ML070880029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/03/2007
| issue date = 04/03/2007
| title = Inititial Examination Report, No. 50-128-OL-07-01, Texas a & M University Reactor
| title = Inititial Examination Report, No. 50-128-OL-07-01, Texas a & M University Reactor
| author name = Eads J H
| author name = Eads J
| author affiliation = NRC/NRR/ADRA/DPR/PRTB
| author affiliation = NRC/NRR/ADRA/DPR/PRTB
| addressee name = Maldanado T A
| addressee name = Maldanado T
| addressee affiliation = Texas A&M Univ
| addressee affiliation = Texas A&M Univ
| docket = 05000128
| docket = 05000128
| license number = R-076
| license number = R-076
| contact person = Eads J H, NRR/ADRA/DPR/PRTB, 415-1471
| contact person = Eads J, NRR/ADRA/DPR/PRTB, 415-1471
| case reference number = 50-128/OL-07-01
| case reference number = 50-128/OL-07-01
| document report number = 50-128/OL-07-01
| document report number = 50-128/OL-07-01
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:April 3, 2007Dr. Theresa A. Maldonado, Deputy Director Texas Engineering Experiment Station Texas A&M University 1095 Nuclear Science Center College Station, TX 77843-3575
{{#Wiki_filter:April 3, 2007 Dr. Theresa A. Maldonado, Deputy Director Texas Engineering Experiment Station Texas A&M University 1095 Nuclear Science Center College Station, TX 77843-3575


==SUBJECT:==
==SUBJECT:==
INITIAL EXAMINATION REPORT NO. 50-128/OL-07-01, TEXAS A&MUNIVERSITY
INITIAL EXAMINATION REPORT NO. 50-128/OL-07-01, TEXAS A&M UNIVERSITY


==Dear Dr. Maldonado:==
==Dear Dr. Maldonado:==


During the week of February 26, 2006, the NRC administered an operator licensingexamination at your Texas A&M University reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.
During the week of February 26, 2006, the NRC administered an operator licensing examination at your Texas A&M University reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.
Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination. In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and theenclosures will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contactPatrick Isaac at 301-415-1019.Sincerely,/RA/ Michael J. Case forJohnny Eads, ChiefResearch and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-128
Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Patrick Isaac at 301-415-1019.
Sincerely,
                                                /RA/ Michael J. Case for Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-128


==Enclosures:==
==Enclosures:==
: 1. Initial Examination Report No. 50-128/OL-07-012. Facility comments with NRC resolution  
: 1. Initial Examination Report No. 50-128/OL-07-01
: 3. Examination and answer key (RO/SRO)cc w/enclosures:Please see next page Texas A&M UniversityDocket No. 50-128 cc:
: 2. Facility comments with NRC resolution
Mayor, City of College StationP.O. Box Drawer 9960 College Station, TX 77840-3575Governor's Budget and Planning Office P.O. Box 13561 Austin, TX 78711Texas A&M University SystemATTN: Dr. Warren D. Reece, Director Nuclear Science Center Texas Engineering Experiment Station F. E. Box 89, M/S 3575 College Station, Texas 77843Texas A&M University SystemATTN: Jim Remlinger, Associate Director Nuclear Science Center Texas Engineering Experiment Station F. E. Box 89, M/S 3575 College Station, Texas 77843Radiation Program OfficerBureau of Radiation Control Dept. Of State Health Services Division for Regulatory Services 1100 West 49 th Street, MC 2828Austin, TX 78756-3189Susan M. JablonskiTechnical Advisor Office of Permitting, Remediation & Registration Texas Commission on Environmental Quality P.O. Box 13087, MS 122 Austin, TX 78711-3087 Test, Research and Training Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611 Dr. Theresa A. Maldonado, Deputy DirectorApril 3, 2007Texas Engineering Experiment Station Texas A&M University 1095 Nuclear Science Center College Station, TX 77843-3575
: 3. Examination and answer key (RO/SRO) cc w/enclosures:
Please see next page
 
Texas A&M University                            Docket No. 50-128 cc:
Mayor, City of College Station P.O. Box Drawer 9960 College Station, TX 77840-3575 Governors Budget and Planning Office P.O. Box 13561 Austin, TX 78711 Texas A&M University System ATTN: Dr. Warren D. Reece, Director Nuclear Science Center Texas Engineering Experiment Station F. E. Box 89, M/S 3575 College Station, Texas 77843 Texas A&M University System ATTN: Jim Remlinger, Associate Director Nuclear Science Center Texas Engineering Experiment Station F. E. Box 89, M/S 3575 College Station, Texas 77843 Radiation Program Officer Bureau of Radiation Control Dept. Of State Health Services Division for Regulatory Services 1100 West 49th Street, MC 2828 Austin, TX 78756-3189 Susan M. Jablonski Technical Advisor Office of Permitting, Remediation & Registration Texas Commission on Environmental Quality P.O. Box 13087, MS 122 Austin, TX 78711-3087 Test, Research and Training Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611
 
Dr. Theresa A. Maldonado, Deputy Director                  April 3, 2007 Texas Engineering Experiment Station Texas A&M University 1095 Nuclear Science Center College Station, TX 77843-3575


==SUBJECT:==
==SUBJECT:==
INITIAL EXAMINATION REPORT NO. 50-128/OL-07-01, TEXAS A&MUNIVERSITY
INITIAL EXAMINATION REPORT NO. 50-128/OL-07-01, TEXAS A&M UNIVERSITY


==Dear Dr. Maldonado:==
==Dear Dr. Maldonado:==


During the week of February 26, 2006, the NRC administered an operator licensingexamination at your Texas A&M University reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.
During the week of February 26, 2006, the NRC administered an operator licensing examination at your Texas A&M University reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.
Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination. In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and theenclosures will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contactPatrick Isaac at 301-415-1019.Sincerely,/RA/ Michael J. Case forJohnny Eads, ChiefResearch and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor RegulationDocket No. 50-128
Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Patrick Isaac at 301-415-1019.
Sincerely,
                                        /RA/ Michael J. Case for Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-128


==Enclosures:==
==Enclosures:==
: 1. Initial Examination Report No. 50-128/OL-07-012. Facility comments with NRC resolution  
: 1. Initial Examination Report No. 50-128/OL-07-01
: 3. Examination and answer key (RO/SRO)cc w/enclosures:
: 2. Facility comments with NRC resolution
Please see next pageDISTRIBUTION
: 3. Examination and answer key (RO/SRO) cc w/enclosures:
:PUBLICPRTB r/fJEadsFacility File EBarnhill (O6-F2)ADAMS ACCESSION #: ML070880029TEMPLATE #: NRR-074PACKAGE ACCESSION #: ML063470057OFFICEPRTB:CEIOLB:LAPRTB:BCNAMEPIsaac:cahEBarnhillJEads/MCase for DATE03/29/200704/02/2007004/03/2007OFFICIAL RECORD COPY ENCLOSURE 1U. S. NUCLEAR REGULATORY COMMISSIONOPERATOR LICENSING INITIAL EXAMINATION REPORTREPORT NO.:50-128/OL-07-01FACILITY DOCKET NO.:50-128 FACILITY LICENSE NO.:R-76 FACILITY:Texas A&M University EXAMINATION DATES:02/27/2007 - 03/01/2007 EXAMINER:Patrick Isaac, Chief ExaminerSUBMITTED BY:       /RA/
Please see next page DISTRIBUTION:
03/26/2007 Patrick Isaac, Chief Examiner     Date
PUBLIC                PRTB r/f            JEads          Facility File EBarnhill (O6-F2)
ADAMS ACCESSION #: ML070880029                                                          TEMPLATE #: NRR-074 PACKAGE ACCESSION #: ML063470057 OFFICE                      PRTB:CE                      IOLB:LA                    PRTB:BC NAME                        PIsaac:cah                    EBarnhill              JEads/MCase for DATE                          03/29/2007                  04/02/2007                  004/03/2007 OFFICIAL RECORD COPY
 
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:                 50-128/OL-07-01 FACILITY DOCKET NO.:         50-128 FACILITY LICENSE NO.:       R-76 FACILITY:                   Texas A&M University EXAMINATION DATES:           02/27/2007 - 03/01/2007 EXAMINER:                   Patrick Isaac, Chief Examiner SUBMITTED BY:                     /RA/                               03/26/2007 Patrick Isaac, Chief Examiner               Date


==SUMMARY==
==SUMMARY==
:During the week of February 26, 2007, NRC administered Operator Licensing examinations toone Reactor Operator (RO) and two Senior Operator Upgrade (SROU) applicants. All the applicants passed the examinations. REPORT DETAILS1.Examiner:  Patrick Isaac, Chief Examiner2.Results:RO PASS/FAILSRO PASS/FAILTOTAL PASS/FAILWritten1/0N/A1/0 Operating Tests1/02/03/0 Overall1/02/03/03.Exit Meeting:Personnel attending:        John Hernandez, Reactor Supervisor        Patrick Isaac, NRCThe licensee commented on a fair and well balanced examination. There were nogeneric concerns raised by the examiner.
During the week of February 26, 2007, NRC administered Operator Licensing examinations to one Reactor Operator (RO) and two Senior Operator Upgrade (SROU) applicants. All the applicants passed the examinations.
ENCLOSURE 2 NRC RESOLUTIONS - WRITTEN EXAMINATIONFacility Comment B.8
ENCLOSURE 1
:... the answer to question B.8 is incorrect.
The examination key states that the correct answer is "c". The reference to the answer is SOPII, Reactor Operations, C.1. The SOP goes on to state that the Director may make changes tothe minimum staff requirements provided the changes satisfy the requirements of the Technical Specifications.On April 24, 2003, the Director initiated such a change allowing the requirement for the Duty HPto be waived provided that other conditions are met. This change is currently in effect and is practiced daily at the TAMU Nuclear Science Center. Therefore, answer " c" is no longer valid for the NSC. Answer b is correct. The reference for this answer is Technical Specification 4.3.2.a.
NRC Resolution B.8:Comment accepted. The answer key will be modified to accept option "b" as correct.
ENCLOSURE 3
 
U. S. NUCLEAR REGULATORY COMMISSIONNON-POWER REACTOR INITIAL LICENSE EXAMINATION
 
FACILITY:          TEXAS A&M
 
REACTOR TYPE:      TRIGA
 
DATE ADMINISTERED:  2/27/2007
 
CANDIDATE:                                                                     
 
INSTRUCTIONS TO CANDIDATE:Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in paren-theses for each question. A 70%overall is required to pass the examination. Examinations will be picked up three (3) hours after theexamination starts.
 
                                        % OFCATEGORY  % OF  CANDIDATE'S      CATEGORY VALUE  TOTAL    SCORE            VALUE              CATEGORY             
 
20.00  33.3                                        A. REACTOR THEORY, THERMODYNAMICSAND FACILITY OPERATING CHARACTERISTICS


20.00  33.3  
REPORT DETAILS
: 1. Examiner:
Patrick Isaac, Chief Examiner
: 2. Results:
RO PASS/FAIL      SRO PASS/FAIL      TOTAL PASS/FAIL Written                      1/0                N/A                  1/0 Operating Tests              1/0                2/0                  3/0 Overall                      1/0                2/0                  3/0
: 3. Exit Meeting:
Personnel attending:
John Hernandez, Reactor Supervisor Patrick Isaac, NRC The licensee commented on a fair and well balanced examination. There were no generic concerns raised by the examiner.


B.NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00  33.3                                        C.PLANT AND RADIATION MONITORINGSYSTEMS FINAL GRADE                                                % TOTALSALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NORRECEIVED AID.                                                               CANDIDATE'S SIGNATURE Section A:
NRC RESOLUTIONS - WRITTEN EXAMINATION Facility Comment B.8:
L Theory, Thermodynamics & Facility Operating Characteristics                                Page 2
... the answer to question B.8 is incorrect.
The examination key states that the correct answer is c. The reference to the answer is SOP II, Reactor Operations, C.1. The SOP goes on to state that the Director may make changes to the minimum staff requirements provided the changes satisfy the requirements of the Technical Specifications.
On April 24, 2003, the Director initiated such a change allowing the requirement for the Duty HP to be waived provided that other conditions are met. This change is currently in effect and is practiced daily at the TAMU Nuclear Science Center. Therefore, answer c is no longer valid for the NSC.
Answer b is correct. The reference for this answer is Technical Specification 4.3.2.a.
NRC Resolution B.8:
Comment accepted. The answer key will be modified to accept option "b" as correct.
ENCLOSURE 2


A N S W E R   S H E E T
U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR INITIAL LICENSE EXAMINATION FACILITY:                  TEXAS A&M REACTOR TYPE:              TRIGA DATE ADMINISTERED:          2/27/2007 CANDIDATE:
INSTRUCTIONS TO CANDIDATE:
Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in paren-theses for each question. A 70%
overall is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
                                            % OF CATEGORY      % OF          CANDIDATE'CATEGORY VALUE      TOTAL          SCORE          VALUE                  CATEGORY 20.00        33.3                                  A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS 20.00        33.3                                  B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00        33.3                                  C. PLANT AND RADIATION MONITORING SYSTEMS FINAL GRADE
                                            % TOTALS ALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NOR RECEIVED AID.
CANDIDATE'S SIGNATURE ENCLOSURE 3


Multiple Choice   (Circle or X your choice)
Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 2 ANSWER SHEET Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
If you change your answer, write your selection in the blank.
MULTIPLE CHOICE 001 a b c d 002 a b c d 003 a b c d 004 a b c d 005 a b c d 006 a b c d 007 a b c d 008 a b c d 009 a b c d 010 a b c d 011 a b c d 012 a b c d 013 a b c d 014 a b c d 015 a b c d 016 a b c d 017 a b c d 018 a b c d 019 a b c d 020 a b c d
(***** END OF CATEGORY A *****)


