Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I0CFR2.390                                                              COLR Oyster Creek I Rev. 5 Global Nuclear Fuel - Americas LLC AFFIDAVIT 1, Anthony P. Reese, state as follows:
Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I0CFR2.390                                                              COLR Oyster Creek I Rev. 5 Global Nuclear Fuel - Americas LLC AFFIDAVIT 1, Anthony P. Reese, state as follows:
(1) 1 am the Manager, Reload Design & Analysis, of Global Nuclear Fuel . Americas, LLC (GNF-A), and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(1) 1 am the Manager, Reload Design & Analysis, of Global Nuclear Fuel . Americas, LLC (GNF-A), and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in the GNF-A proprietary report, 0000-0108-7976-FBIR-P, Fuel Bundle Information Report for Oyster Creek Reload 23 Cycle 23, Revision 0, Class III (GNF-A Proprietary Information), dated October 2010. GNF-A proprietary information in 0000-0108-7976-FBIR-P is identified by a dark red dotted underline inside double square brackets. [[his..s1e.ntence.is..anexae...        e..31]] Figures and large equation objects containing GNF-A proprietary information are identified with double square brackets before and after the object. In each case, the superscript notation -refers to Paragraph (3) of this affidavit that provides the basis for the proprietary determination.
(2) The information sought to be withheld is contained in the GNF-A proprietary report, 0000-0108-7976-FBIR-P, Fuel Bundle Information Report for Oyster Creek Reload 23 Cycle 23, Revision 0, Class III (GNF-A Proprietary Information), dated October 2010. GNF-A proprietary information in 0000-0108-7976-FBIR-P is identified by a dark red dotted underline inside double square brackets. ((his..s1e.ntence.is..anexae...        e..31)) Figures and large equation objects containing GNF-A proprietary information are identified with double square brackets before and after the object. In each case, the superscript notation -refers to Paragraph (3) of this affidavit that provides the basis for the proprietary determination.
(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act (FOIA), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4)1 and 2.390(a)(4) for trade secrets (Exemption 4). The material for which exemption from disclosure is here sought also qualifies under the narrower definition of trade secret, within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission, 975 F2d 871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA 704 F2d 1280 (DC Cir. 1983).
(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act (FOIA), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4)1 and 2.390(a)(4) for trade secrets (Exemption 4). The material for which exemption from disclosure is here sought also qualifies under the narrower definition of trade secret, within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission, 975 F2d 871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA 704 F2d 1280 (DC Cir. 1983).
(4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are:
(4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are:
Line 184: Line 184:
("Recipient") in support of the operating license for Oyster Creek (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.
("Recipient") in support of the operating license for Oyster Creek (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.
The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.
The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.
Proprietary Information Notice This is a non-proprietary version of the document 0000-0108-7976-FBIR-P (which has the proprietary information removed). Portions of the document that have been removed are indicated by an open and closed double brackets as shown here[[                           ]].
Proprietary Information Notice This is a non-proprietary version of the document 0000-0108-7976-FBIR-P (which has the proprietary information removed). Portions of the document that have been removed are indicated by an open and closed double brackets as shown here((                           )).
Page 2 COLR Page 30 of 59
Page 2 COLR Page 30 of 59


Line 220: Line 220:
Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390                                                                        COLR Oyster Creek I Rev. 5 Oyster Creek                                          Non-Proprietary Information            0000-01 08-7976-FBIR-NP Reload 23                                                      Class I                                        Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355 (GNF2)
Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390                                                                        COLR Oyster Creek I Rev. 5 Oyster Creek                                          Non-Proprietary Information            0000-01 08-7976-FBIR-NP Reload 23                                                      Class I                                        Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355 (GNF2)
Bundle Number: 3355 Peak Pellet Exposure                  UO2 LHGR Limit GWd/MT (GWd/ST)                            kW/ft Peak Pellet Exposure            Most Limiting Gadolinia LHGR Limit 6 GWd/MT (GWd/ST)                            kW/ft
Bundle Number: 3355 Peak Pellet Exposure                  UO2 LHGR Limit GWd/MT (GWd/ST)                            kW/ft Peak Pellet Exposure            Most Limiting Gadolinia LHGR Limit 6 GWd/MT (GWd/ST)                            kW/ft
[[__________________
((__________________
6 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design        [[
6 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design        ((
I].
I].
Page 10 COLR Page 38 of 59
Page 10 COLR Page 38 of 59
Line 235: Line 235:
Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with IOCFR2.390                                                                          COLR Oyster Creek I Rev. 5 Oyster Creek                                          Non-Proprietary Information            0000-01 08-7976-FBIR-NP Reload 23                                                        Class I                                        Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P I0DG2B370-16GZ- 100T2-145-T6-3356 (GNF2)
Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with IOCFR2.390                                                                          COLR Oyster Creek I Rev. 5 Oyster Creek                                          Non-Proprietary Information            0000-01 08-7976-FBIR-NP Reload 23                                                        Class I                                        Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P I0DG2B370-16GZ- 100T2-145-T6-3356 (GNF2)
Bundle Number: 3356 Peak Pellet Exposure                  U0 2 LHGR  Limit GWd/MT (GWd/ST)                              kW/ft Peak Pellet Exposure            Most Limiting Gadolinia LHGR Limit 9 GWd/MT (GWd/ST)                              kW/ft
Bundle Number: 3356 Peak Pellet Exposure                  U0 2 LHGR  Limit GWd/MT (GWd/ST)                              kW/ft Peak Pellet Exposure            Most Limiting Gadolinia LHGR Limit 9 GWd/MT (GWd/ST)                              kW/ft
[[I 9 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design          [[                   fl.
((I 9 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design          ((                   fl.
Page 13 COLR Page 41 of 59
Page 13 COLR Page 41 of 59


Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I OCFR2.390                                                                        COLR Oyster Creek I Rev. 5 Oyster Creek                                          Non-Proprietary Information            0000-01 08-7976-FBIR-NP Reload 23                                                      Class I                                      Revision 0 UO2 Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B369-16GZ- 100T2-145-T6-3357-LTD (GNF2)
Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I OCFR2.390                                                                        COLR Oyster Creek I Rev. 5 Oyster Creek                                          Non-Proprietary Information            0000-01 08-7976-FBIR-NP Reload 23                                                      Class I                                      Revision 0 UO2 Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B369-16GZ- 100T2-145-T6-3357-LTD (GNF2)
Bundle Number: 3357 Peak Pellet Exposure                  U0 2 LHGR Limit GWd/MT (GWd/ST)                            kW/ft Peak Pellet Exposure            Most Limiting Gadolinia LHGR Limitlo GWd/MT (GWd/ST)                            kW/ft 10 Bounding gadohina LHGR limit for all gadolinium concentrations occurring in this bundle design [[
Bundle Number: 3357 Peak Pellet Exposure                  U0 2 LHGR Limit GWd/MT (GWd/ST)                            kW/ft Peak Pellet Exposure            Most Limiting Gadolinia LHGR Limitlo GWd/MT (GWd/ST)                            kW/ft 10 Bounding gadohina LHGR limit for all gadolinium concentrations occurring in this bundle design ((
Page 14 COLR Page 42 of 59
Page 14 COLR Page 42 of 59


Line 267: Line 267:
GE 11-P9DUB367-1 lGZ-100T-                        2921 145-T6-2921 (GEl 1)
GE 11-P9DUB367-1 lGZ-100T-                        2921 145-T6-2921 (GEl 1)
GE 11-P9DUB361-14GZ- IOOT-                        2922 145-T6-2922 (GEl 1)
GE 11-P9DUB361-14GZ- IOOT-                        2922 145-T6-2922 (GEl 1)
GE 11-P9DUB 366-12GZ-l00T-                        3106 145-T6-3106 (GEL 1) 14 Maximum        lattice k. for the most reactive uncontrolled state plus a [[     ]] adder for uncertainties.
GE 11-P9DUB 366-12GZ-l00T-                        3106 145-T6-3106 (GEL 1) 14 Maximum        lattice k. for the most reactive uncontrolled state plus a ((     )) adder for uncertainties.
Page 18 COLR Page 46 of 59
Page 18 COLR Page 46 of 59



Latest revision as of 08:45, 21 March 2020

Core Operating Limits Report for Reload 22, Cycle 23, Revision 5
ML103350128
Person / Time
Site: Oyster Creek
Issue date: 11/16/2010
From:
Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
Download: ML103350128 (60)


Text

ATTACHMENT 2 Core Operating Limits Report for Reload 22, Cycle 23, Revision 5 Non-Proprietary Version

t@I~

Extlon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oy.ter Creek N*orM'itepeimr Infah1mume Siibmed %a~t Acuafliuce with I OtUR396 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek (This revision is a major rewrite; B2 annotalions are used.)

Prepared: V/tv. I1, ý201D Date Reviewed:.

Reactor Engineering Date Reviewed:

Englne~oing Safety Analaysis-"-

44 Reviewed:

///v,//,0 Approved:

Date Page 1 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table of Contents

1. List of T a b les ............................................................................................................................................. 3
2. R efe re n c es ................................................................................................................................................ 4
3. Terms and Definitions ............................................................................................................................... 5
4. General Information .................................................................................................................................. 6
5. Average Planar Linear Heat Generation Rate ..................................................................................... 7
6. Minimum Critical Power Ratio ............................................................................................................... 20 6.1. Manual Flow Control MCPR Limits ............................................................................................ 20 6.2 Power Dependent MCPR Limits ................................................................................. 20 6.3. Scram Time ..................................................................................................................................... 20
7. Linear Heat Generation Rate ................................................................................................................. 23
8. Stability Protection Settings ................................................................................................................... 23
9. Modes of Operation ................................................................................................................................ 24
10. Methodology ......................................................................................................................................... 24 Appendix A .......................................................................................................................... 25 Page 2 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 "Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with 10CFR2.390

1. List of Tables Table 5-1 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-1 O0T-1 45-T6-3108 ..................................... 7 Table 5-2 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108 ..................................... 8 Table 5-3 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109 ..................................... 8 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109 ..................................... 9 Table 5-5 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-1 OOT-1 45-T6-3104 ..................................... 9 Table 5-6 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104 ..................................... 10 Table 5-7 MAPLHGR for bundle: GEl a-P9DUB360-1 1GZ-100T-145-T6-3107 ..................................... 10 Table 5-8 MAPLHGR for bundle: GEl 1-P9DUB360-1 1GZ-1 OOT-145-T6-3107 ..................................... 11 Table 5-9 MAPLHGR for bundle: GEl 1-P9DUB365-1OGZ-1OOT-145-T6-3105 ..................................... 11 Table 5-10 MAPLHGR for bundle: GEl 1-P9DUB365-1OGZ-100T-145-T6-3105 ................................... 12 Table 5-11 MAPLHGR for bundle: GNF2-PlODG2B370-15GZ-10OT2-145-T6-3355 ............................ 12 Table 5-12 MAPLHGR for bundle: GEl 1-P9HUB363-12GZ-100T-145-T6-2817 ................................... 13 Table 5-13 MAPLHGR for bundle: GEl 1-P9HUB363-12GZ-10OT-145-T6-2817 ................................... 13 Table 5-14 MAPLHGR for bundle: GEl 1-P9HUB364-14GZ-100T-145-T6-2818 ................................... 14 Table 5-15 MAPLHGR for bundle: GEl 1-P9HUB364-14GZ-100T-145-T6-2818 ................................... 14 Table 5-16 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356 ............................ 15 Table 5-17 MAPLHGR for bundle: GNF2-P1 0DG2B369-16GZ-1 00T2-145-T6-3357-LTD ................... 15 Table 5-18 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921 .................................. 16 Table 5-19 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921 ................................... 16 Table 5-20 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922 ................................... 17 Table 5-21 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-10OT-145-T6-2922 ................................... 17 Table 5-22 MAPLHGR for bundle: GEl 1-P9DUB366-12GZ-1 00T-145-T6-3106 ............................... ....... 18 Table 5-23 MAPLHGR for bundle: GEl 1-P9DUB366-12GZ-100T-145-T6-3106 ................................... 18 Table 5-24 MAPLHGR Multiplier with One ISOLATED Loop ................................................................ 19 T able 6-1 MC PR Lim it - G E l 1 .................................................................................................................... 21 Table 6-2 MC P R Lim it - G NF2 .................................................................................................................. 21 Table 6-3 Kf Multiplier - G El 1 and G NF2 .............................................................................................. 22 Table 6-4 Power Dependent MCPRp Limits and Multipliers - GEl 1 and GNF2 .................................. 22 Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS ................................................. 23 Table 8-1 O ption II Stability Protection Settings ..................................................................................... 23 Table 9-1 Modes of O peration .................................................................................................................... 24 Page 3 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390

2. References
1. Deleted.
2. GNF Document, 0000-0108-7976-SRLR, Revision 1, "Supplemental Reload Licensing Report for Oyster Creek Reload 23 Cycle 23," November 2010.
3. GNF Document, 0000-0108-7978-FBIR, Revision 0, "Fuel Bundle Information Report for Oyster Creek Reload 23 Cycle 23," October 2010.
4. Deleted.
5. Deleted.
6. GENE Letter, NSA02-247, "Oyster Creek APRM Flow-Biased Setpoint Margin Between Scram and Rod Block for Stability Option II Adjustment," January 2002.
7. Deleted.
8. Deleted.
9. Deleted.
10. EXELON GENERATION COMPANY, LLC OYSTER CREEK GENERATING STATION DOCKET NO. 50-219, Renewed License No. DPR-16
11. Deleted.
12. Deleted.
13. GNF Document, NEDE-2401 1-P-A-17 and Supplement NEDE-2401 1-P-A-17-US, "General Electric Standard Application for Reactor Fuel," September 2010 (GESTAR II).

Page 4 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with 10CFR2.390

3. Terms and Definitions APLHGR Average Planar Linear Heat Generation Rate ARTS APRM, Rod Block Monitor, and Technical Specification (Improvement)

APRM Average Power Range Monitor BOC Beginning of Cycle BWROG Boiling Water Reactor Owner's Group Coastdown Coastdown occurs when full power is not achievable with all rods out, maximum allowable core flow and feedwater temperature reduction, and equilibrium xenon ELLLA Extended Load Line Limit Analysis EOC End of Cycle EOR End of Rated Conditions (i.e., cycle exposure at 100% power, 100% flow, all-rods-out, all feedwater heaters in service and equilibrium xenon)

GNF Global Nuclear Fuel ICF Increased Core Flow ISOLATED The recirculation loop suction, discharge and discharge bypass valves are in the closed position Kf MCPR flow dependent multiplier (i.e., adjustment to the MCPR limit when at core flow less than rated)

Kp MCPR power dependent multiplier (i.e., adjustment to the MCPR limit when at core power less than rated)

LHGR Linear Heat Generation Rate LHGRFACp LHGR power dependent multiplier (i.e., adjustment to the LHGR limit when at core power less than rated)

LPRM Local Power Range Monitor MAPLHGR Maximum Average Planar Linear Heat Generation Rate MCPR Minimum Critical Power Ratio MCPRp Off-rated power dependent Operating Limit MCPR OOS Out of Service Option A Option A refers to the Technical Specifications core average scram time speed that when applied results in a more restrictive MCPR limit Option B Option B refers to a specific core average scram time speed that when met allows the use of a lower MCPR limit PROOS Pressure Regulator Out of Service TIP Traversing In Core Probe Page 5 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390

4. General Information Oyster Creek is a non-ARTS plant. There are Oyster Creek specific flow-biased and power-biased MCPR operating limits for operation at less than rated flow and power. The flow-biased MCPR limits are discussed in Section 6.1. The power-biased MCPR limits are discussed in Section 6.2. There are power-biased LHGR limits for PROOS operating condition provided in Section 7. Rated core flow is 61 Mlb/hr and operation up to 110.7% of rated is licensed for this cycle. Additionally, Oyster Creek utilizes an ELLLA operating domain, which has expanded the power/flow map to allow for greater operational flexibility.

Page 6 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390

5. Average Planar Linear Heat Generation Rate The MAPLHGR limits are discussed in Technical Specifications Section 3.1O.A. The MAPLHGR limits for the lattices in each fuel type as a function of average planar exposure are given in Tables 5-1 through 5-23 for operation with zero ISOLATED RECIRCULATION LOOPS (Reference 2 and Reference 3). For operation with one ISOLATED RECIRCULATION LOOP, multiply the limits in Tables 5-1 through 5-23 by the ISOLATED Loop multiplier listed in Table 5-24 (Reference 2). All lattices are defined in Reference 3.

Table 5-1 MAPLHGR for bundle: GEI I-P9DUB359-14GZ-1OOT-145-T6-3108 GNF Lattice #8527, #8528, #8508, #8525 Avg. Planar Exposure MAPLHGR (GWdlST) (kW/ft) 0.0 9.84 0.2 9.84 1.0 9.77 5.0 9.59 10.0 9.37 15.0 9.12 20.0 9.14 25.0 8.70 35.0 7.94 45.0 7.75 55.0 7.79 65.0 7.75 Page 7 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-2 MAPLHGR for bundle: GE1I-P9DUB359-14GZ-1OOT-145-T6-3108 GNF Lattices #8507, #8526 Avg. Planar Exposure MAPLHGR (GWdIST) (kWlft) 0.0 9.82 0.2 9.82 1.0 9.76 5.0 9.64 10.0 9.36 15.0 9.06 20.0 9.12 25.0 8.70 35.0 7.92 45.0 7.75 55.0 7.79 65.0 7.72 Table 5-3 MAPLHGR for bundle: GE I1-P9DUB356-14GZ-1OOT-145-T6-3109 GNF Lattices #8530, #8531, #8508, #8525 Avg. Planar Exposure MAPLHGR (GWdIST) (kW/ft) 0.0 9.75 0.2 9.75 1.0 9.70 5.0 9.53 10.0 9.23 15.0 9.18 20.0 9.09 25.0 8.69 35.0 7.94 45.0 7.66 55.0 7.79 65.0 7.71 Page 8 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-4 MAPLHGR for bundle: GEl I -P9DUB356-14GZ-1 00T-1 45-T6-3109 GNF Lattices #8507, #8529 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.77 0.2 9.77 1.0 9.76 5.0 9.60 10.0 9.41 15.0 9.11 20.0 9.08 25.0 8.68 35.0 7.94 45.0 7.69 55.0 7.80 65.0 7.77 Table 5-5 MAPLHGR for bundle: GE I1-P9DUB367-12GZ-1OOT-145-T6-3104 GNF Lattices #8510, #8511, #8508, #8512 Avg. Planar Exposure MAPLHGR (GWd/ST) (kWlft) 0.0 9.75 0.2 9.75 1.0 9.71 5.0 9.51 10.0 9.29 15.0 9.12 20.0 9.20 25.0 8.86 35.0 7.96 45.0 7.79 55.0 7.84 65.0 7.78 Page 9 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-6 MAPLHGR for bundle: GEl I -P9DUB367-12GZ-1 00T-I 45-T6-3104 GNF Lattices #8507, #8509 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.78 0.2 9.78 1.0 9.75 5.0 9.48 10.0 9.27 15.0 9.17 20.0 9.15 25.0 8.85 35.0 7,98 45.0 7.79 55.0 7.80 65.0 7.77 Table 5-7 MAPLHGR for bundle: GE1I-P9DUB360-11GZ-10OT-145-T6-3107 GNF Lattices #8522, #8523, #8508, #8524 Avg. Planar Exposure MAPLHGR.

