ML20205A112: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:- | ||
# | |||
f.g | |||
LcY8%f | |||
v | |||
. . | |||
August 5, 1986 | |||
Georgia Power Company | |||
/ ATTN: Mr. J. H. Miller, Jr. | |||
President | |||
P. O. Box 4545 | |||
Atlanta, GA 30302 | |||
Gentlemen: | |||
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 2, OPERATIONS TRAINING | |||
AND QUALIFICATION | |||
The NRC has completed a detailed review, inspection, and verification of the | |||
subject module which you submitted to the NRC on August 19, 1985. Periodic | |||
inspections were conducted at the Vogtle site, and the resultant findings were | |||
discussed with members of your staff at the conclusion of these inspections. | |||
Technical reviews were also conducted in NRC Bethesda offices, and the findings | |||
from these reviews have also been discussed with your staff. | |||
Areas contained in the module which were reviewed, examined, and verified are | |||
identified in the enclosed report. Within these areas, the inspection and | |||
verification consisted of selected examinations of procedures and representative | |||
records, discussions with personnel, observations of activities in progress, and | |||
review of your licensing commitments. | |||
The primary results of module 2 reviews and inspections are provided in the | |||
summary and conclusions section of the enclosed report. Within the findings | |||
section, several deficiencies are identified. Your attention is invited to these | |||
matters which will be pursued during future reviews and inspections. | |||
Based upon the NRC review and inspection of those activities identified in the | |||
module, we consider that several examples existed where regulatory requirements | |||
and guidance were not adequately implemented, that significant administrative | |||
deficiencies existed with training program implementation, and that, in our | |||
judgement, some specific areas of training required improvement to assure effec- | |||
tive training of personnel. In many cases, you initiated appropriate corrective | |||
actions which should resolve the noted deficiencies. In some cases, your | |||
previously planned activities for improved training had not been completely | |||
established or implemented at the time of our inspections and consequently could | |||
not be evaluated by the NRC at that time. As described in the enclosed report, | |||
some areas of training considered by the NRC to be deficient still require ^ | |||
further resolution. This resolution will be integrated into the plant licensing | |||
process. | |||
Training content, quality, and effectiveness appeared to be satisfactory, | |||
with the exception of walkthrough training, Technical Specification training, | |||
emergency planning training and training for mitigation of core damage. . | |||
Additionally, sufficient resources appeared to be allocated to ensure ' | |||
satisfactory training program implementation, and Georgia Power Company | |||
employees appeared to be supportive of your training programs. | |||
l | |||
8608110306 860805 I | |||
: PDR ADOCK 05000424 | |||
_ _ - - - | |||
""" | |||
. _ . - . | |||
Tb(ol | |||
. | |||
- | |||
. . | |||
Georgia Power Company 2 August 5, 1986 | |||
We will again be inspecting your programs for training and qualification of | |||
,= | |||
personnel prior to licensing as part of the Near Term Operating License inspec- | |||
tior' program and during that inspection, we will assess the adequacy of implemen- | |||
tation of corrective actions as:;ociated with this review. It is expected that, | |||
~a t that time, all open items and unresolved issues associated with training | |||
should be corrected. | |||
Based upon your responsiveness and your ongoing efforts to correct the deficien- | |||