MULTIPLE CHOICE
Section B Normal, Emergency and Radiological Control Procedures Page 3 ANSWER SHEET Multiple Choice (Circle or X your choice)
 
001  a  b  c  d       
 
002  a  b  c  d       
 
003  a  b  c  d       
 
004  a  b  c  d       
 
005  a  b  c  d       
 
006  a  b  c  d       
 
007  a  b  c  d       
 
008  a  b  c  d       
 
009  a  b  c  d       
 
010  a  b  c  d       
 
011  a  b  c  d       
 
012  a  b  c  d       
 
013  a  b  c  d       
 
014  a  b  c  d       
 
015  a  b  c  d       
 
016  a  b  c  d       
 
017  a  b  c  d       
 
018  a  b  c  d       
 
019  a  b  c  d       
 
020  a  b  c  d       
(***** END OF CATEGORY  A *****)
Section B Normal, Emergency and Radiological Control Procedures                               Page 3
 
A N S W E R  S H E E T
 
Multiple Choice   (Circle or X your choice)
If you change your answer, write your selection in the blank.
If you change your answer, write your selection in the blank.
MULTIPLE CHOICE 001 a b c d 002 a b c d 003 a      b      c    d 004 a b c d 005 a b c d 006 a b c d 007 a b c d 008 a b c d 009 a b c d 010 a b c d 011 a b c d 012 a b c d 013 a b c d 014 a b c d 015 a b c d 016 a b c d 017 a b c d 018 a b c d 019 a b c d
(***** END OF CATEGORY B *****)


MULTIPLE CHOICE
Section C Facility and Radiation Monitoring Systems                     Page 4 ANSWER SHEET Multiple Choice (Circle or X your choice)
 
001  a  b  c  d     
 
002  a  b  c  d     
 
003  a        b c        d     
 
004  a  b  c  d     
 
005  a  b  c  d     
 
006  a  b  c  d     
 
007  a  b  c  d     
 
008  a  b  c  d     
 
009  a  b  c  d     
 
010  a  b  c  d     
 
011  a  b  c  d     
 
012  a  b  c  d     
 
013  a  b  c  d     
 
014  a  b  c  d     
 
015  a  b  c  d     
 
016  a  b  c  d     
 
017  a  b  c  d     
 
018  a  b  c  d        019  a  b  c  d     
  (***** END OF CATEGORY  B *****)
Section C Facility and Radiation Monitoring Systems                                 Page 4
 
A N S W E R  S H E E T
 
Multiple Choice   (Circle or X your choice)
If you change your answer, write your selection in the blank.
If you change your answer, write your selection in the blank.
MULTIPLE CHOICE 001 a b c d 002 a b c d 003 a b c d 004 a b c d 005 a b c d 006 a b c d 007 a b c d 008 a b c d 009 a b c d 010 a b c d 011 a b c d 012 a b c d 013 a b c d 014 a      b        c    d 015 a b c d 016 a b c d 017 a b c d 018 a b c d 019 a b c d
(********** END OF EXAMINATION **********)


MULTIPLE CHOICE
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
 
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
001  a  b  c  d     
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.
 
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
002  a   b  c  d     
: 4. Use black ink or dark pencil only to facilitate legible reproductions.
 
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet.
003  a  b  c  d     
: 6. Fill in the date on the cover sheet of the examination (if necessary).
 
: 7. Print your name in the upper right-hand corner of the first page of each section of your answer sheets.
004  a  b  c  d     
: 8. The point value for each question is indicated in parentheses after the question.
 
: 9. Partial credit will NOT be given.
005  a  b  c  d     
: 10. If the intent of a question is unclear, ask questions of the examiner only.
 
: 11. When you are done and have turned in your examination, leave the examination area as defined by the examiner.
006  a  b  c  d     
 
007  a   b  c  d     
 
008  a  b  c  d     
 
009  a  b  c  d     
 
010  a  b  c  d     


011  a  b  c  d     
EQUATION SHEET C    C                              C    C Q = m cp T =                       Q = m h C
 
Q = UA T                            SCR = S/(1-Keff)
012  a  b  c  d     
CR1 (1-Keff)1 = CR2 (1-Keff)2 26.06 (eff)                       (1-Keff)0 SUR =)))))))))))))                   M = ))))))))))
 
( - )                   (1-Keff)1 SUR = 26.06/                       M = 1/(1-Keff) = CR1/CR0 P = P0 10SUR(t)                     SDM = (1-Keff)/Keff C
013  a  b  c  d     
P = P0 e(t/)                       Pwr = W f m (1-)
 
P = )))))))) Po                      R* = 1 x 10-5 seconds
014  a        b c        d     
  = (R*/) + [(-)/eff]           = R*/(-)
 
= (Keff-1)/Keff                    eff = 0.1 seconds-1
015  a  b  c  d     
= Keff/Keff                               0.693 T1/2 = ))))))
 
DR1D12 = DR2D22                      DR = DRoe-t 6CiE(n)
016  a  b  c  d     
DR = ))))))))
 
R2 1 Curie = 3.7x1010 dps              1 kg = 2.21 lbm 1 hp = 2.54x103 BTU/hr              1 Mw = 3.41x106 BTU/hr 1 BTU = 778 ft-lbf                  EF = 9/5EC + 32 1 gal H2O . 8 lbm                    EC = 5/9 (EF - 32)
017  a  b  c  d     
 
018  a  b  c  d     
 
019  a  b  c  d     
(********** END OF EXAMINATION **********)
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONSDuring the administration of this examination the following rules apply:
: 1. Cheating on the examination means an automatic denial of your application and couldresult in more severe penalties.
: 2. After the examination has been completed, you must sign the statement on the coversheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You mustavoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.4. Use black ink or dark pencil only to facilitate legi ble repr oductions.
: 5. Print your name in the blank provided in the upper right-hand corner of the examinationcover sheet.6. Fill in the date on the cover sheet of the examination (if necessary).
: 7. Print your name in the upper right-hand corner of the first page of each section of youranswer sheets.
: 8. The point value for each question is indicated in parentheses after the question.9. Partial credit will NOT be given. 
: 10. If the intent of a question is unclear, ask questions of the examiner only.
: 11. When you are done and have turned in your examination, leave the examination areaas defined by the examiner.
EQUATION SHEET           Q = m c p T= Q = m h   Q = UA TSCR = S/(1-Keff)
CR 1 (1-Keff)1 = CR 2 (1-Keff)2 26.06 (eff)(1-Keff)0SUR =)))))))))))))       M =
)))))))))) ( - )(1-Keff)1SUR = 26.06/M = 1/(1-Keff) = CR 1/CR 0P = P 0 10SUR(t)SDM = (1-Keff)/Keff P = P 0 e(t/)Pwr = W f m (1-)P = )))))))) P o* = 1 x 10-5 seconds -        _ _ = (*/) + [(-)/eff] = */(-) = (Keff-1)/Keffeff = 0.1 seconds
-1 = Keff/Keff 0.693 T1/2 = ))))))     DR 1 D 1 2 = DR 2 D 2 2 DR = DR o e-t 6CiE(n)DR =))))))))   R 21 Curie = 3.7x10 10 dps1 kg = 2.21 lbm1 hp = 2.54x10 3 BTU/hr1 Mw = 3.41x10 6 BTU/hr1 BTU = 778 ft-lbfF = 9/5C + 321 gal H 2 O  8 lbmC = 5/9 (F - 32)
Section A:
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 7 QUESTIONA.1[1.0 point]Core excess reactivity (ex) changes with -a.fuel element burnup b.control rod height c.neutron energy level d.reactor power levelQUESTIONA.2[1.0 point]Which ONE of the following is the definition of the term "
Cross-Section
?"a.The probability that a neutron will be captured by a nucleus.
b.The most likely energy at which a charge particle will be captured.
c.The length a charged particle travels past the nucleus before being captured.
d.The area of the nucleus including the electron cloud.QUESTIONA.3[1.0 point]A reactor startup is in progress. Each control rod withdrawal is inserting exactly EQUALamounts of reactivity. Select the EXPECTED neutron population and count rate response as "Keff" approaches 1.0.


Section A: L Theory, Thermodynamics & Facility Operating Characteristics                Page 7 QUESTION A.1            [1.0 point]
Core excess reactivity (ex) changes with
: a. fuel element burnup
: b. control rod height
: c. neutron energy level
: d. reactor power level QUESTION A.2            [1.0 point]
Which ONE of the following is the definition of the term Cross-Section?
: a. The probability that a neutron will be captured by a nucleus.
: b. The most likely energy at which a charge particle will be captured.
: c. The length a charged particle travels past the nucleus before being captured.
: d. The area of the nucleus including the electron cloud.
QUESTION A.3            [1.0 point]
A reactor startup is in progress. Each control rod withdrawal is inserting exactly EQUAL amounts of reactivity. Select the EXPECTED neutron population and count rate response as "Keff" approaches 1.0.
The change in neutron population per reactivity insertion is:
The change in neutron population per reactivity insertion is:
: a. SMALLER, and it takes LESS time to reach a new equilibrium count rate
: b. LARGER, and it takes LESS time to reach a new equilibrium count rate.
: c. SMALLER, and it takes MORE time to reach a new equilibrium count rate.
: d. LARGER, and it takes MORE time to reach a new equilibrium count rate.


a.SMALLER, and it takes LESS time to reach a new equilibrium count rate
Section A: L Theory, Thermodynamics & Facility Operating Characteristics                        Page 8 QUESTION A.4          [1.0 point]
One of the conservative features of the NSCR :
: a. Stems from the advantage of a deep reactor pool and therefore colder water.
: b. Can be observed that as the reactor ages its pulsing power peaks are reduced.
: c. Is the presence of Erbium -167 which acts as a resonant neutron absorber.
: d. is that peak axial power in core is near the bottom where water is the coldest.
QUESTION A.5          [1.0 point]
The term reactivity may be described as
: a. a measure of the cores fuel depletion.
: b. negative when Keff is greater than 1.0.
: c. a measure of the cores deviation from criticality.
: d. equal to $.50 when the reactor is prompt critical.
QUESTION A.6          [1.0 point]
The table provided lists data taken during a core loading. Estimate the number of fuel elements needed to go critical.
: a. 24                                                          Count Rate      Number for Fuel Elements
: b. 27                                                              842                2
: c. 30                                                              886                7 1052                12
: d. 38 1296                17 4210                22


b.LARGER, and it takes LESS time to reach a new equilibrium count rate.
Section A: L Theory, Thermodynamics & Facility Operating Characteristics                      Page 9 QUESTION A.7            [1.0 point]
During a startup you increase reactor power from 100 watts to 195 watts in a minute. Which ONE of the following is reactor period?
: a. 30 seconds.
: b. 60 seconds.
: c. 90 seconds.
: d. 120 seconds.
QUESTION A.8            [1.0 point]
The reactor has just been started up and has been at 100% power for 3 hours. The Reactor Operator notes that several small control rod withdrawals are required to maintain power at 100%. Which of the following is the reason for the rod withdrawals?
: a. Fuel temperatures are decreasing.
: b. Xenon is building in to equilibrium concentration.
: c. Pool water temperatures are decreasing.
: d. Samarium is burning out from equilibrium concentration.
QUESTION A.9            [1.0 point]
The Fast Fission Factor () is defined as The ratio of the number of neutrons produced by
: a. fast fission to the number produced by thermal fission.
: b. thermal fission to the number produced by fast fission.
: c. fast and thermal fission to the number produced by thermal fission.
: d. fast fission to the number produced by fast and thermal fission.


c.SMALLER, and it takes MORE time to reach a new equilibrium count rate.
Section A: L Theory, Thermodynamics & Facility Operating Characteristics                            Page 10 QUESTION A.10 [1.0 point]
Given the data in the table to the right, which ONE of the following is the closest to the half-life of the material?
TIME            ACTIVITY
: a. 11 minutes 0 minutes        2400 cps
: b. 22 minutes                                        10 minutes        1757 cps 20 minutes        1286 cps
: c. 44 minutes 30 minutes          941 cps
: d. 51 minutes                                        60 minutes          369 cps QUESTION A.11 [1.0 point]
The amount of radioactivity in any material can be determined by:
: a. Measuring the dose coming from it using an accurate radiation detector.
: b. Taking the results of a. above and multiplying by (4 x pi) to account for geometry.
: c. Measuring the total number of radioactive emissions given off over time.
: d. First figure out c. above, then multiply the results by the correct quality factor.
QUESTION A.12 [1.0 point]
An experienced reactor operator understands that:
: a. The more neutrons multiply during startup the lower the rods are at critical.
: b. There is no fixed relationship between neutron level and criticality.
: c. Neutron multiplication during startup is just neutrons getting lost at a slower rate.
: d. Without the Sb-Be source the reactor would not go critical.


