ML060590235

From kanterella
Jump to navigation Jump to search
Fitness for Duty Program Performance Report
ML060590235
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/24/2006
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060590235 (5)


Text

cornmmww N

=r -/em Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 24,2006 I 0 CFR 26.71(d)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness For Dutv Program Performance Re~ort In accordance with I0 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Fitness For Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1,2005, through December 31,2005.

Endosures I and 2 summarire the test results at the PNP.

Summaw of Commitments This letter contains no new commitments and no revisions to existing commitments.

Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)

CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 2f39.764.2000

ENCLOSURE 1 SEMI-MNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July 7 though December 31,2005 I MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 234 random tests with the following results:

Donor Grow Random Tests Results Employees I57 Random testing identified no positive druglalcohol results.

Contractors Random testing identified no positive drugialcohol results.

The percentage of random tests conducted during this period was 54.5%.

The positive dnrglalcohol rate for 2005 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leadina Substance Ern~loveesCWs Em~loveesCNts Cocaine THC B. PRE-ACCESS TEST1NG A total of I74 pre-access tests were conducted during this reporting period. Two individuals were denied access based on positive (alcohol) test results.

Page 1 of 2

ENCLOSURE I SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July I through December 31,2005 C. FOR CAUSE TESTING One "For Cause" test was required during the reporting period. The test was given because of observed behavior. The results of that test were negative.

D. FOLLOW-UP TESTING No individuals tested positive during "Follow-Up" testing.

E. APPEALS The appeal process was not initiated during this reporting period.

2. REPORTABLE EVENTS UNDER f O CFR 26.73 During this six-month internal, Palisades Nuclear Plant did not encounter any fitness for duty events that required reporting under 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR D U N PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Nuclear Management Company, LLC December 31,2005 Company 6 Months Ending Palisades Nuclear Plant Location Mike Nock 269-764-2565 Contact Name Phone (include Area Code)

Cutoffs: ScreenlConfirmation(nglml) : Appendix A to 10 CFR 26 Marijuana Amphetamines Cocaine Phencyclidine Opiates I Alcohol (% BAC)* I

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 608 NIA 250

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories

?re-Access

- 30

- - 0-- - 144 2 FOR Post-Accident 0 0 - - 0 0 CAUSE Observed 0 0 - - 1 0 Behavior Random 157 0 - - 77 0 Follow-up 14 0 - - 4 0 Other 0 0 - - 0 0 TOTAL 201 0 - - 226 2 Page 1 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,3005 Breakdown of Confirmed Positive Tests for Specific Substances Amphe Phency- Refusal Marijuana Cocaine Opiates tarnines clidine Alcohol to Test 4 2 3 4 5 Licensee Employees Long-Term Contractors Short-Term Contractors 2 Total 2 Page 2 of 2