5.2    All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mremlyr dose goal established in Table 3-3 of the FSSP.
5.2    All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mremlyr dose goal established in Table 3-3 of the FSSP.
5.3    When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP 1.64 passes FSS.
5.3    When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP 1.64 passes FSS.
5.4    Background was not subtracted from the survey measurements and the
5.4    Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.
                                                                                        '
Elevated Measurement Comparison (EMC) was not employed for this survey unit.


FSS Design # EP 1.64              I Revision # Original                  Page 3 of 3 Survey Unit: 1.64 5.5    Statistical Summary Table 6.0    Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mredyr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.
FSS Design # EP 1.64              I Revision # Original                  Page 3 of 3 Survey Unit: 1.64 5.5    Statistical Summary Table 6.0    Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mredyr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.
Line 55: Line 53:
g!
g!
gcpm        fotaldpm)      [dpm/100cm2)      (dpndlM)cmZ)    (dpmi100an2) ' (dpn1100cmZ)    (dpnllOOan2)    (dpm/IOOcmZ) 0 B
gcpm        fotaldpm)      [dpm/100cm2)      (dpndlM)cmZ)    (dpmi100an2) ' (dpn1100cmZ)    (dpnllOOan2)    (dpm/IOOcmZ) 0 B
              -                    .-                                              -
                 -~                      --                                                  -                      MEAN                0.080
                 -~                      --                                                  -                      MEAN                0.080
                               --                -.                              .                                MEDIAN              0.039
                               --                -.                              .                                MEDIAN              0.039
     .          ,  .                                                                                              -- DEV STD                  0.055
     .          ,  .                                                                                              -- DEV STD                  0.055
                                                                                                                                      ---
     -.                                          !                                                                  MAX                0.275
     -.                                          !                                                                  MAX                0.275
                   -        ~
                   -        ~
Line 75: Line 71:
   &G&d                    q m u m ( ~ j 7 j 47                &          t9-F      PPIPC~            M 5?/&Gy
   &G&d                    q m u m ( ~ j 7 j 47                &          t9-F      PPIPC~            M 5?/&Gy
                                                                                                             / a.ci'i Pipe Interior Radiological Survey Radiological Survey Commenced: Date: /-/fl1-D6              Time:      //f?~-
                                                                                                             / a.ci'i Pipe Interior Radiological Survey Radiological Survey Commenced: Date: /-/fl1-D6              Time:      //f?~-
                                          -
1REFERENCE COPY          1                    Package Page 1 of 3 Attachment 3, Page 1
1REFERENCE COPY          1                    Package Page 1 of 3 Attachment 3, Page 1


Line 100: Line 95:
                                   !I%'&/
                                   !I%'&/
                                 'ib-0.00047 dpmll 00cm2
                                 'ib-0.00047 dpmll 00cm2
                                                       -2
                                                       -2 Pipe Interior Radiological Suwey Form 770 7 Characterization 5-Detector ID #:
                                                        -
Pipe Interior Radiological Suwey Form 770 7 Characterization 5-Detector ID #:
Cal Due Date:
Cal Due Date:
Instrument ID #:
Instrument ID #:
Cal Due Date:
Cal Due Date:
From the Daily Pipe Survey Detector Control Form for the Selected Detector Access Point Area:
From the Daily Pipe Survey Detector Control Form for the Selected Detector Access Point Area:
inal Surve Pipe
inal Surve Pipe LVd- 1 Other
                                                                                        #
LVd- 1 Other
                                                                                       /L--tO-O
                                                                                       /L--tO-O
                                                                                       /t3Y7Js
                                                                                       /t3Y7Js
Line 118: Line 109:
Is the MDCsati,                        No cdffi%t)&kle?        d        i      d  d      ~ua\7vR U M                        1-lo-a4 - S L / $ ~ M
Is the MDCsati,                        No cdffi%t)&kle?        d        i      d  d      ~ua\7vR U M                        1-lo-a4 - S L / $ ~ M
  ~'SJ  4          rd            CWA L      5  &! ITC-g-        PC%@ b          774-        I / S . F ~
  ~'SJ  4          rd            CWA L      5  &! ITC-g-        PC%@ b          774-        I / S . F ~
* C F    &,&<mj
* C F    &,&<mj p m t L 7-1 0 W&-W            1/5 c h m          C?-  /zits(    7  ~
          -'
p m t L 7-1 0 W&-W            1/5 c h m          C?-  /zits(    7  ~
Pipe Interior Radiological Suwey Radiological Survey Commenced: Date:          -          6        Time: 0? 07 Package Page 1 of  I Attachment 3, Page 1
Pipe Interior Radiological Suwey Radiological Survey Commenced: Date:          -          6        Time: 0? 07 Package Page 1 of  I Attachment 3, Page 1