d.LARGER, and it takes MORE time to reach a new equilibrium count rate.
Section A: L Theory, Thermodynamics & Facility Operating Characteristics                      Page 11 QUESTION A.13 [1.0 point]
Section A:
The reactor has been at 100% power for several hours when a reactor scram occurs. All systems have operated as designed, no experiments have been changed, and no fuel has been removed from the reactor. Several hours after the reactor scram, indicated reactor power will stabilize due to:
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 8 Count RateNumber for Fuel Elements8422 8867105212 129617 421022QUESTIONA.4[1.0 point]One of the conservative features of  the NSCR :a.Stems from the advantage of a deep reactor pool and therefore colder water.
: a. continuing decay of the shortest-lived delayed neutron precursor.
b.Can be observed that as the reactor ages its pulsing power peaks are reduced.
: b. the decay of nuclear instrumentation compensation voltage at low power levels.
c.Is the presence of Erbium -167 which acts as a resonant neutron absorber.
: c. reaching the nuclear instrumentation minimum detectable level.
d.is that peak axial power in core is near the bottom where water is the coldest.QUESTIONA.5[1.0 point]The term "reactivity" may be described as -a.a measure of the core's fuel depletion.
: d. the continuing subcritical multiplication of source neutrons.
b.negative when Keff is greater than 1.0.c.a measure of the core's deviation from criticality.
QUESTION A.14 [1.0 point]
d.equal to $.50 when the reactor is prompt critical.QUESTIONA.6[1.0 point]The table provided lists data taken during a core loading. Estimate the number of fuel elementsneeded to go critical.a.24 b.27 c.30 d.38 Section A:
A fissile material is one which will fission upon the absorption of a THERMAL neutron. Which ONE of following listed isotopes is not a fissile material?
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 9 QUESTIONA.7[1.0 point]During a startup you increase reactor power from 100 watts to 195 watts in a minute. WhichONE of the following is reactor period?a.30 seconds.
: a. Th232
b.60 seconds.
: b. U233
c.90 seconds.
: c. U235
d.120 seconds.QUESTIONA.8[1.0 point]The reactor has just been started up and has been at 100% power for 3 hours. The Reactor Operatornotes that several small control rod withdrawals are required to maintain power at 100%. Which of the following is the reason for the rod withdrawals?
: d. Pu239 QUESTION A.15 [1.0 point]
The NSCR operates on the bottom of a 30 foot deep pool filled with 106, 000 gallons of water:
: a. Providing a large static head forcing flow up through the reactor.
: b. Permitting greater margin to boiling because of the higher static pressure.
: c. Creating a thermal heat sink separated from the core by greater distance.
: d. Allowing a more even distribution of BTUs in the reactor core.


a.Fuel temperatures are decreasing.
Section A: L Theory, Thermodynamics & Facility Operating Characteristics                      Page 12 QUESTION A.16 [1.0 point]
The reactor is operating at 100 KW. The reactor operator withdraws the Regulating Rod allowing power to increase. The operator then inserts the same rod to its original position, decreasing power. In comparison to the rod withdrawal, the period due to the rod insertion will be
: a. longer due to long lived delayed neutron precursors.
: b. shorter due to long lived delayed neutron precursors.
: c. same due to equal amounts of reactivity being added.
: d. same due to equal reactivity rates from the rod.
QUESTION A.17 [1.0 point]
When a reactor is scrammed, the xenon population starts to increase. This occurs primarily because:
: a. delayed neutrons are continuing to be produced and cause fissions, resulting in xenon production.
: b. the half-life for the decay of I-135 is shorter than the half-life for the decay of Xe-135.
: c. Xe-135 is stable and does not decay.
: d. xenon burnout does not occur due to the low neutron population.
QUESTION A.18 [1.0 point]
In order to make the maximum use of the NSCR reactor core:
: a. Graphite reflectors are kept near the periphery edges.
: b. Control rods are located in the lower flux areas.
: c. Two rod bundles are used next to flux traps on the core edge.
d., Flux near the core edge is kept lower than in the center to avoid losses.


b.Xenon is building in to equilibrium concentration.
Section A: L Theory, Thermodynamics & Facility Operating Characteristics                  Page 13 QUESTION A.19 [1.0 point]
Identify the PRINCIPAL source of heat in the reactor after shutdown?
: a. Stored energy from the reactor and core materials
: b. Spontaneous fission within the core
: c. Decay of fission products
: d. Cosmic radiation causing fission QUESTION A.20 [1.0 point]
Assume that the NSCR pool contains 106, 000 gallons at 90 degrees F and it heats up to 93 degrees F in two hours at indicated 400Kw. Assume no heat is removed from the pool. Based on your calculation results you should recommend to the SRO:
: a. Make adjustment to correct the linear power channel indication.
: b. Add more ice to the bath and wait two more hours.
: c. Lower the reactor power to the steady state power calculated.
: d. Maintain the power and wait for the ice bath to melt some more.


c.Pool water temperatures are decreasing.
Section B Normal, Emergency and Radiological Control Procedures                            Page 14 QUESTION B.1          [1.0 point]
An accessible area within the facility has general radiation levels of 325 mrem/hour. What would be the EXPECTED posting for this area?
: a. "Caution, Very High Radiation Area"
: b. "Danger, Airborne Radioactivity Area"
: c. "Danger, High Radiation Area"
: d. "Caution, Radiation Area" QUESTION B.2          [1.0 point]
While working on an experiment, you receive the following radiation doses: 100 mrem (),
25 mrem (), and 5 mrem (thermal neutrons). Which ONE of the following is your total dose?
: a. 175 mrem
: b. 155 mrem
: c. 145 mrem
: d. 130 mrem QUESTION B.3          [2.0 points, 1/2 each]
Match type of radiation (1 thru 4) with the proper penetrating power (a thru d)
: a. Gamma              1. Stopped by thin sheet of paper
: b. Beta              2. Stopped by thin sheet of metal
: c. Alpha              3. Best shielded by light material
: d. Neutron            4. Best shielded by dense material


d.Samarium is burning out from equilibrium concentration. QUESTIONA.9[1.0 point]The Fast Fission Factor () is defined as "The ratio of the number of neutrons produced by -a.fast fission  to the number produced by thermal fission.
Section B Normal, Emergency and Radiological Control Procedures                              Page 15 QUESTION B.4          [1.0 point]
b.thermal fission  to the number produced by fast fission.
10CFR50.54(x) states: A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent. Per 10CFR50.54(y), which one of the following is the minimum level of authorization for this action?
c.fast and thermal fission to the number produced by thermal fission.
: a. Reactor Operator licensed at the facility.
d.fast fission to the number produced by fast and thermal fission.
: b. Senior Reactor Operator licensed at the facility.
Section A:
: c. Facility Manager (or equivalent at facility).
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 10 QUESTIONA.10[1.0 point]Given the data in the table to the right, which ONE of the following is the closest to the half-lifeof the material?a.11 minutes b.22 minutes c.44 minutes d.51 minutesQUESTIONA.11[1.0 point]The amount of radioactivity in any material can be determined by:
: d. The U.S. Nuclear Regulatory Commission Project Manager QUESTION B.5          [1.0 point]
a.Measuring the dose coming from it using an accurate radiation detector.
Which ONE of the following conditions is NOT permissible when the reactor is operating, or about to be operated?
b.Taking the results of a. above and multiplying by (4 x pi) to account for geometry.
: a. The reactivity worth of a single experiment = $1.00.
c.Measuring the total number of radioactive emissions given off over time.
: b. A control rod scram = 1.5 seconds.
d.First figure out c. above, then multiply the results by the correct quality factor.QUESTIONA.12[1.0 point]An experienced reactor operator understands that:
: c. An excess reactivity = $2.20.
a.The more neutrons multiply during startup the lower the rods are at critical.
: d. The Continuous Air Radiation Monitor is inoperable due to maintenance.
b.There is no fixed relationship between neutron level and criticality.
QUESTION B.6          [1.0 point]
c.Neutron multiplication during startup is just neutrons getting lost at a slower rate.
As permitted by 10 CFR 50.59, the NSCR may:
d.Without the Sb-Be source the reactor would not go critical.TIMEACTIVITY0 minutes2400 cps10 minutes1757 cps20 minutes1286 cps 30 minutes941 cps 60 minutes369 cps Section A:
: a. Modify systems and change the Technical Specifications (TS) if the NRC is notified afterwards.
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 11 QUESTIONA.13[1.0 point]The reactor has been at 100% power for several hours when a reactor scram occurs. Allsystems have operated as designed, no experiments have been changed, and no fuel has been removed from the reactor. Several hours after the reactor scram, indicated reactor power will stabilize due to:
: b. Perform new and little understood experiments when they are for research.
: c. Determine the affects of modifications and their impact on TS.
: d. Redefine the boundaries of accidents previously analyzed in the Safety Analysis Report (SAR).


a.continuing decay of the shortest-lived delayed neutron precursor.
Section B Normal, Emergency and Radiological Control Procedures                                  Page 16 QUESTION B.7            [1.0 point]
Which ONE of the following is the 10 CFR 20 definition of TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)?
: a. The sum of the deep does equivalent and the committed effective dose equivalent.
: b. The dose that your whole body receives from sources outside the body.
: c. The sum of the external deep dose and the organ dose.
: d. The dose to a specific organ or tissue resulting from an intake of radioactive material.
QUESTION B.8            [1.0 point]
Prior to startup of the reactor there:
: a. Must be a licensed member of management available.
: b. Has to be a safety system Channel Test on record.
: c. Must be a Senior HP or his designated representative in the facility.
: d. Will be signatures of all required persons in the Reactor Startup log.
QUESTION B.9            [1.0 point]
A small radioactive source is to be stored in the reactor building. The source reads 2 R/hr at 1 foot. Assuming no shielding is to be used, a Radiation Area barrier would have to be erected from the source at least a distance of approximately:
: a. 400 feet
: b. 40 feet
: c. 20 feet
: d. 10 feet QUESTION B.10 [1.0 point]
Which ONE of the following does not require the direct supervision (i.e., presence) of an SRO?
: a. Movement of the reactor bridge.
: b. Initiation of a pulse.
: c. Removal of a control rod.
: d. Performance of a power calibration of the Linear Power Channel.


b.the decay of nuclear instrumentation compensation voltage at low power levels.
Section B Normal, Emergency and Radiological Control Procedures                                Page 17 QUESTION B.11 [1.0 point]
The reactor power level shall not exceed 1.3 megawatts under any condition of operation.
This is an example of a:
: a. safety limit.
: b. limiting safety system setting.
: c. limiting condition for operation.
: d. surveillance requirement.
QUESTION B.12 [1.0 point]
An experiment with a reactivity worth of $0.20 is to be removed from the core. Prior to performing this operation:
: a. reactor power must be less than 600 kW.
: b. the reactor must be secured.
: c. the reactor must be subcritical by at least $0.40.
: d. the reactor must be shutdown.
QUESTION B.13 [1.0 point]
An experimenter transfers a rabbit into the core, requiring the operator to fully insert the regulating rod from its 50% position and to insert shim rod #4 approximately half way from its 70% position to maintain a constant power level. What action is required?
: a. Make sure the experiment is secured before completing operation for the day. Notify the NSC Director and the experimenter of the change in experiment status.
: b. Withdraw the rods in sequence to restore them to the normal banked position; then remove the experiment from the core. Notify the Health Physicist so that he can monitor the sample movement.
: c. Shutdown the reactor and notify the NSC Director. Removal of the experiment and restart of the reactor require NSC Director approval.
: d. Shutdown the reactor and evacuate the facility. Re-entry into the facility requires Emergency Director approval. Restart of the reactor requires NRC approval.


c.reaching the nuclear instrumentation minimum detectable level.
Section B Normal, Emergency and Radiological Control Procedures                                Page 18 QUESTION B.14 [1.0 point]
In accordance with the Emergency Classification Guide, all alarms from the Facility Air Monitor System are classified as Operational Events with the exception of:
: a. Stack Particulate Monitor.
: b. Building Gas Monitor.
: c. Fission Gas Monitor.
: d. Stack Gas Monitor.
QUESTION B.15 [1.0 point]
You have not performed the functions of an RO or SRO in the past 6 months. Per the Regulations, prior to resuming activities authorized by your license, how many hours must you complete in that function under the direction of an RO or SRO as appropriate?
: a. 4
: b. 6
: c. 12
: d. 40 QUESTION B.16 [1.0 point]
Which ONE of the following reactor safety system channels is required to be operable in BOTH the steady state and pulse modes of operation?
: a. Low Power Interlock
: b. Log Power 1 KW Interlock
: c. Detector Power Supply Failure
: d. Fuel Element Temperature


d.the continuing subcritical multiplication of source neutrons.QUESTIONA.14[1.0 point]A fissile material is one which will fission upon the absorption of a THERMAL neutron. WhichONE of following listed isotopes is not a fissile material?a.Th 232b.U 233c.U 235d.Pu 239QUESTIONA.15[1.0 point]The NSCR operates on the bottom of a 30 foot deep pool filled with 106, 000 gallons of water:
Section B Normal, Emergency and Radiological Control Procedures                                Page 19 QUESTION B.17 [1.0 point]
a.Providing a large static head forcing flow up through the reactor.
The area within the operations boundary for the NSCR (defined as the reactor confinement building).
b.Permitting greater margin to boiling because of the higher static pressure.
Which one of the following terms matches the above definition?
c.Creating a thermal heat sink separated from the core by greater distance.
: a. Emergency Support Center (ESC)
d.Allowing a more even distribution of BTUs in the reactor core.
: b. Emergency Planning Zone (EPZ)
Section A:
: c. Site Boundary
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 12 QUESTIONA.16[1.0 point]The reactor is operating at 100 KW. The reactor operator withdraws the Regulating Rodallowing power to increase. The operator then inserts the same rod to its original position, decreasing power. In comparison to the rod withdrawal, the period due to the rod insertion will
: d. Controlled Access Area (CAA)
QUESTION B.18 [1.0 point]
Which one of the following incidents should be classified as a Notification of Unusual Event?
A. Reactor pool level decreasing at a rate exceeding makeup capacity.
B. Stack gas monitor (Channel 3) is alarming.
C. Report of a tornado which could strike the facility.
D. Personnel injury with radiological complications.
QUESTION B.19 [1.0 point]
Which ONE of the following is a duty of the Reactor Operator (RO) during an emergency which requires a facility evacuation?
: a. Verify that rope barriers are in place in the reception room.
: b. Verify all persons are accounted for.
: c. Verify all doors to the reactor building are closed.
: d. Shutdown building air handling and exhaust systems.