cies noted during this review, it appears that module 2 will be acceptable once | |||
# | |||
corrective actions have been satisfactorily implemented and remaining concerns | |||
have been adequately resolved. | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
(original signed by) | |||
J. Nelson Grace | |||
Regional Administrator | |||
Enclosure: | |||
Inspection Report No. 50-424/85-54 | |||
cc w/ encl: | |||
# P. O'Reilly, Senior Vice | |||
President | |||
d.E.Conway,SeniorVicePresident& | |||
Project Director | |||
I 0. Foster, Vice President, Project | |||
Support | |||
T D. Rice, Vice President, Project | |||
Engineering | |||
Jc'H.Pinson,VicePresident, Project | |||
Construction | |||
J T. Beckham, Vice President & | |||
General Manager - Operations | |||
z X A. Thomas, Vice President, | |||
Licensing | |||
gC. W. Ilayes, Vogtle Quality | |||
Assurance Manager | |||
LW. C. Ramsey, Manager - | |||
Readiness Review | |||
4K B. Bockhold, General Manager, | |||
, Nuclear Operations | |||
vt. Gucwa, Manager, Nuclear Safety | |||
and Licensing | |||
(cc cont'd. - see page 3) | |||
f: | |||
. | |||
. . | |||
Georgia Power Company 3 August 5, 1986 | |||
(cc w/ enc 1 cont'd.) | |||
M[ H. Googe, Project | |||
JonstructionManager | |||
IF. D. Groover, Quality | |||
Assurance Site Manager - | |||
Construction | |||
DrA. Bailey,ProjectLicensing | |||
Manager | |||
LG/F. Trowbridge, Esq. , Shaw, | |||
fittman, Potts and Trowbridge | |||
L8'. W. Churchill, Esq. , Shaw, | |||
fittman, Potts and Trowbridge | |||
L-C. L. Blake, Jr., Esq., Shaw, | |||
Pittman, Potts and Trowbridge | |||
g E. Joiner, Troutman, Sanders, | |||
Lockerman and Ashmore | |||
(J( G. Ledbetter, Connissioner, | |||
Department of Human Resources | |||
F. H. Badger, Office of Planning | |||
and Budget | |||
Br'Kirkland, III, Counsel, | |||
Office of the Consumer's Utility | |||
, Jo'uncil | |||
W. C. Teper, Georgians Against | |||
Nuclear Energy | |||
LJ1. B. Margulies, Esq., Chairman, | |||
Atomic Safety and Licensing Board | |||
Panel | |||
Jr. O. H. Paris, Administrative Judge | |||
Atomic Safety and Licensing Board | |||
Panel | |||
LG (A. Linenberger, Jr., Administrative Judge | |||
Atomic Safety and Licensing Board | |||
- | |||
Panel | |||
LS/P. Garde, Citizens Ciinic, Director | |||
Government Accountability Project | |||
bec w/ encl: | |||
/, B'. Bordenick, 0GC | |||
M Reis, 0GC | |||
LW'.,M. Hil1, IE | |||
-. Miller, NRR | |||
< rach, ED0 | |||
,J/Sinkule,RII | |||
Christnot, RII | |||
VNRC Resident Inspector | |||
Document Control Desk | |||
State of Georgia | |||
.. | |||
s | |||
. | |||
. . | |||
Georgia Power Company 4 August 5, 1986 | |||
l | |||
' ~ | |||
b | |||
RII RII RII RII | |||
CJulian - AGibson | |||
kW | |||
MSinkule | |||
, | |||
FMcCoy:btm BWilson | |||
l 06/ /86 06/ /86 06/ /86 06/ /86 06/ /86 | |||
ThI | |||
RII | |||
fulf a v | |||
RI RI NRR | |||
NW NRg " | |||
VLTro lee eyes R TNovat BGrime | |||
' 06 | |||
- | |||
/ / /86 6 06/ /86 06/ ,/86 | |||
cfl/86 ct 9f l(.(t6 oglet 09lof | |||
, | |||
* | |||
.. . | |||
.e | |||
. . | |||
Georgia Power Company 3 | |||
cc w/enci cont'd. | |||
J. A. Bailey, Project Licensing | |||
M'inager | |||
G. F. Trowbridge, Esq., Shaw, | |||
Pittman, Potts and Trowbridge | |||
B. W. Churchill, Esq., Shaw, | |||
Pittman, Potts and Trowbridge | |||
E. L. Blake, Jr.,-Esq., Shaw, | |||
Pittman, Potts and Trowbridge | |||
J. E. Joiner, Troutman, Sanders, | |||
Lockerman and Ashmore | |||
J. G..Ledbetter, Commissioner, | |||
Department of Human Resources | |||
C. H. Badger, Office of Planning | |||
and Budget | |||
D. Kirkland, III, Counsel, | |||
Office of the Consumer's Utility | |||
Council | |||
D. C. Teper, Georgians Against | |||
Nuclear Energy | |||
M. B. Margulies, Esq., Chairman, | |||
Atomic Safety and Licensing Board | |||
Panel | |||
Dr.'0. H. Paris, Administrative Judge | |||