(GWdlST) (kW/ft) 0.0 9.33 0.2 9.33 1.0 9.29 5.0 9.32 10.0 9.23 15.0 9.12 20.0 9.16 25.0 8.80 35.0 7.94 45.0 7.72 55.0 7.78 65., 7.69 a.ge 10 of 59

Exelon Nuclear- Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-8 MAPLHGR for bundle: GEI I-P9DUB360-11GZ-100T-145-T6-3107 GNF Lattices #8507, #8521 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.47 0.2 9.47 1.0 9.45 5.0 9.41 10.0 9.28 15.0 9.15 20.0 9.16 25.0 8.76 350 7.97

  • 45.0 7.71 55-0 7.78 65.0 7.71 Table 5-9 MAPLHGR forebundt: GE1I-P9DUB365-10GZ-1OOT-145-T6-3105 GNF Lattics#8514, #8515, #8508, #8516 Avmý.banar

..Ejqpmre MAPLHGR IM&(ST) (kW/ft)

'V"A_,. _ 9.72 9.72

  • 1L* 9.70 2 9.55 1,02 9.33 "Mill,. 9.21 M12____, _ 9.15 I__ 8.83

~ 7.98 i 5 ,* 7.79 7.82

.. .. 7.78 Page 11 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I0CFR2.390 Table 5-10 MAPLHGR for bundle: GEl I -P9DUB365-1 OGZ-1 OOT-1 45-T6-3105 GNF Lattices #8507, #8513 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.71 0.2 9.71 1.0 9.69 5.0 9.52 10.0 9.35 15.0 9.13 20.0 9.16 25.0 8.83 35.0 7.96 45.0 7.77 55.0 7.83 65.0 7.76 Table 5-11 MAPLHGR for bundle: GNF2-PIODG2B370-15GZ-100T2-145-T6-3355 All Lattices Avg. Planar Exposure MAPLHGR (GWdIST) (kW/ft) 0.0 7.97 0.2 7.97 1.0 7.97 5.0 7.92 10.0 7.87 15.0 7.75 20.0 7.85 25.0 7.02 35.0 6.38 45.0 6.23 55.0 6.10 65.0 5.97 Page 12 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-12 MAPLHGR for bundle: GE1 I -P9HUB363-12GZ-1 OOT-1 45-T6-2817 GNF Lattices #6784, #6786, #6782, #6787 Avg. Planar Exposure MAPLHGR (GWd/ST) (kWIft) 0.0 10.04 0.2 10.04 1.0 10.10 5.0 9.94 10.0 9.73 15.0 9.43 20.0 9.08 25.0 8.49 35.0 8.35 45.0 8.33 55.0 8.29 65.0 8.58 Table 5-13 MAPLHGR for bundle: GElI -P9HUBUB363-12GZ-1OOT-145-T6-2817 GNF Lattices #6783, #6785 Avg. Planar Exposure MAPLHGR (GWdlST) (kW/ft) 0.0 9.98 0.2 9.98 1.0 10.11 5.0 10.00 10.0 9.79 15.0 9.69 20.0 9.07 25.0 8.49 35.0 8.34 45.0 8.33 55.0 8.51 65.0 8.58 Page 13 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-14 MAPLHGR for bundle: GEl 1 -P9HUB364-14GZ-1 0OT-1 45-T6-2818 GNF Lattices #6789, #6791, #6782, #6792 Avg. Planar Exposure MAPLHGR (GWdIST) (kW/ft) 0.0 9.93 0.2 9.93 1.0 9.91 5.0 9.85 10.0 9.62 15.0 9.61 20.0 9.04 25.0 8.46 35.0 8.30 45.0 8.28 55.0 8.44 65.0 8.52 Table 5-15 MAPLHGR for bundle: GElI -P9HUB364-14GZ-10OT-145-T6-2818 GNF Lattices #6788, #6790 Avg. Planar Exposure MAPLHGR (GWdIST) (kW/ft) 0.0 9.96 0.2 9.96 1.0 9.97 5.0 9.85 10.0 9.73 15.0 9.57 20.0 9.03 25.0 8.47 35.0 8.30 45.0 8.26 55.0 8.43 65.0 8.50 Page 14 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-16 MAPLHGR for bundle: GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 All Lattices Avg. Planar Exposure MAPLHGR (GWdlST) (kWIft) 0.0 7.99 0.2 7.99 1.0 8.03 5.0 7.94 10.0 7.86 15.0 7.81 20.0 7.89 25.0 6.96 35.0 6.37 45.0 6.23 55.0 6.10 65.0 5.97 Table 5-17 MAPLHGR for bundle: GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST) (kWlft) 0.0 8.03 0.2 8.03 1.0 8.08 5.0 7.96 10.0 7.91 15.0 7.83 20.0 7.89 25.0 6.96 35.0 6.37 45.0 6.23 55.0 6.10 65.0 5.97 Page 15 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I0CFR2.390 Table 5-18 MAPLHGR for bundle: GEl I -P9DUB367-1 I GZ-1 OT-1 45-T6-2921 GNF Lattices #7313, #7314, #7315, #7316 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.03 0.2 9.03 1.0 9.06 5.0 9.08 10.0 9.12 15.0 9.10 20.0 9.03 25.0 8.35 35.0 8.00 45.0 7.96 55.0 8.11 65.0 8.15 Table 5-19 MAPLHGR for bundle: GEl I -P9DUB367-1 I GZ-1 OOT-1 45-T6-2921 GNF Lattices #7311, #7312 Avg. Planar Exposure MAPLHGR (GWdlST) (kW/ft) 0.0 9.36 0.2 9.36 1.0 9.39 5.0 9.25 10.0 9.21 15.0 9.10 20.0 9.02 25.0 8.33 35.0 8.00 45.0 7.95 55.0 8.09 65.0 8.16 Page 16 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-20 MAPLHGR for bundle: GEI1I-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7318, #7319, #7315, #7320 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.59 0.2 9.59 1.0 9.52 5.0 9.42 10.0 9.11 15.0 9.09 20.0 8.94 25.0 8.27 35.0 7.98 45.0 7.93 55.0 8.09 65.0 8.16 Table 5-21 MAPLHGR for bundle: GEl1 -P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7311, #7317 Avg. Planar tExposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.59 0.2 9.59 1.0 9.53 5.0 9.37 10.0 9.11 T5.0 9.07 20.0 8.90 25.0 8.25 35.0 7.99 45.0 7.96 55.0 8.11 65.0 8.16 Page 17 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-22 MAPLHGR for bundle: GEl1 -P9DUB366-12GZ-1OOT-145-T6-3106 GNF Lattices #8518, #8519, #8508, #8520 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.71 0.2 9.71 1.0 9.69 5.0 9.51 10.0 9.27 15.0 9.11 20.0 9.20 25.0 8.86 35.0 7.96 45.0 7.79 55.0 7.81 65.0 7.76 Table 5-23 MAPLHGR for bundle: GE I1-P9DUB366-12GZ-1OOT-145-T6-3106 GNF Lattices #8507, #8517 Avg. Planar Exposure MAPLHGR (GWd/ST) (kW/ft) 0.0 9.72 0.2 9.72 1.n 9.68 5.0 9.54 10.0 9.28 15.0) 9.09 20.0 9.16 25.0 8.82 35.0 7.96 45.) 7.78 55.) 7.80 65.1 7.75