be -a.longer due to long lived delayed neutron precursors.
Section C Facility and Radiation Monitoring Systems                                          Page 20 QUESTION C.1          [1.0 point]
b.shorter due to long lived delayed neutron precursors.
Mechanical stops prevent inadvertent movement of the NSCR closer than _____ from the irradiation cell window.
c.same due to equal amounts of reactivity being added.
: a. 12 ft
d.same due to equal reactivity rates from the rod. QUESTIONA.17[1.0 point]When a reactor is scrammed, the xenon population starts to increase. This occurs primarily because:a.delayed neutrons are continuing to be produced and cause fissions, resulting in xenonproduction.b.the half-life for the decay of I-135 is shorter than the half-life for the decay of Xe-135.
: b. 8 ft
c.Xe-135 is stable and does not decay.
: c. 18 inches
d.xenon burnout does not occur due to the low neutron population.QUESTIONA.18[1.0 point]In order to make the maximum use of the NSCR reactor core:
: d. 3 inches QUESTION C.2 [1.0 point]
a.Graphite reflectors are kept near the periphery edges.
According to SOP II-C, "Reactor Startup," which one of the following anticipated power levels would require placing the diffuser system in operation?
b.Control rods are located in the lower  flux areas.
: a. 5 Kw
c.Two rod bundles are used next to flux traps on the core edge.
: b. 10 Kw
d.,Flux near the core edge is kept lower than in the center to avoid losses.
: c. 100 Kw
Section A:
: d. 500 Kw QUESTION C.3 [1.0 point]
L Theory, Thermodynamics & Facility Operating CharacteristicsPage 13 QUESTIONA.19[1.0 point]Identify the PRINCIPAL source of heat in the reactor after shutdown?
The reactor is operating at max allowed power (per SOP IV-F, Neutron Radiography Beam Port
#4) while located in the stall and positioned against the radiography reflector. Select the statement that describes the indication[s] the operator would see in the control room if the shield door to enter the cave were to be opened.
: a. The C-2 device would cause the reactor to trip and an alarm would sound.
: b. The C-2 device would sound an alarm in the control room.
: c. The beamport No. 4 area radiation monitor would alarm.
: d. No indication in the control room.


a.Stored energy from the reactor and core materials
Section C Facility and Radiation Monitoring Systems                                              Page 21 QUESTION C.4 [1.0 point]
Which one of the following choices correctly describes the capability of the emergency pool fill system, in case of a loss of beam port integrity?
: a. Approximately 1200 GPM
: b. Approximately 800 GPM.
: c. Approximately 400 GPM.
: d. Approximately 200 GPM.
QUESTION C.5 [1.0 point]
The emergency exhaust air filter system, installed between the exhaust fan and the exhaust stack, consists of:
: a. TWO activated carbon filter banks, and ONE particulate filter bank.
: b. TWO activated carbon filter banks, and TWO particulate filter banks.
: c. ONE activated carbon filter bank, and TWO particulate filter banks.
: d. ONE activated carbon filter bank, and ONE particulate filter bank.
QUESTION C.6 [1.0 point]
The reactor is being operated at 100 kw in the "Servo" mode of control. The compensating voltage to the Linear Power measuring channel suddenly begins to trend down due to a malfunction. Select the statement that describes reactor response with no operator action.
: a. The regulating rod would move in, causing power to decrease
: b. The regulating rod would move out, causing power to increase
: c. All scram capable rods would insert
: d. The regulating rod would shift back to manual due to a lower indicated reactor power.


b.Spontaneous fission within the core
Section C Facility and Radiation Monitoring Systems                                              Page 22 QUESTION C.7 [1.0 point]
Select the statement that describes the method of selecting the amount of reactivity inserted for a pulse.
: a. Placement of the mechanical pulse stop on the transient rod mounting plate.
: b. Adjustment of the air supply pressure to the pneumatic cylinder.
: c. Placement of the mechanical pulse stop on the air supply solenoid valve.
: d. Adjustment of the position of the pneumatic cylinder.
QUESTION C.8 [1.0 point]
A power calibration (calorimetric) of the linear power channel has been performed. In order to make the front panel meter indication agree with the calculated power:
: a. the compensating voltage of the linear channel CIC is adjusted.
: b. the high voltage of the linear channel CIC is adjusted.
: c. the position of the linear channel CIC is adjusted.
: d. the full power gain adjust potentiometer is adjusted.
QUESTION C.9 [1.0 point]
The primary purpose of the safety plate assembly is to:
: a. Provide additional support to the reactor grid plate for the use of highly enriched FLIP fuel elements.
: b. Insure that the maximum reactivity insertion for a pulse cannot be exceeded..
: c. Retain a shim-safety rod fuel follower if it becomes detached from its mounting.
: d. Retain any debris resulting from an accident which has directly involved the fuel elements.


c.Decay of fission products
Section C Facility and Radiation Monitoring Systems                                                Page 23 QUESTION C.10 [1.0 point]
Assume the reactor is initially operating in the Steady State mode at a power level of 500 Kw.
Which one of the following describes the response of the control rods on the receipt of a scram signal generated by ONLY Safety Amplifier Channel #1? Assume no operator action.
: a. Shim-safety rods #1 and #2 will scram, all other rods will remain at their pre-scram positions.
: b. Shim-safety rods #1 and #3 will scram, all other rods will remain at their pre-scram positions.
: c. All Shim-safety rods and the transient rod will scram, regulating rod will remain at its pre-scram position.
: d. All six control rods will scram.
QUESTION C.11 [1.0 point]
Under emergency conditions, the master control panel located in the reception room may be used to:
: a. scram the reactor.
: b. operate the air handling systems.
: c. operate the emergency pool fill system.
: d. operate the emergency lighting system.
QUESTION C.12 [1.0 point]
De-energizing the solenoid valve which controls the supply of air to the pneumatic transient rod drive unit will cause ...
: a. the piston and the transient rod to drive upward until the piston reaches its upper limit stop.
: b. the pneumatic piston to drop to its lower limit and the transient rod to remain in the full down position.
: c. the air pressure to remain at an operating level for several hours maintaining the transient rod in its original position.
: d. the transient rod to remain at its original position and a low pressure alarm to initiate in the control room.


d.Cosmic radiation causing fissionQUESTIONA.20[1.0 point]Assume that the NSCR pool contains 106, 000 gallons at 90 degrees F and it heats up to 93 degrees F in two hours at indicated 400Kw. Assume no heat is removed from the pool. Based on your calculation results you should recommend to the SRO:a.Make adjustment to correct the linear power channel indication.
Section C Facility and Radiation Monitoring Systems                                              Page 24 QUESTION C.13 [1.0 point]
b.Add more ice to the bath and wait two more hours.
A reactor scram has occurred from an initial shim-safety rod position of 50.0%. Which one of the following correctly describes the indications for shim-safety rod #3 immediately following the scram? Assume no operator action.
c.Lower the reactor power to the steady state power calculated.
: a. ENGAGED light off, ROD DOWN light energized, CARR DOWN light off, digital indication 0.0%.
d.Maintain the power and wait for the ice bath to melt some more.
: b. ENGAGED light off, ROD DOWN light energized, CARR DOWN light energized, digital indication 50.0%.
Section B Normal, Emergency and Radiological Control ProceduresPage 14QUESTIONB.1[1.0 point]An accessible area within the facility has general radiation levels of 325 mrem/hour. Whatwould be the EXPECTED posting for this area?
: c. ENGAGED light off, ROD DOWN light energized, CARR DOWN light off, digital indication 50.0%.
: d. ENGAGED light energized, ROD DOWN light off, CARR DOWN light off, digital indication 0.0%.
QUESTION C.14 [2.0 point]
Match the nuclear instrumentation channel in column B that satisfies the control function in column A. (the items in column B may be used once, more than once or not at all; and only a single answer may occupy one answer space in column A)
Column A                                    Column B (control function)                        (nuclear instrument)
: a. Energizes interlock that prevents          1. Log power channel start-ups when less than 2 cps
: b. Energizes interlock that prevents          2. Linear power channel pulsing operations when greater than 1 kw
: 3. Safety channel(s)
: c. Inputs reactor scram signal when power is greater than 125%
: d. Inputs reactor scram signal in the event of a reactor period of 3 seconds or less


a."Caution, Very High Radiation Area"
Section C Facility and Radiation Monitoring Systems                                            Page 25 QUESTION C.15 [1.0 point]
Which ONE of the following is the method you should use (as the console operator) to sound the ventilation alarm if the solenoid valve was inadvertently left shut in the reception room?
: a. The normal switch on the control panel should still work.
: b. Open a "bypass" valve located in the control room.
: c. Open a "bypass" valve located just inside the door leading out of containment.
: d. Override the solenoid signal via a switch located in the back of the reactor console.
QUESTION C.16 [1.0 point]
Which one of the following choices is correct regarding the minimum equipment required to achieve confinement of the reactor building? Assume no maintenance is in progress.
: a. Central exhaust fan available.
: b. Central exhaust fan in operation and the ventilation system controls in the reception room available.
: c. The ventilation system and the Radiation Monitoring Channels in operation.
: d. Central exhaust fan and the Radiation Monitoring Channels in operation.
QUESTION C.17 [1.0 point]
Which ONE of the following alarms requires the air handlers to be shut down as part of immediate action?
: a. stack particulate monitor
: b. stack gas monitor
: c. building particulate monitor
: d. building gas monitor


b."Danger, Airborne Radioactivity Area"
Section C Facility and Radiation Monitoring Systems                                    Page 26 QUESTION C.18 [1.0 point]
Assuming the reactor is shutdown and all systems in a normal line-up, which one of the following pressures at the primary pump would indicate a full reactor pool?
A. 47 psig B. 42 psig C. 33 psig D. 15 psig QUESTION C.19 [1.0 point]
Thermocouples in the instrumented fuel element measure temperature at the:
: a. interior surface of the cladding.
: b. center of the zirconium rod.
: c. outer surface of the fuel.
: d. interior of the fuel.


c."Danger, High Radiation Area"
Answer Key A.1  a REF: Reactor Training Manual - Core Excess and Shutdown Margin.
A.2  a REF: Reactor Training Manual - Cross Section.
A.3  d REF: Reactor Training Manual - Introduction To Nuclear Physics A.4. c REF: NSCR SAR, CHAP II, IV A.5  c REF: Reactor Training Manual - Reactivity A.6  a REF: Standard NRC question A.7  c REF: P = P0 et/ >  = t/ln(P/P0)  = 60/ln (195/100) = 60/ln(1.95) = 89.84 . 90 sec.
A.8  b REF: Reactor Training Manual - Reactor Physics and Kinetics A.9  c REF: Reactor Training Manual - Neutron Life Cycle A.10 b REF: Reactor Training Manual - Reactivity A.11 c REF: Glasstone, 1958, CHAP 5, LAMARSH, 1983, CHP2.8 A.12 b REF: Glasstone, 1958, CHAP 14 A.13 d REF: Reactor Training Manual - Introduction to Nuclear Physics A.14 a REF: Glasstone and Sesonske, Third Ed. § 1.45 A.15 b REF: License Amendment Submittal, 7/15/96, pp 23 A.16 a REF: Reactor Training Manual - Reactor Physics and Kinetics A.17 b REF: Burn, Introduction to Nuclear Reactor Operations


