,876 5,022,307
- 18. Net Electrical Energy Generated (MWH) 611,338 4,402,998 4,752,642
- 19. Unit Service Factor *95.7 *73.5 *74.7
- 20. Unit Availability Factor *95.7 *73.5 *74.7 ;
- 21. Unit Capacity Factor (Using MDC Net) 92.2 67.8 69.1 !
- 22. Unit Capacity Factor (Using DER Net) 90.5 66.5 67.8 '
- 23. Unit Forced Outage Rate *4.3 *23.3 *22.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Refueling Outane 05-82 thru 05-14-82 l
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast
\. Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- corrects duratica of shutdown 81-38' j
Page 1 of 2 I
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 DATE 12-03-81 REPORT MONTH OCTOBER (Revised) COMPLETED BY L. L. ROGERS TELEPHONE (703) 894-5151 X2510 2 Component Cause & Corrective No. Date Typel Duration Reason Method of Licensee System (Hours) Shutting Event Code Code Action to 3 4 5 Down Reactor Report # Prevent Recurrence 81-37 811001 F N/A F 5 N/A N/A N/A Reduced load to 90% due to "B" Transformer hi alarm and No. 4
, governor valve cycling.
81-38 811003 F *26.8 *A 3 N/A N/A N/ Reactor trip due to ENC line rupture on No.4 governor.
ld M
^
,( Closed No. 4 governor valve and Mk -
installed new supports l.
81-39 811004 F 5.0 . A 3 N/A N/A N/A Reactor Trip due to generator leads differential.
Reduced load to 91% due to "B" 81-40 811005 F N/A F 5 N/A N/A N/A Transformer hi temperature i alarm.
! 81-41 811006 F N/A F 5 N/A N/A N/A ' Reduced load to 90% due to "B" Transformer hi temperature alarm.
- /
1 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions 8: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance or Test 2-Maiinh1 Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File l
D-Regulatory Restriction 4-Continuations (NUREG-0161)
- E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other
' G-Operational Error (Explain)
H-Other (Explain) Exhibit H - Same Source
_ _ - - _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _