                                              August 5, 1986
        Georgia Power Company
      / ATTN: Mr. J. H. Miller, Jr.
                President
        P. O. Box 4545
        Atlanta, GA 30302
        Gentlemen:
        SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 2, OPERATIONS TRAINING
                    AND QUALIFICATION
        The NRC has completed a detailed review, inspection, and verification of the
        subject module which you submitted to the NRC on August 19, 1985. Periodic
        inspections were conducted at the Vogtle site, and the resultant findings were
        discussed with members of your staff at the conclusion of these inspections.
        Technical reviews were also conducted in NRC Bethesda offices, and the findings
        from these reviews have also been discussed with your staff.
        Areas contained in the module which were reviewed, examined, and verified are
        identified in the enclosed report.      Within these areas, the inspection and
        verification consisted of selected examinations of procedures and representative
        records, discussions with personnel, observations of activities in progress, and
        review of your licensing commitments.
        The primary results of module 2 reviews and inspections are provided in the
        summary and conclusions section of the enclosed report. Within the findings
        section, several deficiencies are identified. Your attention is invited to these
        matters which will be pursued during future reviews and inspections.
        Based upon the NRC review and inspection of those activities identified in the
        module, we consider that several examples existed where regulatory requirements
        and guidance were not adequately implemented, that significant administrative
        deficiencies existed with training program implementation, and that, in our
        judgement, some specific areas of training required improvement to assure effec-
        tive training of personnel. In many cases, you initiated appropriate corrective
        actions which should resolve the noted deficiencies. In some cases, your
        previously planned activities for improved training had not been completely
        established or implemented at the time of our inspections and consequently could
        not be evaluated by the NRC at that time. As described in the enclosed report,
        some areas of training considered by the NRC to be deficient still require              ^
        further resolution. This resolution will be integrated into the plant licensing
        process.
        Training content, quality, and effectiveness appeared to be satisfactory,
        with the exception of walkthrough training, Technical Specification training,
        emergency planning training and training for mitigation of core damage. .
        Additionally, sufficient resources appeared to be allocated to ensure '
        satisfactory training program implementation, and Georgia Power Company
        employees appeared to be supportive of your training programs.
l
          8608110306 860805                                                                I
:        PDR    ADOCK 05000424
      _      _    - - -
                              """
                            . _ .          -                .
                                                                                          Tb(ol
                                                                                              .
                                                                                                -
 
  .      .
        Georgia Power Company                      2                August 5, 1986
        We will again be inspecting your programs for training and qualification of
,=
        personnel prior to licensing as part of the Near Term Operating License inspec-
        tior' program and during that inspection, we will assess the adequacy of implemen-
        tation of corrective actions as:;ociated with this review.    It is expected that,
      ~a t that time, all open items and unresolved issues associated with training
        should be corrected.
        Based upon your responsiveness and your ongoing efforts to correct the deficien-
        cies noted during this review, it appears that module 2 will be acceptable once
#
        corrective actions have been satisfactorily implemented and remaining concerns
        have been adequately resolved.
        Should you have any questions concerning this letter, please contact us.
                                                  Sincerely,
                                              (original signed by)
                                                  J. Nelson Grace
                                                  Regional Administrator
        Enclosure:
        Inspection Report No. 50-424/85-54
        cc w/ encl:
      # P. O'Reilly, Senior Vice
            President
    d.E.Conway,SeniorVicePresident&
            Project Director
      I 0. Foster, Vice President, Project
            Support
      T D. Rice, Vice President, Project
            Engineering
      Jc'H.Pinson,VicePresident, Project
            Construction
        J    T. Beckham, Vice President &
            General Manager - Operations
    z X A. Thomas, Vice President,
            Licensing
    gC. W. Ilayes, Vogtle Quality
            Assurance Manager
    LW. C. Ramsey, Manager -
            Readiness Review
      4K B. Bockhold, General Manager,
        , Nuclear Operations
    vt. Gucwa, Manager, Nuclear Safety
            and Licensing
        (cc cont'd. - see page 3)
 
