ML063040037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
Line 49: Line 49:
D. One offsite circuit--  ------------          NOTE -------------
D. One offsite circuit--  ------------          NOTE -------------
inoperable.            Enter applicable Conditions and Required Actions of AND                    LCO 3.8.7, "Distribution Systems-Operating," when One required DG        Condition D.is entered with inoperable.            no AC power source to any division.
inoperable.            Enter applicable Conditions and Required Actions of AND                    LCO 3.8.7, "Distribution Systems-Operating," when One required DG        Condition D.is entered with inoperable.            no AC power source to any division.
                            ---------------------.            -------.
D.1            Restore offsite                  12 hours circuit to OPERABLE status.
D.1            Restore offsite                  12 hours circuit to OPERABLE status.
OR D.2            Restore required DG              12 hours to OPERABLE status.
OR D.2            Restore required DG              12 hours to OPERABLE status.
(continued)
(continued)
Columbia Generating Station            3.8.1-4                        Amendment No.. 4-4-9 169 1}}
Columbia Generating Station            3.8.1-4                        Amendment No.. 4-4-9 169 1}}

Revision as of 23:10, 13 March 2020

Technical Specifications, One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1
ML063040037
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/08/2005
From:
Office of Nuclear Reactor Regulation
To:
Benney B, NRR/DORL, 415-3764
Shared Package
ML063040688 List:
References
Download: ML063040037 (4)


Text

SW System and UHS 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One SW subsystem B.1 ---------NOTES -------

inoperable. 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources-Operating," for diesel generator made inoperable by SW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.9, "Residual Heat Removal (RHR)

Shutdown Cooling System- Hot Shutdown," for RHR shutdown cooling subsystem made inoperable by SW System..

Restore SW subsystem to OPERABLE status.

72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

I (continued)

  • On a one-time basis, during the refurbishment/replacement of the 1B Service Water Pump during Cycle 18, the Completion Time for an inoperable service water subsystem is extended to 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />.

Columbia Generating Station 3.7.1-2 Amendment No. 149,169, 195

SW System and UHS 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Standby Service Water (SW) System and Ultimate Heat Sink (UHS)

LCO 3.7.1 Division 1 and 2 SW subsystems and UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Average sediment depth A.1 Restore average 30 days in one or both spray sediment depth to ponds > 0.5 ft and within limits.

< 1.0 ft.

(continued)

Columbia Generating Station 3.7.1-1 Amendment No. i49 1691

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION TCOMPLETION TIME B. (continued) B.2 Declare required. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of by the inoperable DG, Condition B inoperable when the concurrent with redundant required inoperability feature(s) are of redundant inoperable. required feature(s)

AND B.3 .1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s) are not inoperable due to common cause failure.

OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG(s).

AND

-B.4 Restore required DG to OPERABLE status.

72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

I AND 6 days from discovery of failure to meet LCO (continued)

  • On a one-time basis, during the refurbishment/replacement of the IB Service Water Pump during Cycle 18, the Completion Time for the Division 2 DG is extended to-144 hours.

Columbia Generating Station 3.8.1-3 Amendment No. 149,169,195

AC Sources-Operating 3.8.1 ACTIONS

.CONDITION REQUIRED ACTION .. COMPLETION TIME C. Two offsite circuits C.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable, feature(s) inoperable discovery of when the redundant Condition C required featUre(s) concurrent with are inoperable. inoperability of redundant required feature(s)

AND C.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status.

D. One offsite circuit-- ------------ NOTE -------------

inoperable. Enter applicable Conditions and Required Actions of AND LCO 3.8.7, "Distribution Systems-Operating," when One required DG Condition D.is entered with inoperable. no AC power source to any division.

D.1 Restore offsite 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> circuit to OPERABLE status.

OR D.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.

(continued)

Columbia Generating Station 3.8.1-4 Amendment No.. 4-4-9 169 1