ML20137B811: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[IR 05000271/1985019]]
{{Adams
| number = ML20137B811
| issue date = 12/31/1985
| title = Ack Receipt of 851004 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-271/85-19.Written Results of Review of Implementation Schedule for Permanent Correction to Hardware Should Be Provided within 20 Days
| author name = Martin T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Murphy W
| addressee affiliation = VERMONT YANKEE NUCLEAR POWER CORP.
| docket = 05000271
| license number =
| contact person =
| document report number = NUDOCS 8601160081
| package number = ML20137B815
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000271/1985019]]
 
=Text=
{{#Wiki_filter:r                                                                                        tsicnC
                                                                                          w} W
    '
  ..
        e }-                            g -                  -- -'~f
                                              . . . - . - , - . - -
                                                                          [ ,,.,,_..'                    \
                                                                                                          .;
                                        \ ,.                            .
                                                                                              . - , . - -
                                        ; o..                  --
                                                __. .
                                                      -
                                                                2
                                                                      - gg 31            . . . _
              Docket No. 50-271/85-19
              Vermont Yankee Nuclear Power Corporation
              ATTN:    Mr. Warren P. Murphy
                        Vice President and Manager
                            of Operations
              RD 5, Box 169
              Ferry Road
              Brattleboro, Vennont 05301
              Gentlemen:
              Subject:      Inspection No. 50-271/85-19
              This refers to your letter dated October 4,1985, in response to our letter
              dated September 6,1985.
              Thank you for informing us of the corrective and preventive actions documented
              in your letter. These actions will be examined during a future inspection of
              your licensed program.
              Your response to Violation B stated that an interim compensatory measure to
              assure CAS-SAS monitoring effectiveness would be implemented until a permanent
              correction to the hardware is made. As discussed in a telephone conversation
              between Mr. Babbitt of your staff and Mr. Madden of this office on November
              21, 1985, we request that you review the schedule identified in your October 4
              letter in an effort to expedite implementation of a permanent solution.
              Please provide us the results of your review, . including justification for the
              schedule, in writing, within twenty days of receipt of this letter. In
              addition, we note that the interim compensatory measure which was implemented
              constitutes a change in your NRC approved physical security plan and, therefore,
              must be handled accordingly.
              The response requested by this letter is not subject to the clearance proce-
              dures of the Office of Management and Budget as required by the Paperwork of
              Reduction Act of 1980, PL 96-511.
              Your cooperation with us is appreciated.
                                                                      Sincerely,  ,
            -
                      -c'    ***.-y.-                                  original signeOF&
        v                      .,                                    Jates H. Joyner
        %                                                            Thomas T. Martin, Director
                              .
                                '9
          i.
                                                                                    .
                        . .
                                                                      Division of Radiation Safety
          7 ;-                                                        and Safeguards
                                              0FFICIAL RECORD COPY                                                                      '
                                                          -
                                                                    -
                                                                      " ,,., RLJEMIF- 11/20/86- vuut.g.0- ~ "
                                                                                                                        ;
                                                            -
                                                  -
                                                                                                                    gl
                                                          .
                                      _.                                                        ....
                                                                                '
      8601160001 85                            L;                                        _ _ __
              ADOCK 0          PDR
                                                    *
                                                            -      '~'      ~'                                              ,
                                                                                                                                        ,
      gDR                                                                                                                          '
                                                                                                                              =](    g
                                                                                                                                        .
                                                                                                      .      .
                                                                                                              ..._.s._  , .,    ,
 
r
'
  '
                      .;
    .- e '.
            Ver-ent Yankee Nuclear Power Cerp.      2
                                                          DG31IM
            cc:
            R. W. Capstick, Licensing Engineer
            W. F. Conway, President and Chief Executive Officer
            J. P. Pelletier, Plant Manager
            Donald Hunter, Vice President
            Cort Richardson, Vermont Public Interest Research Group, Inc.
            Public Document Room (POR)
            Local Public Document Room (LPDR)
            Nuclear Safety Information Center (NSIC)
            NRC Resident Inspector
            State of New Hampshire
            State of Vermont
            bec:
            Region I Docket Room (with concurrences)
            Management Ass.istant, DRMA
            Section Chief,'DRP
            M. McBride, RI', Pilgrim
            H. Eichenholz, SRI, Yankee
            V. Rooney, LPM, NRR
            RI:DRSS          RI:DR          RI  SS            S
            Madden /mjh      Kush          Keimig          ner
            11/ 2-/85        11/ 4          2$/9/85          /85
                            I
                                      0FFICIAL RECORD COPY    RL VY 85-19 - 0002.0.0
                                                              11/27/85
}}

Revision as of 00:40, 1 July 2020

Ack Receipt of 851004 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-271/85-19.Written Results of Review of Implementation Schedule for Permanent Correction to Hardware Should Be Provided within 20 Days
ML20137B811
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/31/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20137B815 List:
References
NUDOCS 8601160081
Download: ML20137B811 (2)


See also: IR 05000271/1985019

Text

r tsicnC

w} W

'

..

e }- g - -- -'~f

. . . - . - , - . - -

[ ,,.,,_..' \

.;

\ ,. .

. - , . - -

o.. --

__. .

-

2

- gg 31 . . . _

Docket No. 50-271/85-19

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager

of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vennont 05301

Gentlemen:

Subject: Inspection No. 50-271/85-19

This refers to your letter dated October 4,1985, in response to our letter

dated September 6,1985.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a future inspection of

your licensed program.

Your response to Violation B stated that an interim compensatory measure to

assure CAS-SAS monitoring effectiveness would be implemented until a permanent

correction to the hardware is made. As discussed in a telephone conversation

between Mr. Babbitt of your staff and Mr. Madden of this office on November

21, 1985, we request that you review the schedule identified in your October 4

letter in an effort to expedite implementation of a permanent solution.

Please provide us the results of your review, . including justification for the

schedule, in writing, within twenty days of receipt of this letter. In

addition, we note that the interim compensatory measure which was implemented

constitutes a change in your NRC approved physical security plan and, therefore,

must be handled accordingly.

The response requested by this letter is not subject to the clearance proce-

dures of the Office of Management and Budget as required by the Paperwork of

Reduction Act of 1980, PL 96-511.

Your cooperation with us is appreciated.

Sincerely, ,

-

-c' ***.-y.- original signeOF&

v ., Jates H. Joyner

% Thomas T. Martin, Director

.

'9

i.

.

. .

Division of Radiation Safety

7 ;- and Safeguards

0FFICIAL RECORD COPY '

-

-

" ,,., RLJEMIF- 11/20/86- vuut.g.0- ~ "

-

-

gl

.

_. ....

'

8601160001 85 L; _ _ __

ADOCK 0 PDR

- '~' ~' ,

,

gDR '

=]( g

.

. .

..._.s._ , ., ,

r

'

'

.;

.- e '.

Ver-ent Yankee Nuclear Power Cerp. 2

DG31IM

cc:

R. W. Capstick, Licensing Engineer

W. F. Conway, President and Chief Executive Officer

J. P. Pelletier, Plant Manager

Donald Hunter, Vice President

Cort Richardson, Vermont Public Interest Research Group, Inc.

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

bec:

Region I Docket Room (with concurrences)

Management Ass.istant, DRMA

Section Chief,'DRP

M. McBride, RI', Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

RI:DRSS RI:DR RI SS S

Madden /mjh Kush Keimig ner

11/ 2-/85 11/ 4 2$/9/85 /85

I

0FFICIAL RECORD COPY RL VY 85-19 - 0002.0.0

11/27/85