f:
    .
      .      .
            Georgia Power Company                    3 August 5, 1986
            (cc w/ enc 1 cont'd.)
            M[ H. Googe, Project
                JonstructionManager
            IF. D. Groover, Quality
                Assurance Site Manager -
                Construction
          DrA. Bailey,ProjectLicensing
                Manager
          LG/F. Trowbridge, Esq. , Shaw,
                fittman, Potts and Trowbridge
          L8'. W. Churchill, Esq. , Shaw,
              fittman, Potts and Trowbridge
          L-C. L. Blake, Jr., Esq., Shaw,
                Pittman, Potts and Trowbridge
          g E. Joiner, Troutman, Sanders,
                Lockerman and Ashmore
            (J( G. Ledbetter, Connissioner,
                Department of Human Resources
            F. H. Badger, Office of Planning
                and Budget
            Br'Kirkland, III, Counsel,
                Office of the Consumer's Utility
            , Jo'uncil
          W. C. Teper, Georgians Against
                Nuclear Energy
          LJ1. B. Margulies, Esq., Chairman,
                Atomic Safety and Licensing Board
                Panel
          Jr. O. H. Paris, Administrative Judge
                Atomic Safety and Licensing Board
                Panel
          LG (A. Linenberger, Jr., Administrative Judge
                Atomic Safety and Licensing Board
  -
                Panel
          LS/P. Garde, Citizens Ciinic, Director
                Government Accountability Project
            bec w/ encl:
        /, B'. Bordenick, 0GC
          M Reis, 0GC
            LW'.,M. Hil1, IE
              -. Miller, NRR
              < rach, ED0
          ,J/Sinkule,RII
                  Christnot, RII
          VNRC Resident Inspector
            Document Control Desk
            State of Georgia
 
  ..
          s
      .
        .      .
            Georgia Power Company                4        August 5, 1986
l
                            '              ~
            b
            RII              RII        RII                  RII
                                        CJulian -  AGibson
                                                              kW
                                                              MSinkule
,
            FMcCoy:btm      BWilson
l          06/ /86          06/ /86    06/ /86    06/ /86  06/ /86
                                                              ThI
            RII
            fulf a v
                            RI        RI          NRR
                                                    NW        NRg "
            VLTro lee          eyes    R          TNovat    BGrime
'          06
                          -
                                / / /86        6    06/ /86  06/ ,/86
          cfl/86 ct                      9f l(.(t6  oglet    09lof
,
 
        *
  ..      .
  .e
      .      .
            Georgia Power Company                    3
            cc w/enci cont'd.
            J. A. Bailey, Project Licensing
                M'inager
            G. F. Trowbridge, Esq., Shaw,
                Pittman, Potts and Trowbridge
          B. W. Churchill, Esq., Shaw,
                Pittman, Potts and Trowbridge
            E. L. Blake, Jr.,-Esq., Shaw,
                Pittman, Potts and Trowbridge
            J. E. Joiner, Troutman, Sanders,
                Lockerman and Ashmore
            J. G..Ledbetter, Commissioner,
                Department of Human Resources
            C. H. Badger, Office of Planning
                and Budget
            D. Kirkland, III, Counsel,
                Office of the Consumer's Utility
                Council
            D. C. Teper, Georgians Against
                Nuclear Energy
            M. B. Margulies, Esq., Chairman,
                Atomic Safety and Licensing Board
                Panel
            Dr.'0. H. Paris, Administrative Judge
                Atomic Safety and' Licensing Board
                Panel
            G. A. Linenberger, Jr., Administrative Judge
                Atomic Safety.and Licensing Board
                Panel
            B. P. Garde, Citizens Clinic, Director
                Government Accountability Project
            E
            bec w/ encl:
            E. Reis , Ete-C Cr C-
            W. M. Hill, IE
            M. Miller, NRR
            W. Brach, ED0
            M. Sinkule, RII
            E. Christnot, RII
            NRC Resident Inspector
            Document Control Desk
            State of Georgia
                                                  .
            RII              RII            RII        RI      RII              RII
                    J          3/gv
                cc y:            Toon      CJhl n      AGi on  MSinkule        VLBrownlee
            5////86          5/1//86        5/g//86    5/  86 5/ /86          5/ /86
            RII              RII            NRR        NRR
i          LReyes            RWalker        TNovak      BGrimes
1          5/ /86            5/ /86        5/ /86      5/ /86
                                                                          _ - . _ . _ _ _ _ _
}}
}}

Revision as of 10:16, 30 December 2020

Forwards Insp Rept 50-424/85-54 on Readiness Review Module 2 Submitted on 850819.Several Deficiencies Identified Where Regulatory Requirements & Guidance Inadequately Implemented
ML20205A112
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/05/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20205A116 List:
References
NUDOCS 8608110306
Download: ML20205A112 (5)


See also: IR 05000424/1985054

Text

-

f.g

LcY8%f

v

. .

August 5, 1986

Georgia Power Company

/ ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 2, OPERATIONS TRAINING

AND QUALIFICATION

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on August 19, 1985. Periodic

inspections were conducted at the Vogtle site, and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were also conducted in NRC Bethesda offices, and the findings

from these reviews have also been discussed with your staff.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report. Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The primary results of module 2 reviews and inspections are provided in the

summary and conclusions section of the enclosed report. Within the findings

section, several deficiencies are identified. Your attention is invited to these

matters which will be pursued during future reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we consider that several examples existed where regulatory requirements

and guidance were not adequately implemented, that significant administrative

deficiencies existed with training program implementation, and that, in our

judgement, some specific areas of training required improvement to assure effec-

tive training of personnel. In many cases, you initiated appropriate corrective

actions which should resolve the noted deficiencies. In some cases, your

previously planned activities for improved training had not been completely

established or implemented at the time of our inspections and consequently could

not be evaluated by the NRC at that time. As described in the enclosed report,

some areas of training considered by the NRC to be deficient still require ^

further resolution. This resolution will be integrated into the plant licensing

process.