d."Caution, Radiation Area"QUESTIONB.2[1.0 point]While working on an experiment, you receive the following radiation doses: 100 mrem (),25 mrem (), and 5 mrem (thermal neutrons). Which ONE of the following is your total dose?a.175 mrem b.155 mrem c.145 mrem d.130 mremQUESTIONB.3[2.0 points, 1/2 each]Match type of radiation (1 thru 4) with the proper penetrating power (a thru d) 
Answer Key A.18. a REF: Reactor Training Manual - Reactor Physics and Kinetics A.19 c REF: LaMarsh, pgs 318 - 320 A.20. a REF: Q=mc(Tfin-Tini) where: m=106,000 gal.x 8lbm/gal=848,000 lbm; c=1 BTU/EF-lbm; Tfin=93 and Tini=90. Q=848,000 lbmx1BTU/EF-lbmx1.5EF=1.0272E6 BTU/hr x 2.93E-4
: a. Gamma1. Stopped by thin sheet of paper
      = 373Kw ]
: b. Beta2. Stopped by thin sheet of metal
: c. Alpha3. Best shielded by light material
: d. Neutron4. Best shielded by dense material Section B  Normal, Emergency and Radiological Control ProceduresPage 15QUESTIONB.4[1.0 point]10CFR50.54(x) states:  "A licensee may take reasonable action that departs from a licensecondition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provideadequate or equivalent protection is immediately apparent."  Per 10CFR50.54(y), which one ofthe following is the minimum level of authorization for this action?a.Reactor Operator licensed at the facility.
b.Senior Reactor Operator licensed at the facility.
c.Facility Manager (or equivalent at facility).
d.The U.S. Nuclear Regulatory Commission Project ManagerQUESTIONB.5[1.0 point]Which ONE of the following conditions is NOT permissible when the reactor is operating, orabout to be operated?a.The reactivity worth of a single experiment = $1.00.
b.A control rod scram = 1.5 seconds.
c.An excess reactivity = $2.20.
d.The Continuous Air Radiation Monitor is inoperable due to maintenance.QUESTIONB.6[1.0 point]As permitted by 10 CFR 50.59, the NSCR may:a.Modify systems and change the Technical  Specifications (TS) if the NRC is notifiedafterwards.b.Perform new and little understood experiments when they are for research.
c.Determine the affects of modifications and their impact on TS.
d.Redefine the boundaries of accidents previously analyzed in the Safety Analysis Report(SAR).
Section B  Normal, Emergency and Radiological Control ProceduresPage 16QUESTIONB.7[1.0 point]Which ONE of the following is the 10 CFR 20 definition of TOTAL EFFECTIVE DOSEEQUIVALENT (TEDE)
?a.The sum of the deep does equivalent and the committed effective dose equivalent.b.The dose that your whole body receives from sources outside the body.
c.The sum of the external deep dose and the organ dose.
d.The dose to a specific organ or tissue resulting from an intake of radioactive material.QUESTIONB.8[1.0 point]Prior to startup of the reactor there:
a.Must be a licensed member of management available.
b.Has to be a  safety system Channel Test on record.
c.Must be a Senior HP or his designated representative in the facility.
d.Will be signatures of all required persons in the Reactor Startup log.QUESTIONB.9[1.0 point]A small radioactive source is to be stored in the reactor building. The source reads 2 R/hr at 1foot. Assuming no shielding is to be used, a Radiation Area barrier would have to be erected from the source at least a distance of approximately:a.400 feet b.40 feet c.20 feet d.10 feetQUESTIONB.10[1.0 point]Which ONE of the following does not require the direct supervision (i.e., presence) of an SRO?a.Movement of the reactor bridge.
b.Initiation of a pulse.
c.Removal of a control rod.
d.Performance of a power calibration of the Linear Power Channel.
Section B  Normal, Emergency and Radiological Control ProceduresPage 17QUESTIONB.11[1.0 point]"The reactor power level shall not exceed 1.3 megawatts under any condition of operation." This is an example of a:a.safety limit.
b.limiting safety system setting.
c.limiting condition for operation.
d.surveillance requirement.QUESTIONB.12[1.0 point]An experiment with a reactivity worth of $0.20 is to be removed from the core. Prior toperforming this operation:a.reactor power must be less than 600 kW.
b.the reactor must be secured.
c.the reactor must be subcritical by at least $0.40.
d.the reactor must be shutdown.QUESTIONB.13[1.0 point]An experimenter transfers a rabbit into the core, requiring the operator to fully insert theregulating rod from its 50% position and to insert shim rod #4 approximately half way from its 70% position to maintain a constant power level. What action is required?


a.Make sure the experiment is secured before completing operation for the day. Notify theNSC Director and the experimenter of the change in experiment status.  
Answer Key B.1      c REF: Reactor Training Manual - 10CFR20 B.2      d REF: Reactor Training Manual - Ionizing Radiation B.3      a, 4; b, 2; c, 1; d, 3 REF: Reactor Training Manual - Health Physics B.4      b REF: 10CFR50.54(y).
B.5      b REF: Technical Specifications, Section 3.2.3.
B.6      c REF: SOP I & 10 CFR 50.59 B.7      a REF: 10 CFR 20.1003 Definitions B.8      b REF: SOP II, REACTOR OPERATIONS, C.1.
B.9      c REF:
DR1 DR2                DR1 2        2000 2
        =          X 22 =    X  X2 =    x 1 = 400 ft 2 X = 20 ft X 2 2 X 12            DR2            5 B.10 d REF: SOP II-G Step 1 - SOP II-I Step 1,a - SOP II-E Step g - SOP II-J B.11 c REF: T.S. 3.1.1 B.12 a REF: SOP II-D Step 6 B.13 c REF: Reactivity inserted ($1.6 (shim) + $0.4 (reg) = $2.0 SOP II-N, TS 6.5.2 require shutdown and NSC Director approval for restart.
B.14 c REF: Emergency Classification Guide, pg. 2 B.15 b REF: 10CFR55.53(f)(2))


b.Withdraw the rods in sequence to restore them to the normal banked position; then removethe experiment from the core. Notify the Health Physicist so that he can monitor the sample movement.  
Answer Key B.16 d REF: TS 3.2.2, Table 1 B.17 b REF: Emergency Preparedness Plan Section 6.0 B.18 c REF: Emergency Classification Guide B.19 d REF: SOP IX § B Step f


c.Shutdown the reactor and notify the NSC Director. Removal of the experiment and restartof the reactor require NSC Director approval.  
Answer Key C.1  b REF: SOP IV-E; SAR pg. 87 C.2  d REF: SOP II-C, p. 2.
C.3  a REF: SAR p. 89, and SOP IV F p.2 C.4  c REF: SAR, p. 112.
C.5  c REF: SAR, p. 79.
C.6  a REF: SOP III-C C.7  d REF: SAR p.38, SOP II-E step 4 C.8  d REF: SOP II-J; Step 4.c C.9  c REF: SAR, p. 14.
C.10 c REF: SAR, Figure 7-3.
C.11 b REF: SAR, page 76.
C.12 b REF: SAR p.38 C.13 c REF: SAR, pp. 26-29.
C.14 a. 1 b. 1 c. 3      d. 1 REF: SAR pp 91-93 C.15 b REF: SOP III-R C.16 b REF: TS 3.3.2.


d.Shutdown the reactor and evacuate the facility. Re-entry into the facility requiresEmergency Director approval. Restart of the reactor requires NRC approval.
Answer Key C.17 a REF: SOP VII-A4.c.2 C.18 d REF: SOP IX-E-1 p. 2 C.19 d REF: SAR, p 18.}}
Section B  Normal, Emergency and Radiological Control ProceduresPage 18QUESTIONB.14[1.0 point]In accordance with the Emergency Classification Guide, all alarms from the Facility Air MonitorSystem are classified as Operational Events with the exception of:a.Stack Particulate Monitor.
b.Building Gas Monitor.
c.Fission Gas Monitor.
d.Stack Gas Monitor.QUESTIONB.15[1.0 point]You have not performed the functions of an RO or SRO in the past 6 months. Per theRegulations, prior to resuming activities authorized by your license, how many hours must you complete in that function under the direction of an RO or SRO as appropriate?a.4 b.6 c.12 d.40QUESTIONB.16[1.0 point]Which ONE of the following reactor safety system channels is required to be operable in BOTHthe steady state and pulse modes of operation?
: a. Low Power Interlock
: b. Log Power 1 KW Interlock
: c. Detector Power Supply Failure
: d. Fuel Element Temperature Section B  Normal, Emergency and Radiological Control ProceduresPage 19QUESTIONB.17[1.0 point]"The area within the operations boundary for the NSCR (defined as the reactor confinementbuilding)."Which one of the following terms matches the above definition?
a.Emergency Support Center (ESC) b.Emergency Planning Zone (EPZ) c.Site Boundary d.Controlled Access Area (CAA)QUESTIONB.18[1.0 point]Which one of the following incidents should be classified as a "Notification of Unusual Event"?
A.Reactor pool level decreasing at a rate exceeding makeup capacity.
B.Stack gas monitor (Channel 3) is alarming.
C.Report of a tornado which could strike the facility.
D.Personnel injury with radiological complications.QUESTIONB.19[1.0 point]Which ONE of the following is a duty of the Reactor Operator (RO) during an emergency whichrequires a facility evacuation?a.Verify that rope barriers are in place in the reception room.
b.Verify all persons are accounted for.
c.Verify all doors to the reactor building are closed.
d.Shutdown building air handling and exhaust systems.
Section C Facility and Radiation Monitoring SystemsPage 20QUESTIONC.1[1.0 point]Mechanical stops prevent inadvertent movement of the NSCR closer than _____ from theirradiation cell window.a.12 ft b.8 ft c.18 inches d.3 inches QUESTION  C.2[1.0 point]According to SOP II-C, "Reactor Startup," which one of the following anticipated power levels would require placing the diffuser system in operation?a. 5 Kw
: b. 10 Kw
: c. 100 Kw
: d. 500 KwQUESTION  C.3[1.0 point]The reactor is operating at max allowed power (per SOP IV-F, Neutron Radiography Beam Port#4) while located in the stall and positioned against the radiography reflector. Select the statement that describes the indication[s] the operator would see in the control room if the shield door to enter the cave were to be opened.a.The C-2 device would cause the reactor to trip and an alarm would sound.
b.The C-2 device would sound an alarm in the control room.
c.The beamport No. 4 area radiation monitor would alarm.
d.No indication in the control room.
Section C Facility and Radiation Monitoring SystemsPage 21QUESTION  C.4[1.0 point]Which one of the following choices correctly describes the capability of the emergency pool fillsystem, in case of a loss of beam port integrity?a.Approximately 1200 GPM b.Approximately 800 GPM.
c.Approximately 400 GPM.
d.Approximately 200 GPM.QUESTION  C.5[1.0 point]The emergency exhaust air filter system, installed between the exhaust fan and the exhauststack, consists of:a.TWO activated carbon filter banks, and ONE particulate filter bank.
b.TWO activated carbon filter banks, and TWO particulate filter banks.
c.ONE activated carbon filter bank, and TWO particulate filter banks.
d.ONE activated carbon filter bank, and ONE particulate filter bank.QUESTION  C.6[1.0 point]The reactor is being operated at 100 kw in the "Servo" mode of control. The compensatingvoltage to the Linear Power measuring channel suddenly begins to trend down due to a malfunction. Select the statement that describes reactor response with no operator action.a.The regulating rod would move in, causing power to decrease b.The regulating rod would move out, causing power to increase c.All scram capable rods would insert d.The regulating rod  would shift back to manual due to a lower indicated reactor power.
Section C Facility and Radiation Monitoring SystemsPage 22QUESTION  C.7[1.0 point]Select the statement that describes the method of selecting the amount of reactivity inserted for a pulse.a.Placement of the mechanical pulse stop on the transient rod mounting plate.
b.Adjustment of the air supply pressure to the pneumatic cylinder.
c.Placement of the mechanical pulse stop on the air supply solenoid valve.
d.Adjustment of the position of the pneumatic cylinder.QUESTION  C.8[1.0 point]A power calibration (calorimetric) of the linear power channel has been performed. In order tomake the front panel meter indication agree with the calculated power:a.the compensating voltage of the linear channel CIC is adjusted.
b.the high voltage of the linear channel CIC is adjusted.
c.the position of the linear channel CIC is adjusted.
d.the full power gain adjust potentiometer is adjusted.QUESTION  C.9[1.0 point]The primary purpose of the safety plate assembly is to:
a.Provide additional support to the reactor grid plate for the use of highly enriched FLIP fuelelements.b.Insure that the maximum reactivity insertion for a pulse cannot be exceeded..
c.Retain a shim-safety rod fuel follower if it becomes detached from its mounting.
d.Retain any debris resulting from an accident which has directly involved the fuel elements.
Section C Facility and Radiation Monitoring SystemsPage 23QUESTION  C.10[1.0 point]Assume the reactor is initially operating in the Steady State mode at a power level of 500 Kw. Which one of the following describes the response of the control rods on the receipt of a scram signal generated by ONLY Safety Amplifier Channel #1?  Assume no operator action.a.Shim-safety rods #1 and #2 will scram, all other rods will remain at their pre-scrampositions.b.Shim-safety rods #1 and #3 will scram, all other rods will remain at their pre-scrampositions.c.All Shim-safety rods and the transient rod will scram, regulating rod will remain at itspre-scram position.d.All six control rods will scram.QUESTION  C.11[1.0 point]Under emergency conditions, the master control panel located in the reception room may beused to:a.scram the reactor.
b.operate the air handling systems.
c.operate the emergency pool fill system.
d.operate the emergency lighting system.QUESTION  C.12[1.0 point]De-energizing the solenoid valve  which controls the supply of air to the pneumatic transient roddrive unit will cause ...a.the piston and the transient rod to drive upward until the piston reaches its upper limit stop.
b.the pneumatic piston to drop to its lower limit and the transient rod to remain in the full downposition.c.the air pressure to remain at an operating level for several hours maintaining the transientrod in its original position.d.the transient rod to remain at its original position and a low pressure alarm to initiate in thecontrol room.
Section C Facility and Radiation Monitoring SystemsPage 24QUESTION  C.13[1.0 point]A reactor scram has occurred from an initial shim-safety rod position of 50.0%. Which one ofthe following correctly describes the indications for shim-safety rod #3 immediately following the scram?  Assume no operator action.a.ENGAGED light off, ROD DOWN light energized, CARR DOWN light off, digital indication0.0%.b.ENGAGED light off, ROD DOWN light energized, CARR DOWN light energized, digitalindication 50.0%.c.ENGAGED light off, ROD DOWN light energized, CARR DOWN light off, digital indication50.0%.d.ENGAGED light energized, ROD DOWN light off, CARR DOWN light off, digital indication0.0%.QUESTION  C.14[2.0 point]Match the nuclear instrumentation channel in column B that satisfies the control function in column A. (the items in column B may be used once, more than once or not at all; and only a single answer may occupy one answer space in column A)    Column A        Column B (control function)  (nuclear instrument) a.Energizes interlock that prevents1. Log power channelstart-ups when less than 2 cpsb.Energizes interlock that prevents2. Linear power channelpulsing operations when greater than 1 kw3. Safety channel(s)c.Inputs reactor scram signal when power is greater than 125%d.Inputs reactor scram signal in the eventof a reactor period of 3 seconds or less Section C Facility and Radiation Monitoring SystemsPage 25QUESTION  C.15[1.0 point]Which ONE of the following is the method you should use (as the console operator) to soundthe ventilation alarm if the solenoid valve was inadvertently left shut in the reception room?a.The normal switch on the control panel should still work.
b.Open a "bypass" valve located in the control room.
c.Open a "bypass" valve located just inside the door leading out of containment.
d.Override the solenoid signal via a switch located in the back of the reactor console.QUESTION  C.16[1.0 point]Which one of the following choices is correct regarding the minimum equipment required toachieve confinement of the reactor building?  Assume no maintenance is in progress.a.Central exhaust fan available.
b.Central exhaust fan in operation and the ventilation system controls in the reception roomavailable.c.The ventilation system and the Radiation Monitoring Channels in operation.
d.Central exhaust fan and the Radiation Monitoring Channels in operation.QUESTION  C.17[1.0 point]Which ONE of the following alarms requires the air handlers to be shut down as part ofimmediate action?a.stack particulate monitor b.stack gas monitor c.building particulate monitor d.building gas monitor Section C Facility and Radiation Monitoring SystemsPage 26QUESTION  C.18[1.0 point]Assuming the reactor is shutdown and all systems in a normal line-up, which one of thefollowing pressures at the primary pump would indicate a full reactor pool?A.47 psig B.42 psig C.33 psig D.15 psigQUESTION  C.19[1.0 point]Thermocouples in the instrumented fuel element measure temperature at the:
a.interior surface of the cladding.
b.center of the zirconium rod.
c.outer surface of the fuel.
d.interior of the fuel.
Answer KeyA.1aREF:Reactor Training Manual - Core Excess and Shutdown Margin.A.2aREF:Reactor Training Manual -
Cross Section. A.3dREF:Reactor Training Manual - Introduction To Nuclear PhysicsA.4.cREF:NSCR SAR, CHAP II, IVA.5cREF:Reactor Training Manual - ReactivityA.6aREF:Standard NRC questionA.7cREF:P = P 0 e t/  ->  = t/ln(P/P
: 0)  = 60/ln (195/100) = 60/ln(1.95) = 89.84  90 sec.A.8bREF:Reactor Training Manual - Reactor Physics and KineticsA.9cREF:Reactor Training Manual - Neutron Life CycleA.10bREF:Reactor Training Manual - ReactivityA.11cREF:Glasstone, 1958, CHAP 5,  LAMARSH, 1983, CHP2.8A.12bREF:Glasstone, 1958, CHAP 14A.13dREF:Reactor Training Manual - Introduction to Nuclear PhysicsA.14aREF:Glasstone and Sesonske, Third Ed. § 1.45A.15bREF:License Amendment Submittal, 7/15/96, pp 23A.16aREF:Reactor Training Manual - Reactor Physics and KineticsA.17bREF:Burn, Introduction to Nuclear Reactor Operations Answer KeyA.18.aREF:Reactor Training Manual - Reactor Physics and KineticsA.19cREF:LaMarsh, pgs 318 - 320A.20. aREF:Q=mc(Tfin-Tini) where: m=106,000 gal.x 8lbm/gal=848,000 lbm; c=1 BTU/F-lbm;Tfin=93 and Tini=90. Q=848,000 lbmx1BTU/F-lbmx1.5F=1.0272E6 BTU/hr x 2.93E-4= 373Kw ]
Answer Key DR X DR X X DR DRXXftXft 1 2 2 2 1 22 2 1 22222 2000 5140020===x==B.1cREF:Reactor Training Manual - 10CFR20B.2dREF:Reactor Training Manual - Ionizing RadiationB.3a, 4;b, 2;c, 1;d, 3REF:Reactor Training Manual -
Health PhysicsB.4bREF:10CFR50.54(y).B.5bREF:Technical Specifications, Section 3.2.3.B.6cREF: SOP I & 10 CFR 50.59B.7aREF:10 CFR 20.1003 DefinitionsB.8bREF:SOP II, REACTOR OPERATIONS, C.1.B.9c REF:B.10dREF:SOP II-G Step 1  -  SOP II-I Step 1,a  -  SOP II-E Step g  - SOP II-JB.11cREF:T.S. 3.1.1B.12aREF:SOP II-D Step 6B.13c REF:Reactivity inserted ($1.6 (shim) + $0.4 (reg) = $2.0SOP II-N, TS 6.5.2 require shutdown and NSC Director approval for restart. B.14cREF:Emergency Classification Guide, pg. 2B.15bREF:10CFR55.53(f)(2))
Answer KeyB.16d REF:TS 3.2.2, Table 1 B.17bREF:Emergency Preparedness Plan Section 6.0B.18cREF:Emergency Classification GuideB.19dREF:SOP IX § B Step f Answer KeyC.1bREF:SOP IV-E; SAR pg. 87C.2dREF:SOP II-C, p. 2.C.3aREF:SAR p. 89, and  SOP IV F p.2C.4cREF:SAR, p. 112.C.5cREF:SAR, p. 79.C.6aREF:SOP III-CC.7dREF:SAR p.38,  SOP II-E step 4C.8dREF:SOP II-J; Step 4.cC.9cREF:SAR, p. 14.C.10cREF:SAR, Figure 7-3.C.11bREF:SAR, page 76. C.12 bREF:SAR p.38C.13cREF:SAR, pp. 26-29.C.14a. 1b. 1c. 3d. 1REF:SAR pp 91-93C.15bREF:SOP III-RC.16bREF:TS 3.3.2.
Answer KeyC.17aREF:SOP VII-A4.c.2C.18dREF:SOP IX-E-1 p. 2C.19dREF:SAR, p 18.}}

