| Line 49: | Line 49: | ||
D. One offsite circuit-- ------------ NOTE ------------- | D. One offsite circuit-- ------------ NOTE ------------- | ||
inoperable. Enter applicable Conditions and Required Actions of AND LCO 3.8.7, "Distribution Systems-Operating," when One required DG Condition D.is entered with inoperable. no AC power source to any division. | inoperable. Enter applicable Conditions and Required Actions of AND LCO 3.8.7, "Distribution Systems-Operating," when One required DG Condition D.is entered with inoperable. no AC power source to any division. | ||
D.1 Restore offsite 12 hours circuit to OPERABLE status. | D.1 Restore offsite 12 hours circuit to OPERABLE status. | ||
OR D.2 Restore required DG 12 hours to OPERABLE status. | OR D.2 Restore required DG 12 hours to OPERABLE status. | ||
(continued) | (continued) | ||
Columbia Generating Station 3.8.1-4 Amendment No.. 4-4-9 169 1}} | Columbia Generating Station 3.8.1-4 Amendment No.. 4-4-9 169 1}} | ||
Revision as of 23:10, 13 March 2020
| ML063040037 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/08/2005 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Benney B, NRR/DORL, 415-3764 | |
| Shared Package | |
| ML063040688 | List: |
| References | |
| Download: ML063040037 (4) | |
Text
SW System and UHS 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One SW subsystem B.1 ---------NOTES -------
inoperable. 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources-Operating," for diesel generator made inoperable by SW System.
- 2. Enter applicable Conditions and Required Actions of LCO 3.4.9, "Residual Heat Removal (RHR)
Shutdown Cooling System- Hot Shutdown," for RHR shutdown cooling subsystem made inoperable by SW System..
Restore SW subsystem to OPERABLE status.
72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*
I (continued)
- On a one-time basis, during the refurbishment/replacement of the 1B Service Water Pump during Cycle 18, the Completion Time for an inoperable service water subsystem is extended to 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />.
Columbia Generating Station 3.7.1-2 Amendment No. 149,169, 195
SW System and UHS 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Standby Service Water (SW) System and Ultimate Heat Sink (UHS)
LCO 3.7.1 Division 1 and 2 SW subsystems and UHS shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Average sediment depth A.1 Restore average 30 days in one or both spray sediment depth to ponds > 0.5 ft and within limits.
< 1.0 ft.
(continued)
Columbia Generating Station 3.7.1-1 Amendment No. i49 1691
AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION TCOMPLETION TIME B. (continued) B.2 Declare required. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of by the inoperable DG, Condition B inoperable when the concurrent with redundant required inoperability feature(s) are of redundant inoperable. required feature(s)
AND B.3 .1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s) are not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG(s).
AND
-B.4 Restore required DG to OPERABLE status.
72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*
I AND 6 days from discovery of failure to meet LCO (continued)
- On a one-time basis, during the refurbishment/replacement of the IB Service Water Pump during Cycle 18, the Completion Time for the Division 2 DG is extended to-144 hours.
Columbia Generating Station 3.8.1-3 Amendment No. 149,169,195
AC Sources-Operating 3.8.1 ACTIONS
.CONDITION REQUIRED ACTION .. COMPLETION TIME C. Two offsite circuits C.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable, feature(s) inoperable discovery of when the redundant Condition C required featUre(s) concurrent with are inoperable. inoperability of redundant required feature(s)
AND C.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status.
D. One offsite circuit-- ------------ NOTE -------------
inoperable. Enter applicable Conditions and Required Actions of AND LCO 3.8.7, "Distribution Systems-Operating," when One required DG Condition D.is entered with inoperable. no AC power source to any division.
D.1 Restore offsite 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> circuit to OPERABLE status.
OR D.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.
(continued)
Columbia Generating Station 3.8.1-4 Amendment No.. 4-4-9 169 1