'age 18 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 5-24 MAPLHGR Multiplier with One ISOLATED Loop Fuel Type Isolated Loop Multiplier GEl 1 0.98 GNF2 0.98 Page 19 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390

6. Minimum Critical Power Ratio The MCPR limits are discussed in Technical Specifications Section 3.1O.C. For all conditions, the more limiting of the flow adjusted MCPR and power adjusted MCPR is applied.

6.1. Manual Flow Control MCPR Limits The flow-adjusted MCPR is determined by multiplying the applicable rated condition MCPR limit shown in Tables 6-1 and 6-2 by the applicable MCPR multiplier, Kf, given in Table 6-3. The MCPR values and Kf multipliers are documented in Reference 2. Table 6-1 and 6-2 limits are independent of APRM status changes since Reference 2 analyzes the Rod Withdrawal Error (RWE) as unblocked. The appropriate Kf value may be determined by linear interpolation. Table 6-3 is applicable to GEl 1 and GNF2 fuel types per Reference 2.

6.2. Power Dependent MCPR Limits Introduction of the GNF2 fuel type requires use of power dependent MCPR limits at off-rated conditions. Power dependent limits are required because APRM Trip Setdown may not provide adequate protection for the MCPR Safety Limit. Use of these limits ensures that the MCPR Safety Limit is not violated as a result of any anticipated operational occurrence (AOO). Plant specific power dependent MCPR limits are presented in Table 6-4 and documented in Reference

2. When core thermal power is greater than or equal to 40% of rated, the Kp multiplier from Table 6-4 is applied to the applicable rated condition MCPR limit shown in Tables 6-1 and 6-2.

The appropriate MCPRp or Kp value may be determined by linear interpolation. Below 40% of rated power, the MCPR limits in Table 6-4 are applied directly. Table 6-4 is applicable to both GEl I and GNF2 fuel types per Reference 2.

6.3. Scram Time Core average scram insertion times are determined per Technical Specifications 3.2.B. Based on the results of the scram time surveillance testing and calculation of the core average insertion time, a MCPR limit is chosen from Table 6-1 for GEl 1 fuel and Table 6-2 for GNF2 fuel (Reference 2). If the core average scram insertion time does not meet the Option B criteria, but has met Option A criteria, then the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. The scram time adjustment to MCPR only applies to MCPR limits that are set by pressurization transients (see Note 2 to Table 6-1 for further clarification).

Page 20 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 6-1 MCPR Limit - GE1I Cycle Exposure Appli,,-cabil' Option BOC to < (EOR-2525) > (EOR-2525) MWD/ST to MWDIST EOC Four or Five A 1.43 1.49 Recirculation Loops in Service B 1.432 1.432 Three A 1.45 1.51 Recirculation Loops in Service 3 B 1.452 1.452 Table 6-2 MCPR Limit - GNF2 Cycle Exposure Appli,,,,"cabi Option BOC to < (EOR-2525) > (EOR-2525) MWD/ST to A MWD/ST EOC Four or Five A 1.53 1.61 Recirculation Loops in Service B 1.43 1.51 Three A 1.55 1.63 Recirculation Loops in Service 3 B 1.45 1.53 MCPR limits are applicable to rated power operation for Equipment in Service and PROOS conditions per Reference 2.

2 The documented MCPR limit is based on the Rod Withdrawal Error (RWE) event, which is a non-pressurization event. The limiting pressurization event results in Option B MCPR limits that are 0.11 less (BOC to (EOR-2525)

MWD/ST) and 0.05 less ((EOR-2525) MWD/ST to EOC) than the stated value per Reference 2. Scram time adjustments are only required to be applied to MCPR limits that are set by pressurization transients.

3 For three recirculation loops in service, the MCPR operating limit is 0.02 greater than the four/five loop value per Reference 2.