Latest revision as of 18:18, 13 March 2020

Inititial Examination Report, No. 50-128-OL-07-01, Texas a & M University Reactor
ML070880029
Person / Time
Site: 05000128
Issue date: 04/03/2007
From: Johnny Eads
NRC/NRR/ADRA/DPR/PRTB
To: Maldanado T
Texas A&M Univ
Eads J, NRR/ADRA/DPR/PRTB, 415-1471
Shared Package
ML063470057 List:
References
50-128/OL-07-01 50-128/OL-07-01
Download: ML070880029 (38)


Text

April 3, 2007 Dr. Theresa A. Maldonado, Deputy Director Texas Engineering Experiment Station Texas A&M University 1095 Nuclear Science Center College Station, TX 77843-3575

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-128/OL-07-01, TEXAS A&M UNIVERSITY

Dear Dr. Maldonado:

During the week of February 26, 2006, the NRC administered an operator licensing examination at your Texas A&M University reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.

Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.

The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Patrick Isaac at 301-415-1019.

Sincerely,

/RA/ Michael J. Case for Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-128

Enclosures:

1. Initial Examination Report No. 50-128/OL-07-01
2. Facility comments with NRC resolution
3. Examination and answer key (RO/SRO) cc w/enclosures:

Please see next page

Texas A&M University Docket No. 50-128 cc:

Mayor, City of College Station P.O. Box Drawer 9960 College Station, TX 77840-3575 Governors Budget and Planning Office P.O. Box 13561 Austin, TX 78711 Texas A&M University System ATTN: Dr. Warren D. Reece, Director Nuclear Science Center Texas Engineering Experiment Station F. E. Box 89, M/S 3575 College Station, Texas 77843 Texas A&M University System ATTN: Jim Remlinger, Associate Director Nuclear Science Center Texas Engineering Experiment Station F. E. Box 89, M/S 3575 College Station, Texas 77843 Radiation Program Officer Bureau of Radiation Control Dept. Of State Health Services Division for Regulatory Services 1100 West 49th Street, MC 2828 Austin, TX 78756-3189 Susan M. Jablonski Technical Advisor Office of Permitting, Remediation & Registration Texas Commission on Environmental Quality P.O. Box 13087, MS 122 Austin, TX 78711-3087 Test, Research and Training Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611

Dr. Theresa A. Maldonado, Deputy Director April 3, 2007 Texas Engineering Experiment Station Texas A&M University 1095 Nuclear Science Center College Station, TX 77843-3575

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-128/OL-07-01, TEXAS A&M UNIVERSITY

Dear Dr. Maldonado:

During the week of February 26, 2006, the NRC administered an operator licensing examination at your Texas A&M University reactor. The examination was conducted according to NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.

Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with 10 CFR 2.390 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.

The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Patrick Isaac at 301-415-1019.

Sincerely,

/RA/ Michael J. Case for Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-128

Enclosures:

1. Initial Examination Report No. 50-128/OL-07-01
2. Facility comments with NRC resolution
3. Examination and answer key (RO/SRO) cc w/enclosures:

Please see next page DISTRIBUTION:

PUBLIC PRTB r/f JEads Facility File EBarnhill (O6-F2)

ADAMS ACCESSION #: ML070880029 TEMPLATE #: NRR-074 PACKAGE ACCESSION #: ML063470057 OFFICE PRTB:CE IOLB:LA PRTB:BC NAME PIsaac:cah EBarnhill JEads/MCase for DATE 03/29/2007 04/02/2007 004/03/2007 OFFICIAL RECORD COPY

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.: 50-128/OL-07-01 FACILITY DOCKET NO.: 50-128 FACILITY LICENSE NO.: R-76 FACILITY: Texas A&M University EXAMINATION DATES: 02/27/2007 - 03/01/2007 EXAMINER: Patrick Isaac, Chief Examiner SUBMITTED BY: /RA/ 03/26/2007 Patrick Isaac, Chief Examiner Date

SUMMARY

During the week of February 26, 2007, NRC administered Operator Licensing examinations to one Reactor Operator (RO) and two Senior Operator Upgrade (SROU) applicants. All the applicants passed the examinations.

ENCLOSURE 1

REPORT DETAILS

1. Examiner:

Patrick Isaac, Chief Examiner

2. Results:

RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 1/0 N/A 1/0 Operating Tests 1/0 2/0 3/0 Overall 1/0 2/0 3/0

3. Exit Meeting:

Personnel attending:

John Hernandez, Reactor Supervisor Patrick Isaac, NRC The licensee commented on a fair and well balanced examination. There were no generic concerns raised by the examiner.

NRC RESOLUTIONS - WRITTEN EXAMINATION Facility Comment B.8:

... the answer to question B.8 is incorrect.

The examination key states that the correct answer is c. The reference to the answer is SOP II, Reactor Operations, C.1. The SOP goes on to state that the Director may make changes to the minimum staff requirements provided the changes satisfy the requirements of the Technical Specifications.

On April 24, 2003, the Director initiated such a change allowing the requirement for the Duty HP to be waived provided that other conditions are met. This change is currently in effect and is practiced daily at the TAMU Nuclear Science Center. Therefore, answer c is no longer valid for the NSC.

Answer b is correct. The reference for this answer is Technical Specification 4.3.2.a.

NRC Resolution B.8:

Comment accepted. The answer key will be modified to accept option "b" as correct.

ENCLOSURE 2

U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR INITIAL LICENSE EXAMINATION FACILITY: TEXAS A&M REACTOR TYPE: TRIGA DATE ADMINISTERED: 2/27/2007 CANDIDATE:

INSTRUCTIONS TO CANDIDATE:

Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in paren-theses for each question. A 70%

overall is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.

% OF CATEGORY  % OF CANDIDATE'S CATEGORY VALUE TOTAL SCORE VALUE CATEGORY 20.00 33.3 A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS 20.00 33.3 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00 33.3 C. PLANT AND RADIATION MONITORING SYSTEMS FINAL GRADE

% TOTALS ALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NOR RECEIVED AID.

CANDIDATE'S SIGNATURE ENCLOSURE 3

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 2 ANSWER SHEET Multiple Choice (Circle or X your choice)

If you change your answer, write your selection in the blank.

MULTIPLE CHOICE 001 a b c d 002 a b c d 003 a b c d 004 a b c d 005 a b c d 006 a b c d 007 a b c d 008 a b c d 009 a b c d 010 a b c d 011 a b c d 012 a b c d 013 a b c d 014 a b c d 015 a b c d 016 a b c d 017 a b c d 018 a b c d 019 a b c d 020 a b c d

(***** END OF CATEGORY A *****)

Section B Normal, Emergency and Radiological Control Procedures Page 3 ANSWER SHEET Multiple Choice (Circle or X your choice)

If you change your answer, write your selection in the blank.

MULTIPLE CHOICE 001 a b c d 002 a b c d 003 a b c d 004 a b c d 005 a b c d 006 a b c d 007 a b c d 008 a b c d 009 a b c d 010 a b c d 011 a b c d 012 a b c d 013 a b c d 014 a b c d 015 a b c d 016 a b c d 017 a b c d 018 a b c d 019 a b c d

(***** END OF CATEGORY B *****)

Section C Facility and Radiation Monitoring Systems Page 4 ANSWER SHEET Multiple Choice (Circle or X your choice)

If you change your answer, write your selection in the blank.

MULTIPLE CHOICE 001 a b c d 002 a b c d 003 a b c d 004 a b c d 005 a b c d 006 a b c d 007 a b c d 008 a b c d 009 a b c d 010 a b c d 011 a b c d 012 a b c d 013 a b c d 014 a b c d 015 a b c d 016 a b c d 017 a b c d 018 a b c d 019 a b c d

(********** END OF EXAMINATION **********)

NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.
3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
4. Use black ink or dark pencil only to facilitate legible reproductions.
5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet.
6. Fill in the date on the cover sheet of the examination (if necessary).
7. Print your name in the upper right-hand corner of the first page of each section of your answer sheets.
8. The point value for each question is indicated in parentheses after the question.
9. Partial credit will NOT be given.
10. If the intent of a question is unclear, ask questions of the examiner only.
11. When you are done and have turned in your examination, leave the examination area as defined by the examiner.