Latest revision as of 08:29, 13 March 2020

Survey Unit Release Record EP 1.64
ML073170358
Person / Time
Site: Plum Brook
Issue date: 10/31/2007
From:
US National Aeronautics & Space Admin (NASA)
To:
NRC/RGN-III/DNMS/DB
References
EP 1.64
Download: ML073170358 (18)


Text

Survey Unit Release Record Design # EP-1.64 Revision # Original Page 1 of 3 Survey Unit #(s) 1.64

1) Embedded Pipe (EP) Survey Unit 1.64 meets the d e f ~ t i o of n embedded pipe for Plum Brook Reactor Facility (PBRF).
2) EP 1.64 is a Class 1, Group 2 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TBD)-06-004.
3) Surveys in EP 1.64 were performed using a scintillation detector optimized to measure gamma energies representative of Co-60. Sample #EP2-2 from Survey Request (SR)-13 was referenced for this decision.
4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (L4W) the Babcock Services Incorporated (BSI)/LVS-002, Work Execution Package (WEP)05-006. Survey instructions described in this Description document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
5) Instrument efficiency determinations are developed in accordance with the BSIILVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.

FSS/Characterktion Manager CS-0911

FSS Design # EP 1.64

-- Revision # Original Page 2 of 3 Survey Unit: 1.64 1.1 The subject pipe system is the 4" header and risers for canal "K" 1.2 EP 1.64 consists of 4" diameter piping that is approximately 60 feet in length.

2.0 Survey Design Information 2.1 EP 1.64 was surveyed IAW Procedure #BSVLVS-002.

2.2 100% of the 4" ID pipe was accessible for survey. The accessible 4" ID pipe was surveyed by static measurement at one foot increments, for a total of 60 survey measurements.

2.3 Surface area for the 4" ID piping is W3 cm2for each foot of piping, corresponding to a total 4" ID piping surface area of 58,373 cm2(5.8 m2) for the entire length of (approximately 60') of 4" piping.

3.0 Survey Unit Measurement LocationsData 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record.

4.0 Survey Unit Investigations/Results 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EPIBuried Pipe (BP) Survey Report provided in Attachment 1.

5.2 All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mremlyr dose goal established in Table 3-3 of the FSSP.

5.3 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP 1.64 passes FSS.

5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.

FSS Design # EP 1.64 I Revision # Original Page 3 of 3 Survey Unit: 1.64 5.5 Statistical Summary Table 6.0 Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mredyr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.

6.1 A review of the survey results has shown that the dose contribution for EP 1.64 to be less than 1 mrendyr. The dose contribution is estimated to be 0.060 mredyr baed on the average of the actual gross counts measured.