Atomic Safety and' Licensing Board | |||
Panel | |||
G. A. Linenberger, Jr., Administrative Judge | |||
Atomic Safety.and Licensing Board | |||
Panel | |||
B. P. Garde, Citizens Clinic, Director | |||
Government Accountability Project | |||
E | |||
bec w/ encl: | |||
E. Reis , Ete-C Cr C- | |||
W. M. Hill, IE | |||
M. Miller, NRR | |||
W. Brach, ED0 | |||
M. Sinkule, RII | |||
E. Christnot, RII | |||
NRC Resident Inspector | |||
Document Control Desk | |||
State of Georgia | |||
. | |||
RII RII RII RI RII RII | |||
J 3/gv | |||
cc y: Toon CJhl n AGi on MSinkule VLBrownlee | |||
5////86 5/1//86 5/g//86 5/ 86 5/ /86 5/ /86 | |||
RII RII NRR NRR | |||
i LReyes RWalker TNovak BGrimes | |||
1 5/ /86 5/ /86 5/ /86 5/ /86 | |||
_ - . _ . _ _ _ _ _ | |||
}} | }} | ||
Revision as of 10:16, 30 December 2020
| ML20205A112 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/05/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20205A116 | List: |
| References | |
| NUDOCS 8608110306 | |
| Download: ML20205A112 (5) | |
See also: IR 05000424/1985054
Text
-
f.g
LcY8%f
v
. .
August 5, 1986
Georgia Power Company
/ ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 2, OPERATIONS TRAINING
AND QUALIFICATION
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC on August 19, 1985. Periodic
inspections were conducted at the Vogtle site, and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews were also conducted in NRC Bethesda offices, and the findings
from these reviews have also been discussed with your staff.
Areas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report. Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The primary results of module 2 reviews and inspections are provided in the
summary and conclusions section of the enclosed report. Within the findings
section, several deficiencies are identified. Your attention is invited to these
matters which will be pursued during future reviews and inspections.
Based upon the NRC review and inspection of those activities identified in the
module, we consider that several examples existed where regulatory requirements
and guidance were not adequately implemented, that significant administrative
deficiencies existed with training program implementation, and that, in our
judgement, some specific areas of training required improvement to assure effec-
tive training of personnel. In many cases, you initiated appropriate corrective
actions which should resolve the noted deficiencies. In some cases, your
previously planned activities for improved training had not been completely
established or implemented at the time of our inspections and consequently could
not be evaluated by the NRC at that time. As described in the enclosed report,
some areas of training considered by the NRC to be deficient still require ^
further resolution. This resolution will be integrated into the plant licensing
process.
Training content, quality, and effectiveness appeared to be satisfactory,
with the exception of walkthrough training, Technical Specification training,
emergency planning training and training for mitigation of core damage. .
Additionally, sufficient resources appeared to be allocated to ensure '
satisfactory training program implementation, and Georgia Power Company
employees appeared to be supportive of your training programs.
l
8608110306 860805 I
- PDR ADOCK 05000424
_ _ - - -
"""
. _ . - .
Tb(ol
.
-
. .
Georgia Power Company 2 August 5, 1986
We will again be inspecting your programs for training and qualification of
,=
personnel prior to licensing as part of the Near Term Operating License inspec-
tior' program and during that inspection, we will assess the adequacy of implemen-
tation of corrective actions as:;ociated with this review. It is expected that,
~a t that time, all open items and unresolved issues associated with training
should be corrected.