EQUATION SHEET C C C C Q = m cp T = Q = m h C

Q = UA T SCR = S/(1-Keff)

CR1 (1-Keff)1 = CR2 (1-Keff)2 26.06 (eff) (1-Keff)0 SUR =))))))))))))) M = ))))))))))

( - ) (1-Keff)1 SUR = 26.06/ M = 1/(1-Keff) = CR1/CR0 P = P0 10SUR(t) SDM = (1-Keff)/Keff C

P = P0 e(t/) Pwr = W f m (1-)

P = )))))))) Po R* = 1 x 10-5 seconds

= (R*/) + [(-)/eff] = R*/(-)

= (Keff-1)/Keff eff = 0.1 seconds-1

= Keff/Keff 0.693 T1/2 = ))))))

DR1D12 = DR2D22 DR = DRoe-t 6CiE(n)

DR = ))))))))

R2 1 Curie = 3.7x1010 dps 1 kg = 2.21 lbm 1 hp = 2.54x103 BTU/hr 1 Mw = 3.41x106 BTU/hr 1 BTU = 778 ft-lbf EF = 9/5EC + 32 1 gal H2O . 8 lbm EC = 5/9 (EF - 32)

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 7 QUESTION A.1 [1.0 point]

Core excess reactivity (ex) changes with

a. fuel element burnup
b. control rod height
c. neutron energy level
d. reactor power level QUESTION A.2 [1.0 point]

Which ONE of the following is the definition of the term Cross-Section?

a. The probability that a neutron will be captured by a nucleus.
b. The most likely energy at which a charge particle will be captured.
c. The length a charged particle travels past the nucleus before being captured.
d. The area of the nucleus including the electron cloud.

QUESTION A.3 [1.0 point]

A reactor startup is in progress. Each control rod withdrawal is inserting exactly EQUAL amounts of reactivity. Select the EXPECTED neutron population and count rate response as "Keff" approaches 1.0.

The change in neutron population per reactivity insertion is:

a. SMALLER, and it takes LESS time to reach a new equilibrium count rate
b. LARGER, and it takes LESS time to reach a new equilibrium count rate.
c. SMALLER, and it takes MORE time to reach a new equilibrium count rate.
d. LARGER, and it takes MORE time to reach a new equilibrium count rate.

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 8 QUESTION A.4 [1.0 point]

One of the conservative features of the NSCR :

a. Stems from the advantage of a deep reactor pool and therefore colder water.
b. Can be observed that as the reactor ages its pulsing power peaks are reduced.
c. Is the presence of Erbium -167 which acts as a resonant neutron absorber.
d. is that peak axial power in core is near the bottom where water is the coldest.

QUESTION A.5 [1.0 point]

The term reactivity may be described as

a. a measure of the cores fuel depletion.
b. negative when Keff is greater than 1.0.
c. a measure of the cores deviation from criticality.
d. equal to $.50 when the reactor is prompt critical.

QUESTION A.6 [1.0 point]

The table provided lists data taken during a core loading. Estimate the number of fuel elements needed to go critical.

a. 24 Count Rate Number for Fuel Elements
b. 27 842 2
c. 30 886 7 1052 12
d. 38 1296 17 4210 22

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 9 QUESTION A.7 [1.0 point]

During a startup you increase reactor power from 100 watts to 195 watts in a minute. Which ONE of the following is reactor period?

a. 30 seconds.
b. 60 seconds.
c. 90 seconds.
d. 120 seconds.

QUESTION A.8 [1.0 point]

The reactor has just been started up and has been at 100% power for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. The Reactor Operator notes that several small control rod withdrawals are required to maintain power at 100%. Which of the following is the reason for the rod withdrawals?

a. Fuel temperatures are decreasing.
b. Xenon is building in to equilibrium concentration.
c. Pool water temperatures are decreasing.
d. Samarium is burning out from equilibrium concentration.

QUESTION A.9 [1.0 point]

The Fast Fission Factor () is defined as The ratio of the number of neutrons produced by

a. fast fission to the number produced by thermal fission.
b. thermal fission to the number produced by fast fission.
c. fast and thermal fission to the number produced by thermal fission.
d. fast fission to the number produced by fast and thermal fission.

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 10 QUESTION A.10 [1.0 point]

Given the data in the table to the right, which ONE of the following is the closest to the half-life of the material?

TIME ACTIVITY

a. 11 minutes 0 minutes 2400 cps
b. 22 minutes 10 minutes 1757 cps 20 minutes 1286 cps
c. 44 minutes 30 minutes 941 cps
d. 51 minutes 60 minutes 369 cps QUESTION A.11 [1.0 point]

The amount of radioactivity in any material can be determined by:

a. Measuring the dose coming from it using an accurate radiation detector.
b. Taking the results of a. above and multiplying by (4 x pi) to account for geometry.
c. Measuring the total number of radioactive emissions given off over time.
d. First figure out c. above, then multiply the results by the correct quality factor.

QUESTION A.12 [1.0 point]

An experienced reactor operator understands that:

a. The more neutrons multiply during startup the lower the rods are at critical.
b. There is no fixed relationship between neutron level and criticality.
c. Neutron multiplication during startup is just neutrons getting lost at a slower rate.
d. Without the Sb-Be source the reactor would not go critical.

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 11 QUESTION A.13 [1.0 point]

The reactor has been at 100% power for several hours when a reactor scram occurs. All systems have operated as designed, no experiments have been changed, and no fuel has been removed from the reactor. Several hours after the reactor scram, indicated reactor power will stabilize due to:

a. continuing decay of the shortest-lived delayed neutron precursor.
b. the decay of nuclear instrumentation compensation voltage at low power levels.
c. reaching the nuclear instrumentation minimum detectable level.
d. the continuing subcritical multiplication of source neutrons.

QUESTION A.14 [1.0 point]

A fissile material is one which will fission upon the absorption of a THERMAL neutron. Which ONE of following listed isotopes is not a fissile material?

a. Th232
b. U233
c. U235
d. Pu239 QUESTION A.15 [1.0 point]

The NSCR operates on the bottom of a 30 foot deep pool filled with 106, 000 gallons of water:

a. Providing a large static head forcing flow up through the reactor.
b. Permitting greater margin to boiling because of the higher static pressure.
c. Creating a thermal heat sink separated from the core by greater distance.
d. Allowing a more even distribution of BTUs in the reactor core.

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 12 QUESTION A.16 [1.0 point]

The reactor is operating at 100 KW. The reactor operator withdraws the Regulating Rod allowing power to increase. The operator then inserts the same rod to its original position, decreasing power. In comparison to the rod withdrawal, the period due to the rod insertion will be

a. longer due to long lived delayed neutron precursors.
b. shorter due to long lived delayed neutron precursors.
c. same due to equal amounts of reactivity being added.
d. same due to equal reactivity rates from the rod.

QUESTION A.17 [1.0 point]

When a reactor is scrammed, the xenon population starts to increase. This occurs primarily because:

a. delayed neutrons are continuing to be produced and cause fissions, resulting in xenon production.
b. the half-life for the decay of I-135 is shorter than the half-life for the decay of Xe-135.
c. Xe-135 is stable and does not decay.
d. xenon burnout does not occur due to the low neutron population.

QUESTION A.18 [1.0 point]

In order to make the maximum use of the NSCR reactor core:

a. Graphite reflectors are kept near the periphery edges.
b. Control rods are located in the lower flux areas.
c. Two rod bundles are used next to flux traps on the core edge.

d., Flux near the core edge is kept lower than in the center to avoid losses.

Section A: L Theory, Thermodynamics & Facility Operating Characteristics Page 13 QUESTION A.19 [1.0 point]

Identify the PRINCIPAL source of heat in the reactor after shutdown?

a. Stored energy from the reactor and core materials
b. Spontaneous fission within the core
c. Decay of fission products
d. Cosmic radiation causing fission QUESTION A.20 [1.0 point]

Assume that the NSCR pool contains 106, 000 gallons at 90 degrees F and it heats up to 93 degrees F in two hours at indicated 400Kw. Assume no heat is removed from the pool. Based on your calculation results you should recommend to the SRO:

a. Make adjustment to correct the linear power channel indication.
b. Add more ice to the bath and wait two more hours.
c. Lower the reactor power to the steady state power calculated.
d. Maintain the power and wait for the ice bath to melt some more.

Section B Normal, Emergency and Radiological Control Procedures Page 14 QUESTION B.1 [1.0 point]

An accessible area within the facility has general radiation levels of 325 mrem/hour. What would be the EXPECTED posting for this area?

a. "Caution, Very High Radiation Area"
b. "Danger, Airborne Radioactivity Area"
c. "Danger, High Radiation Area"
d. "Caution, Radiation Area" QUESTION B.2 [1.0 point]

While working on an experiment, you receive the following radiation doses: 100 mrem (),

25 mrem (), and 5 mrem (thermal neutrons). Which ONE of the following is your total dose?

a. 175 mrem
b. 155 mrem
c. 145 mrem
d. 130 mrem QUESTION B.3 [2.0 points, 1/2 each]

Match type of radiation (1 thru 4) with the proper penetrating power (a thru d)

a. Gamma 1. Stopped by thin sheet of paper
b. Beta 2. Stopped by thin sheet of metal
c. Alpha 3. Best shielded by light material
d. Neutron 4. Best shielded by dense material

Section B Normal, Emergency and Radiological Control Procedures Page 15 QUESTION B.4 [1.0 point]

10CFR50.54(x) states: A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent. Per 10CFR50.54(y), which one of the following is the minimum level of authorization for this action?

a. Reactor Operator licensed at the facility.
b. Senior Reactor Operator licensed at the facility.
c. Facility Manager (or equivalent at facility).
d. The U.S. Nuclear Regulatory Commission Project Manager QUESTION B.5 [1.0 point]

Which ONE of the following conditions is NOT permissible when the reactor is operating, or about to be operated?

a. The reactivity worth of a single experiment = $1.00.
b. A control rod scram = 1.5 seconds.
c. An excess reactivity = $2.20.
d. The Continuous Air Radiation Monitor is inoperable due to maintenance.

QUESTION B.6 [1.0 point]

As permitted by 10 CFR 50.59, the NSCR may:

a. Modify systems and change the Technical Specifications (TS) if the NRC is notified afterwards.
b. Perform new and little understood experiments when they are for research.
c. Determine the affects of modifications and their impact on TS.
d. Redefine the boundaries of accidents previously analyzed in the Safety Analysis Report (SAR).

Section B Normal, Emergency and Radiological Control Procedures Page 16 QUESTION B.7 [1.0 point]

Which ONE of the following is the 10 CFR 20 definition of TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)?

a. The sum of the deep does equivalent and the committed effective dose equivalent.
b. The dose that your whole body receives from sources outside the body.
c. The sum of the external deep dose and the organ dose.
d. The dose to a specific organ or tissue resulting from an intake of radioactive material.

QUESTION B.8 [1.0 point]

Prior to startup of the reactor there:

a. Must be a licensed member of management available.
b. Has to be a safety system Channel Test on record.
c. Must be a Senior HP or his designated representative in the facility.
d. Will be signatures of all required persons in the Reactor Startup log.

QUESTION B.9 [1.0 point]

A small radioactive source is to be stored in the reactor building. The source reads 2 R/hr at 1 foot. Assuming no shielding is to be used, a Radiation Area barrier would have to be erected from the source at least a distance of approximately:

a. 400 feet
b. 40 feet
c. 20 feet
d. 10 feet QUESTION B.10 [1.0 point]

Which ONE of the following does not require the direct supervision (i.e., presence) of an SRO?

a. Movement of the reactor bridge.
b. Initiation of a pulse.
c. Removal of a control rod.
d. Performance of a power calibration of the Linear Power Channel.

Section B Normal, Emergency and Radiological Control Procedures Page 17 QUESTION B.11 [1.0 point]

The reactor power level shall not exceed 1.3 megawatts under any condition of operation.

This is an example of a:

a. safety limit.
b. limiting safety system setting.
c. limiting condition for operation.
d. surveillance requirement.

QUESTION B.12 [1.0 point]

An experiment with a reactivity worth of $0.20 is to be removed from the core. Prior to performing this operation:

a. reactor power must be less than 600 kW.
b. the reactor must be secured.
c. the reactor must be subcritical by at least $0.40.
d. the reactor must be shutdown.

QUESTION B.13 [1.0 point]

An experimenter transfers a rabbit into the core, requiring the operator to fully insert the regulating rod from its 50% position and to insert shim rod #4 approximately half way from its 70% position to maintain a constant power level. What action is required?

a. Make sure the experiment is secured before completing operation for the day. Notify the NSC Director and the experimenter of the change in experiment status.
b. Withdraw the rods in sequence to restore them to the normal banked position; then remove the experiment from the core. Notify the Health Physicist so that he can monitor the sample movement.
c. Shutdown the reactor and notify the NSC Director. Removal of the experiment and restart of the reactor require NSC Director approval.
d. Shutdown the reactor and evacuate the facility. Re-entry into the facility requires Emergency Director approval. Restart of the reactor requires NRC approval.

Section B Normal, Emergency and Radiological Control Procedures Page 18 QUESTION B.14 [1.0 point]

In accordance with the Emergency Classification Guide, all alarms from the Facility Air Monitor System are classified as Operational Events with the exception of:

a. Stack Particulate Monitor.
b. Building Gas Monitor.
c. Fission Gas Monitor.
d. Stack Gas Monitor.

