Forwards Insp Rept 50-424/85-54 on Readiness Review Module 2 Submitted on 850819.Several Deficiencies Identified Where Regulatory Requirements & Guidance Inadequately Implemented
ML20205A112
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/05/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20205A116 List:
References
NUDOCS 8608110306
Download: ML20205A112 (5)


See also: IR 05000424/1985054

Text

-

LcY8%f

f.g

v

.

.

August 5, 1986

Georgia Power Company

/ ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 2, OPERATIONS TRAINING

AND QUALIFICATION

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on August 19, 1985.

Periodic

inspections were conducted at the Vogtle site, and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were also conducted in NRC Bethesda offices, and the findings

from these reviews have also been discussed with your staff.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The primary results of module 2 reviews and inspections are provided in the

summary and conclusions section of the enclosed report.

Within the findings

section, several deficiencies are identified.

Your attention is invited to these

matters which will be pursued during future reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we consider that several examples existed where regulatory requirements

and guidance were not adequately implemented, that significant administrative

deficiencies existed with training program implementation, and that, in our

judgement, some specific areas of training required improvement to assure effec-

tive training of personnel.

In many cases, you initiated appropriate corrective

actions which should resolve the noted deficiencies.

In some cases, your

previously planned activities for improved training had not been completely

established or implemented at the time of our inspections and consequently could

not be evaluated by the NRC at that time.

As described in the enclosed report,

some areas of training considered by the NRC to be deficient still require

^

further resolution.

This resolution will be integrated into the plant licensing

process.

Training content, quality, and effectiveness appeared to be satisfactory,

with the exception of walkthrough training, Technical Specification training,

emergency planning training and training for mitigation of core damage. .

Additionally, sufficient resources appeared to be allocated to ensure '

satisfactory training program implementation, and Georgia Power Company

employees appeared to be supportive of your training programs.

l

8608110306 860805

I

Tb(ol

PDR

ADOCK 05000424

"""

_

_

- - -

.

.

-

.

.

-

.

.

Georgia Power Company

2

August 5, 1986

We will again be inspecting your programs for training and qualification of

personnel prior to licensing as part of the Near Term Operating License inspec-

, =

tior' program and during that inspection, we will assess the adequacy of implemen-

tation of corrective actions as:;ociated with this review.

It is expected that,

~ t that time, all open items and unresolved issues associated with training

a

should be corrected.

Based upon your responsiveness and your ongoing efforts to correct the deficien-

cies noted during this review, it appears that module 2 will be acceptable once

corrective actions have been satisfactorily implemented and remaining concerns

have been adequately resolved.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by)

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/85-54

cc w/ encl:

  1. P. O'Reilly, Senior Vice

President

d.E.Conway,SeniorVicePresident&

Project Director

I 0. Foster, Vice President, Project

Support

T D. Rice, Vice President, Project

Engineering

Jc'H.Pinson,VicePresident, Project

Construction

J

T. Beckham, Vice President &

General Manager - Operations

z X A. Thomas, Vice President,

Licensing

gC. W. Ilayes, Vogtle Quality

Assurance Manager

LW. C. Ramsey, Manager -

Readiness Review

4K B. Bockhold, General Manager,

, Nuclear Operations

vt. Gucwa, Manager, Nuclear Safety

and Licensing

(cc cont'd. - see page 3)

f:

.

.

.

Georgia Power Company

3

August 5, 1986

(cc w/ enc 1 cont'd.)

M[ H. Googe, Project

JonstructionManager

IF. D. Groover, Quality

Assurance Site Manager -

Construction

DrA. Bailey,ProjectLicensing

Manager

LG/F. Trowbridge, Esq. , Shaw,

fittman, Potts and Trowbridge

L8'. W. Churchill, Esq. , Shaw,

fittman, Potts and Trowbridge

L-C. L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

g E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

(J( G. Ledbetter, Connissioner,

Department of Human Resources

F. H. Badger, Office of Planning

and Budget

Br'Kirkland, III, Counsel,

Office of the Consumer's Utility

, Jo'uncil

W. C. Teper, Georgians Against

Nuclear Energy

LJ1. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Jr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

LG (A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

-

LS/P. Garde, Citizens Ciinic, Director

Government Accountability Project

bec w/ encl:

/, B'. Bordenick, 0GC

M Reis, 0GC

LW'.,M. Hil1, IE

-. Miller, NRR

< rach, ED0

,J/Sinkule,RII

Christnot, RII

VNRC Resident Inspector

Document Control Desk

State of Georgia

s

..

.

.

.

Georgia Power Company

4

August 5, 1986

l

b

'

~

RII

RII

RII

RIIkW

FMcCoy:btm

BWilson

CJulian -

AGibson

MSinkule

,

l

06/ /86

06/ /86

06/ /86

06/ /86

06/ /86

ThI

NRg "

RII

RI

RI

NRR

fulf a v

NW

VLTro lee

eyes

R

TNovat

BGrime

l

cfl/86

-

/ / /86

6

06/ /86

06/ ,/86

06

9f

l(.(t6

oglet

09lof

'

ct

,

..

.

.e

.

.

Georgia Power Company

3

cc w/enci cont'd.

J. A. Bailey, Project Licensing

M'inager

G. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

E. L. Blake, Jr.,-Esq., Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G..Ledbetter, Commissioner,

Department of Human Resources

C. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. C. Teper, Georgians Against

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr.'0. H. Paris, Administrative Judge

Atomic Safety and' Licensing Board

Panel

G. A. Linenberger, Jr., Administrative Judge

Atomic Safety.and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

E

bec w/ encl:

E. Reis , Ete-C Cr C-

W. M. Hill, IE

M. Miller, NRR

W. Brach, ED0

M. Sinkule, RII

E. Christnot, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

.

RII

RII

RII

RI

RII

RII

J

3/gv

CJhl

AGi on

MSinkule

VLBrownlee

cc y:

Toon

n

5////86

5/1//86

5/g//86

5/

86

5/ /86

5/ /86

RII

RII

NRR

NRR

i

LReyes

RWalker

TNovak

BGrimes

1

5/ /86

5/ /86

5/ /86

5/ /86

- . .