Training content, quality, and effectiveness appeared to be satisfactory,

with the exception of walkthrough training, Technical Specification training,

emergency planning training and training for mitigation of core damage. .

Additionally, sufficient resources appeared to be allocated to ensure '

satisfactory training program implementation, and Georgia Power Company

employees appeared to be supportive of your training programs.

l

8608110306 860805 I

PDR ADOCK 05000424

_ _ - - -

"""

. _ . - .

Tb(ol

.

-

. .

Georgia Power Company 2 August 5, 1986

We will again be inspecting your programs for training and qualification of

,=

personnel prior to licensing as part of the Near Term Operating License inspec-

tior' program and during that inspection, we will assess the adequacy of implemen-

tation of corrective actions as:;ociated with this review. It is expected that,

~a t that time, all open items and unresolved issues associated with training

should be corrected.

Based upon your responsiveness and your ongoing efforts to correct the deficien-

cies noted during this review, it appears that module 2 will be acceptable once

corrective actions have been satisfactorily implemented and remaining concerns

have been adequately resolved.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by)

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/85-54

cc w/ encl:

  1. P. O'Reilly, Senior Vice

President

d.E.Conway,SeniorVicePresident&

Project Director

I 0. Foster, Vice President, Project

Support

T D. Rice, Vice President, Project

Engineering

Jc'H.Pinson,VicePresident, Project

Construction

J T. Beckham, Vice President &

General Manager - Operations

z X A. Thomas, Vice President,

Licensing

gC. W. Ilayes, Vogtle Quality

Assurance Manager

LW. C. Ramsey, Manager -

Readiness Review

4K B. Bockhold, General Manager,

, Nuclear Operations

vt. Gucwa, Manager, Nuclear Safety

and Licensing

(cc cont'd. - see page 3)

f:

.

. .

Georgia Power Company 3 August 5, 1986

(cc w/ enc 1 cont'd.)

M[ H. Googe, Project

JonstructionManager

IF. D. Groover, Quality

Assurance Site Manager -

Construction

DrA. Bailey,ProjectLicensing

Manager

LG/F. Trowbridge, Esq. , Shaw,

fittman, Potts and Trowbridge

L8'. W. Churchill, Esq. , Shaw,

fittman, Potts and Trowbridge

L-C. L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

g E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

(J( G. Ledbetter, Connissioner,

Department of Human Resources

F. H. Badger, Office of Planning

and Budget

Br'Kirkland, III, Counsel,

Office of the Consumer's Utility

, Jo'uncil

W. C. Teper, Georgians Against

Nuclear Energy

LJ1. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Jr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

LG (A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

-

Panel

LS/P. Garde, Citizens Ciinic, Director

Government Accountability Project

bec w/ encl:

/, B'. Bordenick, 0GC

M Reis, 0GC

LW'.,M. Hil1, IE

-. Miller, NRR

< rach, ED0

,J/Sinkule,RII

Christnot, RII

VNRC Resident Inspector

Document Control Desk

State of Georgia

..

s

.

. .

Georgia Power Company 4 August 5, 1986

l

' ~

b

RII RII RII RII

CJulian - AGibson

kW

MSinkule

,

FMcCoy:btm BWilson

l 06/ /86 06/ /86 06/ /86 06/ /86 06/ /86

ThI

RII

fulf a v

RI RI NRR

NW NRg "

VLTro lee eyes R TNovat BGrime

' 06

-

/ / /86 6 06/ /86 06/ ,/86

cfl/86 ct 9f l(.(t6 oglet 09lof

,

.. .

.e

. .

Georgia Power Company 3

cc w/enci cont'd.

J. A. Bailey, Project Licensing

M'inager

G. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

E. L. Blake, Jr.,-Esq., Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G..Ledbetter, Commissioner,

Department of Human Resources

C. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. C. Teper, Georgians Against

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr.'0. H. Paris, Administrative Judge

Atomic Safety and' Licensing Board

Panel

G. A. Linenberger, Jr., Administrative Judge

Atomic Safety.and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

E

bec w/ encl:

E. Reis , Ete-C Cr C-

W. M. Hill, IE

M. Miller, NRR

W. Brach, ED0

M. Sinkule, RII

E. Christnot, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

.

RII RII RII RI RII RII

J 3/gv

cc y: Toon CJhl n AGi on MSinkule VLBrownlee

5////86 5/1//86 5/g//86 5/ 86 5/ /86 5/ /86

RII RII NRR NRR

i LReyes RWalker TNovak BGrimes

1 5/ /86 5/ /86 5/ /86 5/ /86