QUESTION B.15 [1.0 point]

You have not performed the functions of an RO or SRO in the past 6 months. Per the Regulations, prior to resuming activities authorized by your license, how many hours must you complete in that function under the direction of an RO or SRO as appropriate?

a. 4
b. 6
c. 12
d. 40 QUESTION B.16 [1.0 point]

Which ONE of the following reactor safety system channels is required to be operable in BOTH the steady state and pulse modes of operation?

a. Low Power Interlock
b. Log Power 1 KW Interlock
c. Detector Power Supply Failure
d. Fuel Element Temperature

Section B Normal, Emergency and Radiological Control Procedures Page 19 QUESTION B.17 [1.0 point]

The area within the operations boundary for the NSCR (defined as the reactor confinement building).

Which one of the following terms matches the above definition?

a. Emergency Support Center (ESC)
b. Emergency Planning Zone (EPZ)
c. Site Boundary
d. Controlled Access Area (CAA)

QUESTION B.18 [1.0 point]

Which one of the following incidents should be classified as a Notification of Unusual Event?

A. Reactor pool level decreasing at a rate exceeding makeup capacity.

B. Stack gas monitor (Channel 3) is alarming.

C. Report of a tornado which could strike the facility.

D. Personnel injury with radiological complications.

QUESTION B.19 [1.0 point]

Which ONE of the following is a duty of the Reactor Operator (RO) during an emergency which requires a facility evacuation?

a. Verify that rope barriers are in place in the reception room.
b. Verify all persons are accounted for.
c. Verify all doors to the reactor building are closed.
d. Shutdown building air handling and exhaust systems.

Section C Facility and Radiation Monitoring Systems Page 20 QUESTION C.1 [1.0 point]

Mechanical stops prevent inadvertent movement of the NSCR closer than _____ from the irradiation cell window.

a. 12 ft
b. 8 ft
c. 18 inches
d. 3 inches QUESTION C.2 [1.0 point]

According to SOP II-C, "Reactor Startup," which one of the following anticipated power levels would require placing the diffuser system in operation?

a. 5 Kw
b. 10 Kw
c. 100 Kw
d. 500 Kw QUESTION C.3 [1.0 point]

The reactor is operating at max allowed power (per SOP IV-F, Neutron Radiography Beam Port

  1. 4) while located in the stall and positioned against the radiography reflector. Select the statement that describes the indication[s] the operator would see in the control room if the shield door to enter the cave were to be opened.
a. The C-2 device would cause the reactor to trip and an alarm would sound.
b. The C-2 device would sound an alarm in the control room.
c. The beamport No. 4 area radiation monitor would alarm.
d. No indication in the control room.

Section C Facility and Radiation Monitoring Systems Page 21 QUESTION C.4 [1.0 point]

Which one of the following choices correctly describes the capability of the emergency pool fill system, in case of a loss of beam port integrity?

a. Approximately 1200 GPM
b. Approximately 800 GPM.
c. Approximately 400 GPM.
d. Approximately 200 GPM.

QUESTION C.5 [1.0 point]

The emergency exhaust air filter system, installed between the exhaust fan and the exhaust stack, consists of:

a. TWO activated carbon filter banks, and ONE particulate filter bank.
b. TWO activated carbon filter banks, and TWO particulate filter banks.
c. ONE activated carbon filter bank, and TWO particulate filter banks.
d. ONE activated carbon filter bank, and ONE particulate filter bank.

QUESTION C.6 [1.0 point]

The reactor is being operated at 100 kw in the "Servo" mode of control. The compensating voltage to the Linear Power measuring channel suddenly begins to trend down due to a malfunction. Select the statement that describes reactor response with no operator action.

a. The regulating rod would move in, causing power to decrease
b. The regulating rod would move out, causing power to increase
c. All scram capable rods would insert
d. The regulating rod would shift back to manual due to a lower indicated reactor power.

Section C Facility and Radiation Monitoring Systems Page 22 QUESTION C.7 [1.0 point]

Select the statement that describes the method of selecting the amount of reactivity inserted for a pulse.

a. Placement of the mechanical pulse stop on the transient rod mounting plate.
b. Adjustment of the air supply pressure to the pneumatic cylinder.
c. Placement of the mechanical pulse stop on the air supply solenoid valve.
d. Adjustment of the position of the pneumatic cylinder.

QUESTION C.8 [1.0 point]

A power calibration (calorimetric) of the linear power channel has been performed. In order to make the front panel meter indication agree with the calculated power:

a. the compensating voltage of the linear channel CIC is adjusted.
b. the high voltage of the linear channel CIC is adjusted.
c. the position of the linear channel CIC is adjusted.
d. the full power gain adjust potentiometer is adjusted.

QUESTION C.9 [1.0 point]

The primary purpose of the safety plate assembly is to:

a. Provide additional support to the reactor grid plate for the use of highly enriched FLIP fuel elements.
b. Insure that the maximum reactivity insertion for a pulse cannot be exceeded..
c. Retain a shim-safety rod fuel follower if it becomes detached from its mounting.
d. Retain any debris resulting from an accident which has directly involved the fuel elements.

Section C Facility and Radiation Monitoring Systems Page 23 QUESTION C.10 [1.0 point]

Assume the reactor is initially operating in the Steady State mode at a power level of 500 Kw.

Which one of the following describes the response of the control rods on the receipt of a scram signal generated by ONLY Safety Amplifier Channel #1? Assume no operator action.

a. Shim-safety rods #1 and #2 will scram, all other rods will remain at their pre-scram positions.
b. Shim-safety rods #1 and #3 will scram, all other rods will remain at their pre-scram positions.
c. All Shim-safety rods and the transient rod will scram, regulating rod will remain at its pre-scram position.
d. All six control rods will scram.

QUESTION C.11 [1.0 point]

Under emergency conditions, the master control panel located in the reception room may be used to:

a. scram the reactor.
b. operate the air handling systems.
c. operate the emergency pool fill system.
d. operate the emergency lighting system.

QUESTION C.12 [1.0 point]

De-energizing the solenoid valve which controls the supply of air to the pneumatic transient rod drive unit will cause ...

a. the piston and the transient rod to drive upward until the piston reaches its upper limit stop.
b. the pneumatic piston to drop to its lower limit and the transient rod to remain in the full down position.
c. the air pressure to remain at an operating level for several hours maintaining the transient rod in its original position.
d. the transient rod to remain at its original position and a low pressure alarm to initiate in the control room.

Section C Facility and Radiation Monitoring Systems Page 24 QUESTION C.13 [1.0 point]

A reactor scram has occurred from an initial shim-safety rod position of 50.0%. Which one of the following correctly describes the indications for shim-safety rod #3 immediately following the scram? Assume no operator action.

a. ENGAGED light off, ROD DOWN light energized, CARR DOWN light off, digital indication 0.0%.
b. ENGAGED light off, ROD DOWN light energized, CARR DOWN light energized, digital indication 50.0%.
c. ENGAGED light off, ROD DOWN light energized, CARR DOWN light off, digital indication 50.0%.
d. ENGAGED light energized, ROD DOWN light off, CARR DOWN light off, digital indication 0.0%.

QUESTION C.14 [2.0 point]

Match the nuclear instrumentation channel in column B that satisfies the control function in column A. (the items in column B may be used once, more than once or not at all; and only a single answer may occupy one answer space in column A)

Column A Column B (control function) (nuclear instrument)

a. Energizes interlock that prevents 1. Log power channel start-ups when less than 2 cps
b. Energizes interlock that prevents 2. Linear power channel pulsing operations when greater than 1 kw
3. Safety channel(s)
c. Inputs reactor scram signal when power is greater than 125%
d. Inputs reactor scram signal in the event of a reactor period of 3 seconds or less

Section C Facility and Radiation Monitoring Systems Page 25 QUESTION C.15 [1.0 point]

Which ONE of the following is the method you should use (as the console operator) to sound the ventilation alarm if the solenoid valve was inadvertently left shut in the reception room?

a. The normal switch on the control panel should still work.
b. Open a "bypass" valve located in the control room.
c. Open a "bypass" valve located just inside the door leading out of containment.
d. Override the solenoid signal via a switch located in the back of the reactor console.

QUESTION C.16 [1.0 point]

Which one of the following choices is correct regarding the minimum equipment required to achieve confinement of the reactor building? Assume no maintenance is in progress.

a. Central exhaust fan available.
b. Central exhaust fan in operation and the ventilation system controls in the reception room available.
c. The ventilation system and the Radiation Monitoring Channels in operation.
d. Central exhaust fan and the Radiation Monitoring Channels in operation.

QUESTION C.17 [1.0 point]

Which ONE of the following alarms requires the air handlers to be shut down as part of immediate action?

a. stack particulate monitor
b. stack gas monitor
c. building particulate monitor
d. building gas monitor

Section C Facility and Radiation Monitoring Systems Page 26 QUESTION C.18 [1.0 point]

Assuming the reactor is shutdown and all systems in a normal line-up, which one of the following pressures at the primary pump would indicate a full reactor pool?

A. 47 psig B. 42 psig C. 33 psig D. 15 psig QUESTION C.19 [1.0 point]

Thermocouples in the instrumented fuel element measure temperature at the:

a. interior surface of the cladding.
b. center of the zirconium rod.
c. outer surface of the fuel.
d. interior of the fuel.

Answer Key A.1 a REF: Reactor Training Manual - Core Excess and Shutdown Margin.

A.2 a REF: Reactor Training Manual - Cross Section.

A.3 d REF: Reactor Training Manual - Introduction To Nuclear Physics A.4. c REF: NSCR SAR, CHAP II, IV A.5 c REF: Reactor Training Manual - Reactivity A.6 a REF: Standard NRC question A.7 c REF: P = P0 et/ > = t/ln(P/P0) = 60/ln (195/100) = 60/ln(1.95) = 89.84 . 90 sec.

A.8 b REF: Reactor Training Manual - Reactor Physics and Kinetics A.9 c REF: Reactor Training Manual - Neutron Life Cycle A.10 b REF: Reactor Training Manual - Reactivity A.11 c REF: Glasstone, 1958, CHAP 5, LAMARSH, 1983, CHP2.8 A.12 b REF: Glasstone, 1958, CHAP 14 A.13 d REF: Reactor Training Manual - Introduction to Nuclear Physics A.14 a REF: Glasstone and Sesonske, Third Ed. § 1.45 A.15 b REF: License Amendment Submittal, 7/15/96, pp 23 A.16 a REF: Reactor Training Manual - Reactor Physics and Kinetics A.17 b REF: Burn, Introduction to Nuclear Reactor Operations

Answer Key A.18. a REF: Reactor Training Manual - Reactor Physics and Kinetics A.19 c REF: LaMarsh, pgs 318 - 320 A.20. a REF: Q=mc(Tfin-Tini) where: m=106,000 gal.x 8lbm/gal=848,000 lbm; c=1 BTU/EF-lbm; Tfin=93 and Tini=90. Q=848,000 lbmx1BTU/EF-lbmx1.5EF=1.0272E6 BTU/hr x 2.93E-4

= 373Kw ]

Answer Key B.1 c REF: Reactor Training Manual - 10CFR20 B.2 d REF: Reactor Training Manual - Ionizing Radiation B.3 a, 4; b, 2; c, 1; d, 3 REF: Reactor Training Manual - Health Physics B.4 b REF: 10CFR50.54(y).

B.5 b REF: Technical Specifications, Section 3.2.3.

B.6 c REF: SOP I & 10 CFR 50.59 B.7 a REF: 10 CFR 20.1003 Definitions B.8 b REF: SOP II, REACTOR OPERATIONS, C.1.

B.9 c REF:

DR1 DR2 DR1 2 2000 2

= X 22 = X X2 = x 1 = 400 ft 2 X = 20 ft X 2 2 X 12 DR2 5 B.10 d REF: SOP II-G Step 1 - SOP II-I Step 1,a - SOP II-E Step g - SOP II-J B.11 c REF: T.S. 3.1.1 B.12 a REF: SOP II-D Step 6 B.13 c REF: Reactivity inserted ($1.6 (shim) + $0.4 (reg) = $2.0 SOP II-N, TS 6.5.2 require shutdown and NSC Director approval for restart.

B.14 c REF: Emergency Classification Guide, pg. 2 B.15 b REF: 10CFR55.53(f)(2))

Answer Key B.16 d REF: TS 3.2.2, Table 1 B.17 b REF: Emergency Preparedness Plan Section 6.0 B.18 c REF: Emergency Classification Guide B.19 d REF: SOP IX § B Step f

Answer Key C.1 b REF: SOP IV-E; SAR pg. 87 C.2 d REF: SOP II-C, p. 2.

C.3 a REF: SAR p. 89, and SOP IV F p.2 C.4 c REF: SAR, p. 112.

C.5 c REF: SAR, p. 79.

C.6 a REF: SOP III-C C.7 d REF: SAR p.38, SOP II-E step 4 C.8 d REF: SOP II-J; Step 4.c C.9 c REF: SAR, p. 14.

C.10 c REF: SAR, Figure 7-3.

C.11 b REF: SAR, page 76.

C.12 b REF: SAR p.38 C.13 c REF: SAR, pp. 26-29.

C.14 a. 1 b. 1 c. 3 d. 1 REF: SAR pp 91-93 C.15 b REF: SOP III-R C.16 b REF: TS 3.3.2.

Answer Key C.17 a REF: SOP VII-A4.c.2 C.18 d REF: SOP IX-E-1 p. 2 C.19 d REF: SAR, p 18.