05000346/FIN-2004015-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Failure To Perform Appropriate 50.59 Screening Concerning Eccs Sump Pump Affect On Eccs Component Operability
| title = Failure to Perform Appropriate 50.59 Screening Concerning ECCS Sump Pump Affect on ECCS Component Operability
| docket = 05000346
| docket = 05000346
| inspection report = IR 05000346/2004015
| inspection report = IR 05000346/2004015

Revision as of 19:44, 20 February 2018

01
Site: Davis Besse Cleveland Electric icon.png
Report IR 05000346/2004015 Section 1R06
Date counted Dec 31, 2004 (2004Q4)
Type: TEV: Severity level IV
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.06
Inspectors (proximate) P Lougheed
G Roach
J House
J Rutkowski
S Thomas
D Passehl
K Walton
C Lipa
M Salter
-William
INPO aspect
'