| {{#Wiki_filter:}} | | {{#Wiki_filter:'; Ey Entergy Nuclear South 1340 Echelon Parkway Jackson, MS 39213 |
| | '-oo-EnterV Tel 601 368 5670 Fax 601 368 5799 jderoytentergy.com Joseph P. DeRoy Vice President Operations Support CNRO-2004-00074 November 19, 2004 Mr. J.E. Dyer Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 |
| | |
| | ==SUBJECT:== |
| | Request for extension to answer the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) |
| | River Bend Station Grand Gulf Nuclear Station Docket No. 50-458 Docket No. 50-416 License No. NPF-47 License No. NPF-29 Arkansas Nuclear One Waterford 3 Steam Electric Units I & 2 Station Docket Nos. 50-313 & 50-368 Docket No. 50-382 License Nos. DPR-51 & NPF-6 License No. NPF-38 |
| | |
| | ==REFERENCE:== |
| | NRC Letter from J. E. Dyer to Holders of Licenses for Power and Research and Test Reactors as listed in Attachment 1, dated November 5, 2004 regarding Order Imposing Requirements for the Protection of Certain Safeguards Information (RBC-50233, GNRI-2004100141, OCNA110401, ILN04-0126) |
| | Dear Mr. Dyer Section IV of the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) ("Order") states that, in accordance with 10 CFR §2.202, the recipient of the Order must submit an answer to the Order, and may request a hearing on the Order, within 20 days of the date of the Order. Attachment 2 to the Order, Modified Handling Requirements for the Protections of Certain Safeguards Information (SGI-M), which is incorporated by reference into the Order, contains detailed requirements which recipients of the Order must meet. |
| | Pursuant to the provisions of Section IV of the Order, the above captioned licensees (hereinafter "Entergy") hereby requests an extension of time in which to submit an answer to or |
| | |
| | CNRO-2004-00074 Page 2 of 3 request a hearing with respect to one or more provisions of the Order. The implications of the Order to licensees who have a program for controlling Safeguards Information that meets all current regulatory requirements is not clear, and the granting of time to interact with the NRC to ensure that the Commission's intent in issuing the Order and how it is to be implemented is clear is both necessary and appropriate. |
| | Entergy requests an extension of time to answer the Order not to exceed twenty (20) days after clarification of the following issues: |
| | : 1. Clarify that an existing Safeguards Information program can be used and how it can be used to satisfy the Order (i.e., a separate SGI-M program is not required), and that no changes to that Safeguards Information program are required by the Order. |
| | : 2. Attachment 2 establishes different, and in some cases, more restrictive requirements than our existing Safeguards Information program. |
| | : 3. Resolution of potential programmatic compliance issues arising when a licensee uses its existing Safeguards Information program but must interface with an entity using an SGI-M program where the requirements are different (e.g., double versus single envelopes; differing requirements on telecommunications). |
| | The need for clarity regarding these and related issues constitutes good cause for the requested extension to be granted. During this period, Entergy will control all material designated SGI-M under its Safeguards Information program. Entergy also requests that the Commission exercise enforcement discretion during this period. |
| | If you have any questions, or require additional information, please contact Mr. L. A. England at 601-369-5766. This letter includes no new commitments. |
| | I declare under penalty of perjury that the foregoing is true and correct executed this 1 9 th day of November, 2004. |
| | Sincerely, cc: (See next page) |
| | |
| | CNRO-2004-00074 Page 3 of 3 cc: |
| | Mr. W. R. Campbell (ECH) Mr. J. R. McGaha (ECH) |
| | Mr. W. A. Eaton (ECH) Mr. L. J. Smith (Wise Carter) |
| | Mr. J. S. Forbes (ANO) Mr. G. J. Taylor (ECH) |
| | Mr. P. D. Hinnenkamp (RBS) Mr. J. E. Venable (WF3) |
| | Mr. D. E. Levanway (ECH) Mr. M. J. Wetterhahn (W&S) |
| | Mr. G. A. Williams (GGNS) |
| | Office of the Secretary (Fax) Mr. J. E. Dyer, Director (FedEx) |
| | U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation ATTN: Rulemakings and Adjudications U.S. Nuclear Regulatory Commission Staff Washington, DC 20555-0001 Washington, DC 20555-0001 Director, Office of Nuclear Material Safety Assistant General Counsel for Materials and Safeguards (USPS) Litigation and Enforcement (Fax) |
| | U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Regional Administrator - Region IV U.S. Nuclear Regulatory Commission (FedEx) (Fed Ex) |
| | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 611 Ryan Plaza Drive, Suite 400 One White Flint North Arlington, TX 76011 11555 Rockville Pike Rockville, MD 20852-2738 Mr. T. W. Alexion, P.M., (ANO-2) Mr. P. J. Alter, SRI, RBS w/a Mr. N. Kalyanam, P.M., (W-3) Mr. R. W. Deese, SRI, ANO wla Mr. D. G. Holland, P.M., (ANO-1) Mr. M. C. Hay, SRI, W-3 w/a Mr. B. K. Vaidya, P.M., (GGNS) Mr. T. L. Hoeg, SRI, GGNS w/a Mr. M. K. Webb, P.M., (RBS) (SRIs via Company Mail) |
| | Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 07-D-01 Washington, DC 20555-0001}} |
|
---|
Category:Letter type:CNRO
MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00004, Notice Regarding Acquisition of Title to Leased Interest2016-02-10010 February 2016 Notice Regarding Acquisition of Title to Leased Interest CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00021, Confirmatory Order - Action H2015-11-0303 November 2015 Confirmatory Order - Action H CNRO-2015-00020, ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance2015-09-23023 September 2015 ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00003, RBS Security Confirmatory Order - Action C2015-02-0505 February 2015 RBS Security Confirmatory Order - Action C CNRO-2015-00007, ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments2015-01-30030 January 2015 ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00011, Notice Regarding Renewal of Lease2013-12-0303 December 2013 Notice Regarding Renewal of Lease 2022-05-26
[Table view] |
Text
'; Ey Entergy Nuclear South 1340 Echelon Parkway Jackson, MS 39213
'-oo-EnterV Tel 601 368 5670 Fax 601 368 5799 jderoytentergy.com Joseph P. DeRoy Vice President Operations Support CNRO-2004-00074 November 19, 2004 Mr. J.E. Dyer Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Request for extension to answer the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190)
River Bend Station Grand Gulf Nuclear Station Docket No. 50-458 Docket No. 50-416 License No. NPF-47 License No. NPF-29 Arkansas Nuclear One Waterford 3 Steam Electric Units I & 2 Station Docket Nos. 50-313 & 50-368 Docket No. 50-382 License Nos. DPR-51 & NPF-6 License No. NPF-38
REFERENCE:
NRC Letter from J. E. Dyer to Holders of Licenses for Power and Research and Test Reactors as listed in Attachment 1, dated November 5, 2004 regarding Order Imposing Requirements for the Protection of Certain Safeguards Information (RBC-50233, GNRI-2004100141, OCNA110401, ILN04-0126)
Dear Mr. Dyer Section IV of the November 5, 2004, Order Imposing Requirements for the Protection of Certain Safeguards Information (EA-04-190) ("Order") states that, in accordance with 10 CFR §2.202, the recipient of the Order must submit an answer to the Order, and may request a hearing on the Order, within 20 days of the date of the Order. Attachment 2 to the Order, Modified Handling Requirements for the Protections of Certain Safeguards Information (SGI-M), which is incorporated by reference into the Order, contains detailed requirements which recipients of the Order must meet.
Pursuant to the provisions of Section IV of the Order, the above captioned licensees (hereinafter "Entergy") hereby requests an extension of time in which to submit an answer to or
CNRO-2004-00074 Page 2 of 3 request a hearing with respect to one or more provisions of the Order. The implications of the Order to licensees who have a program for controlling Safeguards Information that meets all current regulatory requirements is not clear, and the granting of time to interact with the NRC to ensure that the Commission's intent in issuing the Order and how it is to be implemented is clear is both necessary and appropriate.
Entergy requests an extension of time to answer the Order not to exceed twenty (20) days after clarification of the following issues:
- 1. Clarify that an existing Safeguards Information program can be used and how it can be used to satisfy the Order (i.e., a separate SGI-M program is not required), and that no changes to that Safeguards Information program are required by the Order.
- 2. Attachment 2 establishes different, and in some cases, more restrictive requirements than our existing Safeguards Information program.
- 3. Resolution of potential programmatic compliance issues arising when a licensee uses its existing Safeguards Information program but must interface with an entity using an SGI-M program where the requirements are different (e.g., double versus single envelopes; differing requirements on telecommunications).
The need for clarity regarding these and related issues constitutes good cause for the requested extension to be granted. During this period, Entergy will control all material designated SGI-M under its Safeguards Information program. Entergy also requests that the Commission exercise enforcement discretion during this period.
If you have any questions, or require additional information, please contact Mr. L. A. England at 601-369-5766. This letter includes no new commitments.
I declare under penalty of perjury that the foregoing is true and correct executed this 1 9 th day of November, 2004.
Sincerely, cc: (See next page)
CNRO-2004-00074 Page 3 of 3 cc:
Mr. W. R. Campbell (ECH) Mr. J. R. McGaha (ECH)
Mr. W. A. Eaton (ECH) Mr. L. J. Smith (Wise Carter)
Mr. J. S. Forbes (ANO) Mr. G. J. Taylor (ECH)
Mr. P. D. Hinnenkamp (RBS) Mr. J. E. Venable (WF3)
Mr. D. E. Levanway (ECH) Mr. M. J. Wetterhahn (W&S)
Mr. G. A. Williams (GGNS)
Office of the Secretary (Fax) Mr. J. E. Dyer, Director (FedEx)
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation ATTN: Rulemakings and Adjudications U.S. Nuclear Regulatory Commission Staff Washington, DC 20555-0001 Washington, DC 20555-0001 Director, Office of Nuclear Material Safety Assistant General Counsel for Materials and Safeguards (USPS) Litigation and Enforcement (Fax)
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Regional Administrator - Region IV U.S. Nuclear Regulatory Commission (FedEx) (Fed Ex)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 611 Ryan Plaza Drive, Suite 400 One White Flint North Arlington, TX 76011 11555 Rockville Pike Rockville, MD 20852-2738 Mr. T. W. Alexion, P.M., (ANO-2) Mr. P. J. Alter, SRI, RBS w/a Mr. N. Kalyanam, P.M., (W-3) Mr. R. W. Deese, SRI, ANO wla Mr. D. G. Holland, P.M., (ANO-1) Mr. M. C. Hay, SRI, W-3 w/a Mr. B. K. Vaidya, P.M., (GGNS) Mr. T. L. Hoeg, SRI, GGNS w/a Mr. M. K. Webb, P.M., (RBS) (SRIs via Company Mail)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 07-D-01 Washington, DC 20555-0001