Page 21 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 Table 6-3 Kf Multiplier - GEl1I and GNF2 1 Flow Kf

(% rated) 117.0 1.00 100.0 1.00 90.0 1.00 80.0 1.05 70.0 1.09 60.0 1.13 50.0 1.17 40.0 1.22 30.0 1.28 Table 6-4 Power Dependent MCPRp Limits and Multipliers - GEl1 and GNF2 Core Thermal Power (% of rated)

Applicability (o of ratedl 0 25 <40 >40 60 170 179 190 1 100 Operating Limit MCP Operating Limit MCPR Multiplier, Kp Four or Five < 60 2.52 2.52 2.20 Recirculation -1.185 1.185 1.185 - 1.068 1.000 LoopsincSvice > 60 2.66 Loops in Service 2.66 2.29 Three Recirculation < 60 2.54

-1.185 2.54 2.22 1.185 1.185 - 1.068 1.000 Loops in Service > 60 2.68 2.68 2.31 PROOS - Four or Five < 60 2.52 2.52 2.20 Recirculation 1.517 1.375 1.345 1.265 1.068 1.000 Loops in Service > 60 2.66 2.66 2.29 PROOS - Three < 60 2.54 2.54 2.22 Recirculation 1.517 1.375 1.345 1.265 1.068 1.000 Loops in Service > 60 2.68 2.68 2.31 Kf multipliers are applicable for Equipment in Service and PROOS conditions per Reference 2.

Page 22 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390

7. Linear Heat Generation Rate The LHGR limits are discussed in Technical Specifications Section 3.10.B. The maximum LHGR shall not exceed the LHGR limits as specified in Reference 3, attached as Appendix A. The exposure dependent U0 2 and Gd 20 3 Thermal-Mechanical LHGR limits are contained in Appendix A. Power dependent LHGR multipliers are listed in Table 7-1 for PROOS operating conditions and are applicable to GEl 1 and GNF2 fuel types (Reference 2). The appropriate LHGRFACp value may be determined by linear interpolation.

Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS Power LHGRFAC

(% rated) p 40.0 0.702 50.0 0.760 60.0 0.808 70.0 0.891 79.0 0.905 90.0 1.000 100.0 1.000

8. Stability Protection Settings The stability protection settings are discussed in Technical Specifications 2.3. Oyster Creek utilizes the BWROG Option II solution in the licensing stability calculations. Table 8-1 provides the analytical limit equations for APRM based stability protection settings and related Control Rod Block settings to support Option II implementation (References 2 and 6).

Table 8-1 Option II Stability Protection Settings Technical Specification 2.3.A.1 Neutron Flux, Scram - APRM For W:<27.5 x 106 lb / hr:

S < (1.433 x 10-6) W + 24.8 where:

S = setting in percent of rated power W = recirculation flow (lb/hr)

Technical Specification 2.3.B Neutron Flux, Control Rod Block For W: _27.5 x 106 lb / hr:

S < (1.433 x 10 6) W + 17.5 where:

S = setting in percent of rated power W = recirculation flow (lb/hr)

Page 23 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek I Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390

9. Modes of Operation The allowed Modes of Operation are as described in Table 9-1.

Table 9-1 Modes of Operation Operating Region Options"' Standard ELLLA ICFV Five-loop Operation, Option A or B Yes Yes Yes Four-loop Operation, Option A or B Yes Yes Yes Three-loop Operation, Option A or B Yes Yes Yes PROOS, Five-loop Operation, Option A or B Yes Yes Yes PROOS, Four-loop Operation, Option A or B Yes Yes Yes PROOS, Three-loop Operation, Option A or B Yes Yes Yes

'Each operational mode may be combined with up to a 100IF reduction in feedwater temperature (Final Feedwater Temperature Reduction or Feedwater Heaters OOS) at any point in the cycle (Reference 2).

2 Operation up to 67.5 Mlb/hr core flow is licensed for this cycle (Reference 2).

3 Each operational mode may be coincident with coastdown operation. The minimum coastdown power level is 40% per GESTAR II (Reference 13).

10. Methodology
1. GNF Document, NEDC-31462P and NEDE-31462, "Oyster Creek NGS SAFE RCORECOOLIGESTR-LOCA Loss-of-Coolant Accident Analysis," August 1987.
2. GNF Document, NEDE-2401 1-P-A-17 and Supplement NEDE-2401 1-P-A-17-US, "General Electric Standard Application for Reactor Fuel," September 2010.
3. GNF Document, NEDC-33065P, Rev. 0, "Application of Stability Long-Term Solution Option II to Oyster Creek," April 2002.

Page 24 of 59

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 5 Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I0CFR2.390 Appendix A Page 25 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I0CFR2.390 COLR Oyster Creek I Rev. 5 Global Nuclear Fuel - Americas LLC AFFIDAVIT 1, Anthony P. Reese, state as follows:

(1) 1 am the Manager, Reload Design & Analysis, of Global Nuclear Fuel . Americas, LLC (GNF-A), and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.

(2) The information sought to be withheld is contained in the GNF-A proprietary report, 0000-0108-7976-FBIR-P, Fuel Bundle Information Report for Oyster Creek Reload 23 Cycle 23, Revision 0, Class III (GNF-A Proprietary Information), dated October 2010. GNF-A proprietary information in 0000-0108-7976-FBIR-P is identified by a dark red dotted underline inside double square brackets. ((his..s1e.ntence.is..anexae... e..31)) Figures and large equation objects containing GNF-A proprietary information are identified with double square brackets before and after the object. In each case, the superscript notation -refers to Paragraph (3) of this affidavit that provides the basis for the proprietary determination.

(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act (FOIA), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4)1 and 2.390(a)(4) for trade secrets (Exemption 4). The material for which exemption from disclosure is here sought also qualifies under the narrower definition of trade secret, within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission, 975 F2d 871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA 704 F2d 1280 (DC Cir. 1983).

(4) The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. Some examples of categories of information that fit into the definition of proprietary information are:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over GNF-A and/or other companies.
b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
c. Information that reveals aspects of past, present, or future GNF-A customer-funded development plans and programs, that may include potential products of GNF-A.

0000-01 08-7976-FBIR-P Affidavit Page I of 3 COLR Page 26 of 59

Exelon Nuclear -Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5

d. Information that discloses trade secret and/or potentially patentable subject matter for which it may be desirable to obtain patent protection.