Based upon your responsiveness and your ongoing efforts to correct the deficien-
cies noted during this review, it appears that module 2 will be acceptable once
corrective actions have been satisfactorily implemented and remaining concerns
have been adequately resolved.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(original signed by)
J. Nelson Grace
Regional Administrator
Enclosure:
Inspection Report No. 50-424/85-54
cc w/ encl:
- P. O'Reilly, Senior Vice
President
d.E.Conway,SeniorVicePresident&
Project Director
I 0. Foster, Vice President, Project
Support
T D. Rice, Vice President, Project
Engineering
Jc'H.Pinson,VicePresident, Project
Construction
J T. Beckham, Vice President &
General Manager - Operations
z X A. Thomas, Vice President,
Licensing
gC. W. Ilayes, Vogtle Quality
Assurance Manager
LW. C. Ramsey, Manager -
Readiness Review
4K B. Bockhold, General Manager,
, Nuclear Operations
vt. Gucwa, Manager, Nuclear Safety
and Licensing
(cc cont'd. - see page 3)
f:
.
. .
Georgia Power Company 3 August 5, 1986
(cc w/ enc 1 cont'd.)
M[ H. Googe, Project
JonstructionManager
IF. D. Groover, Quality
Assurance Site Manager -
Construction
DrA. Bailey,ProjectLicensing
Manager
LG/F. Trowbridge, Esq. , Shaw,
fittman, Potts and Trowbridge
L8'. W. Churchill, Esq. , Shaw,
fittman, Potts and Trowbridge
L-C. L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
g E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
(J( G. Ledbetter, Connissioner,
Department of Human Resources
F. H. Badger, Office of Planning
and Budget
Br'Kirkland, III, Counsel,
Office of the Consumer's Utility
, Jo'uncil
W. C. Teper, Georgians Against
Nuclear Energy
LJ1. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
Jr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
LG (A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
-
Panel
LS/P. Garde, Citizens Ciinic, Director
Government Accountability Project
bec w/ encl:
/, B'. Bordenick, 0GC
M Reis, 0GC
LW'.,M. Hil1, IE
-. Miller, NRR
< rach, ED0
,J/Sinkule,RII
Christnot, RII
VNRC Resident Inspector
Document Control Desk
State of Georgia
..
s
.
. .
Georgia Power Company 4 August 5, 1986
l
' ~
b
RII RII RII RII
CJulian - AGibson
kW
MSinkule
,
FMcCoy:btm BWilson
l 06/ /86 06/ /86 06/ /86 06/ /86 06/ /86
ThI
RII
fulf a v
RI RI NRR
NW NRg "
VLTro lee eyes R TNovat BGrime
' 06
-
/ / /86 6 06/ /86 06/ ,/86
cfl/86 ct 9f l(.(t6 oglet 09lof
,
.. .
.e
. .
Georgia Power Company 3
cc w/enci cont'd.
J. A. Bailey, Project Licensing
M'inager
G. F. Trowbridge, Esq., Shaw,
Pittman, Potts and Trowbridge
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
E. L. Blake, Jr.,-Esq., Shaw,
Pittman, Potts and Trowbridge
J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
J. G..Ledbetter, Commissioner,
Department of Human Resources
C. H. Badger, Office of Planning
and Budget
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. C. Teper, Georgians Against
Nuclear Energy
M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
Dr.'0. H. Paris, Administrative Judge
Atomic Safety and' Licensing Board
Panel
G. A. Linenberger, Jr., Administrative Judge
Atomic Safety.and Licensing Board
Panel
B. P. Garde, Citizens Clinic, Director
Government Accountability Project
E
bec w/ encl:
E. Reis , Ete-C Cr C-
W. M. Hill, IE
M. Miller, NRR
W. Brach, ED0
M. Sinkule, RII
E. Christnot, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
.
RII RII RII RI RII RII
J 3/gv
cc y: Toon CJhl n AGi on MSinkule VLBrownlee
5////86 5/1//86 5/g//86 5/ 86 5/ /86 5/ /86
i LReyes RWalker TNovak BGrimes
1 5/ /86 5/ /86 5/ /86 5/ /86
_ - . _ . _ _ _ _ _