ML060590235: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML060590235
| number = ML060590235
| issue date = 02/24/2006
| issue date = 02/24/2006
| title = Palisades Fitness for Duty Program Performance Report
| title = Fitness for Duty Program Performance Report
| author name = Harden P A
| author name = Harden P
| author affiliation = Nuclear Management Co, LLC
| author affiliation = Nuclear Management Co, LLC
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:N=> Palisades Nuclear Plant cornmm w wr -/em Operated by Nuclear Management Company, LLC February 24,2006 I0 CFR 26.71 (d) U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness For Dutv Program Performance Re~ort In accordance with I 0 CFR 26.71 (d), Nuclear Management Company, LLC, is providing the Fitness For Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1,2005, through December 31,2005. Endosures I and 2 summarire the test results at the PNP. Summaw of Commitments This letter contains no new commitments and no revisions to existing commitments.
{{#Wiki_filter:cornmmww N
Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2) CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone:
          =r  -/em Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 24,2006                                                                   I 0 CFR 26.71(d)
2f39.764.2000 ENCLOSURE 1 SEMI-MNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness For Dutv Program Performance Re~ort In accordance with I0 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Fitness For Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1,2005, through December 31,2005.
Endosures I and 2 summarire the test results at the PNP.
Summaw of Commitments This letter contains no new commitments and no revisions to existing commitments.
Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)
CC     Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway   Covert, Michigan 49043-9530 Telephone: 2f39.764.2000
 
ENCLOSURE 1 SEMI-MNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  


==SUMMARY==
==SUMMARY==
July 7 though December 31,2005 I MANAGEMENT  
July 7 though December 31,2005 I MANAGEMENT  


==SUMMARY==
==SUMMARY==
A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 234 random tests with the following results: Donor Grow Random Tests Employees I 57 Results Random testing identified no positive druglalcohol results. Contractors Random testing identified no positive drugialcohol results. The percentage of random tests conducted during this period was 54.5%. The positive dnrglalcohol rate for 2005 indicates a stable trend for employees and contractors:
 
Random Tests Ern~lovees CWs B. PRE-ACCESS TEST1 NG Positive Rate Em~lovees CNts Leadina Substance Cocaine THC A total of I 74 pre-access tests were conducted during this reporting period. Two individuals were denied access based on positive (alcohol) test results. Page 1 of 2 ENCLOSURE I SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  
A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 234 random tests with the following results:
Donor Grow                 Random Tests                 Results Employees                       I57            Random testing identified no positive druglalcohol results.
Contractors                                     Random testing identified no positive drugialcohol results.
The percentage of random tests conducted during this period was 54.5%.
The positive dnrglalcohol rate for 2005 indicates a stable trend for employees and contractors:
Random Tests           Positive Rate      Leadina Substance Ern~loveesCWs        Em~loveesCNts          Cocaine THC B. PRE-ACCESS TEST1NG A total of I74 pre-access tests were conducted during this reporting period. Two individuals were denied access based on positive (alcohol) test results.
Page 1 of 2
 
ENCLOSURE I SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE  


==SUMMARY==
==SUMMARY==
July I through December 31,2005 C. FOR CAUSE TESTING One "For Cause" test was required during the reporting period.
 
The test was given because of observed behavior.
July I through December 31,2005 C. FOR CAUSE TESTING One "For Cause" test was required during the reporting period. The test was given because of observed behavior. The results of that test were negative.
The results of that test were negative.
D. FOLLOW-UP TESTING No individuals tested positive during "Follow-Up" testing.
D. FOLLOW-UP TESTING No individuals tested positive during "Follow-U p" testing. E. APPEALS The appeal process was not initiated during this reporting period. 2. REPORTABLE EVENTS UNDER f O CFR 26.73 During this six-month internal, Palisades Nuclear Plant did not encounter any fitness for duty events that required reporting under 10 CFR 26.73. Page 2 of 2 ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUN PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Nuclear Management Company, LLC Company Palisades Nuclear Plant Location Mike Nock Contact Name Cutoffs: ScreenlConfirmation (nglml) : Appendix A to 10 CFR 26 Marijuana Cocaine Amphetamines Phencyclidine December 31,2005 6 Months Ending 269-764-2565 Phone (include Area Code) Opiates I Alcohol (% BAC)* I *Any detectable amount for situations other than random. FOR CAUSE Testing Results Average Number With Unescorted Access Categories Page 1 of 2 Licensee Employees 608 #Tested #Positive 0 ---- 0 0 0 0 0 0 Long-Term Contractor Personnel NIA ?re-Access 30 #Tested - - - - - - - S hort-Term Contractor Personnel 250 Post-Accident Observed Behavior Random Follow-up Other TOTAL #Positive
E. APPEALS The appeal process was not initiated during this reporting period.
------ - - - - - - - #Tested 1 44 0 1 77 4 0 226 0 0 157 14 0 201 #Positive 2 0 0 0 0 0 2 ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Breakdown of Confirmed Positive Tests for Specific Substances Page 2 of 2 Licensee Employees Long-Term Contractors Short-Term Contractors Total 2 Marijuana Cocaine Opiates Amphe tarnines Phency- clidine Alcohol 2 Refusal to Test 4 2 3 4 5}}
: 2. REPORTABLE EVENTS UNDER f O CFR 26.73 During this six-month internal, Palisades Nuclear Plant did not encounter any fitness for duty events that required reporting under 10 CFR 26.73.
Page 2 of 2
 
ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR D U N PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Nuclear Management Company, LLC                                         December 31,2005 Company                                                         6 Months Ending Palisades Nuclear Plant Location Mike Nock                                                           269-764-2565 Contact Name                                                 Phone (include Area Code)
Cutoffs: ScreenlConfirmation(nglml) : Appendix A to 10 CFR 26 Marijuana                     Amphetamines Cocaine                       Phencyclidine Opiates             I         Alcohol (% BAC)*                                           I
  *Any detectable amount for situations other than random.
Long-Term            Short-Term Testing Results                           Licensee          Contractor            Contractor Employees          Personnel              Personnel Average Number With Unescorted Access                             608                 NIA                  250
                                        #Tested    #Positive #Tested   #Positive   #Tested  #Positive Categories
?re-Access
                                        -    30
                                            -     -   0--                 -         144        2 FOR              Post-Accident           0        0      -           -           0        0 CAUSE Observed                0        0      -           -           1        0 Behavior Random                                    157        0      -           -         77        0 Follow-up                                  14        0      -           -           4        0 Other                                        0         0       -          -          0         0 TOTAL                                    201         0      -          -        226        2 Page 1 of 2
 
ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Breakdown of Confirmed Positive Tests for Specific Substances Amphe    Phency-          Refusal Marijuana  Cocaine  Opiates  tarnines  clidine Alcohol to Test 4 2 3 4 5 Licensee Employees Long-Term Contractors Short-Term Contractors                                                   2 Total                                                                     2 Page 2 of 2}}

Latest revision as of 09:33, 14 March 2020

Fitness for Duty Program Performance Report
ML060590235
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/24/2006
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060590235 (5)


Text

cornmmww N

=r -/em Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 24,2006 I 0 CFR 26.71(d)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness For Dutv Program Performance Re~ort In accordance with I0 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Fitness For Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1,2005, through December 31,2005.

Endosures I and 2 summarire the test results at the PNP.

Summaw of Commitments This letter contains no new commitments and no revisions to existing commitments.

Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)

CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 2f39.764.2000

ENCLOSURE 1 SEMI-MNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July 7 though December 31,2005 I MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 234 random tests with the following results:

Donor Grow Random Tests Results Employees I57 Random testing identified no positive druglalcohol results.

Contractors Random testing identified no positive drugialcohol results.

The percentage of random tests conducted during this period was 54.5%.

The positive dnrglalcohol rate for 2005 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leadina Substance Ern~loveesCWs Em~loveesCNts Cocaine THC B. PRE-ACCESS TEST1NG A total of I74 pre-access tests were conducted during this reporting period. Two individuals were denied access based on positive (alcohol) test results.

Page 1 of 2

ENCLOSURE I SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July I through December 31,2005 C. FOR CAUSE TESTING One "For Cause" test was required during the reporting period. The test was given because of observed behavior. The results of that test were negative.

D. FOLLOW-UP TESTING No individuals tested positive during "Follow-Up" testing.

E. APPEALS The appeal process was not initiated during this reporting period.

2. REPORTABLE EVENTS UNDER f O CFR 26.73 During this six-month internal, Palisades Nuclear Plant did not encounter any fitness for duty events that required reporting under 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR D U N PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Nuclear Management Company, LLC December 31,2005 Company 6 Months Ending Palisades Nuclear Plant Location Mike Nock 269-764-2565 Contact Name Phone (include Area Code)

Cutoffs: ScreenlConfirmation(nglml) : Appendix A to 10 CFR 26 Marijuana Amphetamines Cocaine Phencyclidine Opiates I Alcohol (% BAC)* I

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 608 NIA 250

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories

?re-Access

- 30

- - 0-- - 144 2 FOR Post-Accident 0 0 - - 0 0 CAUSE Observed 0 0 - - 1 0 Behavior Random 157 0 - - 77 0 Follow-up 14 0 - - 4 0 Other 0 0 - - 0 0 TOTAL 201 0 - - 226 2 Page 1 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Breakdown of Confirmed Positive Tests for Specific Substances Amphe Phency- Refusal Marijuana Cocaine Opiates tarnines clidine Alcohol to Test 4 2 3 4 5 Licensee Employees Long-Term Contractors Short-Term Contractors 2 Total 2 Page 2 of 2