(5) To address 10 CFR 2.390(b)(4), the information sought to be withheld is being submitted to the NRC in confidence. The information is of a sort customarily held in confidence by GNF-A, and is in fact so held. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GNF-A, not been disclosed publicly, and not been made available in public sources. All disclosures to third parties, including any required transmittals to the NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary and/or confidentiality agreements that provide for maintaining the information in confidence. The initial designation of this information as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure are as set forth in the following paragraphs (6) and (7).

(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, who is the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, or who is the person most likely to be subject to the terms under which it was licensed to GNF-A. Access to such documents within GNF-A is limited to a "need to know" basis.

(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist, or other equivalent authority for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GNF-A are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary and/or confidentiality agreements.

(8) The information identified in paragraph (2) above is classified as proprietary because it contains details of GNF-A's fuel design and licensing methodology for the Boiling Water Reactor (BWR). Development of these methods, techniques, and information and their application for the design, modification, and analyses methodologies and processes was achieved at a significant cost to GNF-A. The development of the evaluation process along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GNF-A asset.

(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GNF-A's competitive position and foreclose or reduce the availability of profit-making opportunities. The fuel design and licensing methodology is part of GNF-A's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost. The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.

0000-0108-7976-FBIR-P Affidavit Page 2 of 3 COLR Page 27 of 59

Exelon Nuclear -Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 The research, development, engineering, analytical and NRC review costs comprise a substantial investment of time and money by GNF-A. The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial. GNF-A's competitive advantage will be lost if its competitors are able to use the results of the GNF-A experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.

The value of this information to GNF-A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GNF-A of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.

I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.

Executed on this 8th day of October, 2010 PReese Manager, Reload Design & Analysis Global Nuclear Fuel - Americas LLC 0000-0108-7976-FBIR-P Affidavit Page 3 of 3 COLR Page 28 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I OCFR2.390 COLR Oyster Creek I Rev. 5 Global Nuclear Fuel A Joint Venture of GE, Toshiba, & Hitachi 0000-0108-7976-FBIR-NP Revision 0 Class I October 2010 Non-ProprietaryInformation Fuel Bundle Information Report for Oyster Creek Reload 23 Cycle 23 Copyright-21 OiGlobaJNuclear Fuel - Americas, LL C All Rights Reserved

,C1OR Page 29 of 59

Exelon Nuclear -Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 Important Notice Regarding Contents of This Report Please Read Carefully This report was prepared by Global Nuclear Fuel - Americas, LLC (GNF-A) solely for use by Exelon

("Recipient") in support of the operating license for Oyster Creek (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.

The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.

Proprietary Information Notice This is a non-proprietary version of the document 0000-0108-7976-FBIR-P (which has the proprietary information removed). Portions of the document that have been removed are indicated by an open and closed double brackets as shown here(( )).

Page 2 COLR Page 30 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0

1. Introduction and Summary This report, which supplements the Supplemental Reload Licensing Report, contains thermal-mechanical linear heat generation rate (LHGR) limits for the GNF-A fuel designs to be loaded into Oyster Creek for Cycle 23. These LHGR limits are obtained from thermal-mechanical considerations only. Approved GNF-A calculation models documented in Reference 1 were used in performing this analysis.

LHGR limits as a function of exposure for each bundle of the core design are given in Appendix A. The LHGR values provided in Appendix A provide upper and lower exposure dependent LHGR boundaries which envelope the actual gadolinia dependent LHGR limits. The LHGRs reported have been rounded to two places past the decimal.

Appendix B contains a description of the fuel bundles. Table B- 1 contains a summary of bundle-specific information, and the figures provide the enrichment distribution and gadolinium distribution for the fuel bundles included in this appendix. These bundles have been approved for use under the fuel licensing acceptance criteria of Reference 1.

Page 3 COLR Page 31 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0

2. References
1. General Electric StandardApplicationfor Reactor Fuel, NEDE-240 11-P-A-I17, September 2010; and the U.S. Supplement, NEDE-2401 1-P-A-17-US, September 2010.

Page 4 COLR Page 32 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 Appendix A U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 1 -P9DUB359-14GZ-10OT-145-T6-3108 (GEl 1)

Bundle Number: 3108 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit'1 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 5 COLR Page 33 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Noin-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 1 -P9DUB356-14GZ- 1OOT- 145-T6-3109 (GE 11)

Bundle Number: 3109 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 2 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 2 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 6 COLR Page 34 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEL 1-P9DUB367-12GZ-1OOT-145-T6-3104 (GEl 1)

Bundle Number: 3104 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 3 GWd/MT (GWd/ST) kW/ft 0.00_(0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 3 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 7 COLR Page 35 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0 108-7976-FBIR-NP Reload 23 Class I Revision 0 UO2 Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 1-P9DUB360-1 1GZ-100T-145-T6-3107 (GEl 1)

Bundle Number: 3107 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 4 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 4 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 8 COLR Page 36 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 UO21Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11-P9DUB365-1OGZ- 1OOT-145-T6-3105 (GE 11)

Bundle Number: 3105 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 5 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 9 COLR Page 37 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355 (GNF2)

Bundle Number: 3355 Peak Pellet Exposure UO2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 6 GWd/MT (GWd/ST) kW/ft

((__________________

6 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ((

I].

Page 10 COLR Page 38 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with I0CFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 U02 /Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 1 -P9HUB363-12GZ- 100T- 145-T6-2817 (GE 11)

Bundle Number: 2817 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' 7 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 73Bounding gadolinia LHGR limit for all gadolinitim concentrations occurring in this bUndlt- ,ign ( 7.0% Gd).

Page 11 COLR Page 39 of 59

Exelon Nuclear -Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with I OCFR2.390 COLR Oyster Creek 1 Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9HUB364-14GZ- LOOT- 145-T6-2818 (GE 11)

Bundle Number: 2818 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 8 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 8 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 12 COLR Page 40 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P I0DG2B370-16GZ- 100T2-145-T6-3356 (GNF2)

Bundle Number: 3356 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 9 GWd/MT (GWd/ST) kW/ft

((I 9 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (( fl.