7.0 Attachments Attachment 1 - BSI EPBP Survey Report Attachment 2 -Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP 1.64 & Spreadsheet

SECTION 7 ATTACHMENT 1 4 PAGE(S)

BSI EPlBP SURVEY REPORT Sutvey Techdcian(s)

1. ACTWINVALUES NOT BACKGROUND CORRECTED RP Engines I Date

EP 1.64 4" Pipe TBD 06-004 Group 2

EP 1.64 4" Pipe TBD 06-004 Group 2

EP 1.64 4" Pipe TBD 06-004 Group 2

-* I C

E E ncpm Cc.40 activity cod0 activity CS-137 activity EU-152 activity Eu-164 activity Nb44aetivity Ag-108111activity Unity a

g!

gcpm fotaldpm) [dpm/100cm2) (dpndlM)cmZ) (dpmi100an2) ' (dpn1100cmZ) (dpnllOOan2) (dpm/IOOcmZ) 0 B

-~ -- - MEAN 0.080

-- -. . MEDIAN 0.039

. , . -- DEV STD 0.055

-.  ! MAX 0.275

- ~

I I MIN 0.010-

SECTION 7 ATTACHMENT 2 PAGE(S)

Pipe Interior Radiological Survey Form Date: /-/ (7 -0 6 Time: / / 0s-Building: E X Elevation Access Point CfllVkK k System: / &u - OUS.$J=~. Pipe Diameter: /*by Type of Survey Investigation r/

Sled Size Y I' &O&&ld Ginch Detector: /Me/ Detector ID #: LVf-/ -Lo/

Cal Date: / 2-2-0 Cal Due Date: / L ' L ~' 0 6 Instrument: z&)Xrl Instrument ID #: / 3q73 25 Cal Date: / z 8 c Cal Due Date: / . L - z L ~ - Db From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 2 I CPm MDCRs~atio I q CPm Efficiency Factor for Pipe f i ,WO 47 (taken from detector calibration certificate)

E~$M%' 33 77 dPm/100cm2 IS the .MDCSOtic 4 s NO (if no, adjust sample count time and recalculate MDCK,,)

~&~fie&b!e? / ~ / 7 / ~S ~dI L C L ? -/ns:f /

S u ~ u- ~ tm

/

&G&d q m u m ( ~ j 7 j 47 & t9-F PPIPC~ M 5?/&Gy

/ a.ci'i Pipe Interior Radiological Survey Radiological Survey Commenced: Date: /-/fl1-D6 Time: //f?~-

1REFERENCE COPY 1 Package Page 1 of 3 Attachment 3, Page 1

Pipe Interior Radiological Survey Form (Continuation Form)

Package Page & o f g REFERENCECOPY Attachment 3, Page 2

Pipe Interior Radiological Survey Form (Continuation Form)

Package Page 3of 2 REFERENCE COPY Attachment 3, Page 2

Date:

Building:

System: C W T Detector:

Cal Date:

Instrument:

Cal Date:

/-// - 06 Background Value MDCRtatic

~ *K&-I Type of Survey Investigation Sled Size DOC,

_K/(ldJ

/Z-ZO-O.T W 5-0 el i A-LO " i a-Efficiency Factor for Pipe

!&fY?z~~3 3 7 7

'p cpm Time:

Elevation j?ipe Diameter:

/ a / inch

!I%'&/

'ib-0.00047 dpmll 00cm2

-2 Pipe Interior Radiological Suwey Form 770 7 Characterization 5-Detector ID #:

Cal Due Date:

Instrument ID #:

Cal Due Date:

From the Daily Pipe Survey Detector Control Form for the Selected Detector Access Point Area:

inal Surve Pipe LVd- 1 Other

/L--tO-O

/t3Y7Js

/&to - 0 6

&*3niw-L 6

(taken from detector calibration certificate) f b & Ctdcx23 I , (OY

,A (if no, adjust sample count time and recalculate MDCKtsfic)

Is the MDCsati, No cdffi%t)&kle? d i d d ~ua\7vR U M 1-lo-a4 - S L / $ ~ M

~'SJ 4 rd CWA L 5 &! ITC-g- PC%@ b 774- I / S . F ~

  • C F &,&<mj p m t L 7-1 0 W&-W 1/5 c h m C?- /zits( 7 ~

Pipe Interior Radiological Suwey Radiological Survey Commenced: Date: - 6 Time: 0? 07 Package Page 1 of I Attachment 3, Page 1

SECTION 7 ATTACHMENT 3 I PAGE(S)

Page 1 of 1 SECTION 7 ATTACHMENT 4 1 DISC