Page 13 COLR Page 41 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Creek Non-Proprietary Information Submitted in Accordance with I OCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 UO2 Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B369-16GZ- 100T2-145-T6-3357-LTD (GNF2)

Bundle Number: 3357 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limitlo GWd/MT (GWd/ST) kW/ft 10 Bounding gadohina LHGR limit for all gadolinium concentrations occurring in this bundle design ((

Page 14 COLR Page 42 of 59

Exelon Nuclear- Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with I OCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11-P9DUB367-11 GZ- 1OOT- 145-T6-2921 (GE 11)

Bundle Number: 2921 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00(0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit" GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 15 COLR Page 43 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek, Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 UO21Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 1I-P9DUB361-14GZ-lOOT- 145-T6-2922 (GE 11)

-Bundle Number: 2922 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 12 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 12Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 16 COLR Page 44 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 1 -P9DUB366-12GZ- LOOT- 145-T6-3106 (GE 11)

Bundle Number: 3106 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 13 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 13 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ( 7.0% Gd).

Page 17 COLR Page 45 of 59

Exelon Nuclear -Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with I OCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 Appendix B Fuel Bundle Information Table B-i Bundle Specific Information Bundle Enrichment Weight Weight Max Exposure Fuel Fuel Bundle Nm Enricmn (wtof U02 ofU k. at Max k.

Bundle Number (wt% U-235) (kg) (kg) 20 0 C 14 GWd/MT (GWd/ST)

GEI11-P9DUB359-14GZ-l00T- 3108 145-T6-3108 (GEL 1)

GE 11 -P9DUB3 56-14GZ- LOOT-145-T6-3109 (GE 13)

GEl 1-P9DUB367-12GZ-1OOT- 3104 145-T6-3104 (GEL 1)

GEl 1-P9DUB360-11 GZ- IOOT- 3107 145-T6-3107 (GE 11)

GE II-P9DUB365-1OGZ- IOOT-145-T6-3105 (GE It)

GNF2-P 10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)

GEl l-P9HUB363-l2GZ-l00T-145-T6-2817 (GEl 1)

GEl 1-P9HUB364-l4GZ-l00T-145-T6-2818 (GEl 1) 2818 GNF2-P l0DG2B370-16GZ-100T2-145-T6-3356 (GNF2)

GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD 3357 (GNF2)

GE 11-P9DUB367-1 lGZ-100T- 2921 145-T6-2921 (GEl 1)

GE 11-P9DUB361-14GZ- IOOT- 2922 145-T6-2922 (GEl 1)

GE 11-P9DUB 366-12GZ-l00T- 3106 145-T6-3106 (GEL 1) 14 Maximum lattice k. for the most reactive uncontrolled state plus a (( )) adder for uncertainties.

Page 18 COLR Page 46 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Relnad 23 Class I Revision 0 Figure B-I Enrichment ý ad Gadolinium Distribution for EDB No. 3108 Fuel Bundle GElI-Pt 0UB359-14GZ-100T-145-T6-3108 (GEll)

Page 19 COLR Page 47 of 59

Exelon Nuclear -Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 I[

1]

Figure B-2 Enrichment a,'- Gadolinium Distribution for EDB No. 3109 Fuel Bundle GEll-Pi9:UB356-14GZ-100T-145-T6-3109 (GEli)

.Page 20 C:OLR Page 48 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 11]

Figure B-3 Enrichment and Gadolinium Distribution for EDB No. 3104 Fuel Bundle GEII-P9DUB367-12GZ-100T-145-T6-3104 (GEll)

Page 21 COLR Page 49 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 if Figure B4 Enrichment and Gadolinium Distribution for 'Y '3107 Fuel Bundle GEll-P9DUB360-11GZ-100T-145-T6-2 Page 22 COLR Page 50 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with I OCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 1]

Figure B-5 Enrichment aad Gadolinium Distribution for EDB No. 3105 Fuel Bundle GEl I-P9 DUB365-IOGZ-100T-145-T6-3105 (GE 11)

Page 23 COLR Page 51 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 1]

Figure B-6 Enrichment and Gadolinium Distribution for F ,3355 Fuel Bundle GNF2-P10DG2B370-15GZ-100T2-145-T6-S F2)

Page 24 COLR Page 52 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster I Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek 1 Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 Figure B-7 Enrichment and Gadolinium Distribution for EDB No. 2817 Fuel Bundle GEI1-P9HUB363-12GZ-100T-145-T6-2817 (GEl1)

Page 25 COLR Page 53 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 Figure B-8 Enrichment and Gadolinium Distribution for EDB N 2818 Fuel Bundle GEII-P9HUB364-14GZ-100T-145-T6-2818 (C '

Page 26 COLR Page 54 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 Figure B-9 Enrichment and Gadolinium Distribution for EDB No. 3356 Fuel Bundle GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 (GNF2)

Page 27 COLR Page 55 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 Reload 23 Class I Revision 0 Figure B-10 Enrichment and Gadolinium Distribution for EDB No. 3357 Fuel Bundle GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD (GNF2)

Page 28

)LR Page 56 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision ()

Class I Revision 0 Reload 23 11 Figure B-11 Enrichment and Gadolinium Distribution for EDB 7 ,2921 Fuel Bundle GEl1-P9DUB367-11GZ-100T-145-T6-2921 (G' )

Page 29 COLR Page 57 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-0108-7976-FBIR-NP Reload 23 Class I Revision 0 I

Class 1]

Figure B-12 Enrichment a d Gadolinium Distribution for EDB 1 2922 Fuel Bundle GEI1-Pg 4UB361-14GZ-100T-145-T6-2922 (GfV )

Page 30

'OLR Page 58 of 59

Exelon Nuclear - Nuclear Fuels Cycle 23 Core Operating Limits Report (COLR) - Oyster Non-Proprietary Information Submitted in Accordance with IOCFR2.390 COLR Oyster Creek I Rev. 5 Oyster Creek Non-Proprietary Information 0000-01 08-7976-FBIR-NP Reload 23 Class I Revision 0 1]

Figure B-13 Enrichment and Gadolinium Distribution for E*;LB No. 3106 Fuel Bundle GEI1-P9DUB366-12GZ-IOOT-145-T6-3 l.f A1 1)

Page 31 COLR Page 59 of 59