ML12289A213: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/22/2012
| issue date = 10/22/2012
| title = 2012 LaSalle County Station Initial License Examination Proposed in Plant JPMs
| title = 2012 LaSalle County Station Initial License Examination Proposed in Plant JPMs
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training)
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Place a Standby Battery Charger in Service JPM Number: P-DC-02 Revision Number: 02 Date: 08/31/2012 Developed By:
Exelon Nuclear Job Performance Measure Place a Standby Battery Charger in Service JPM Number:
Instructor       Date Validated By:
P-DC-02   Revision Number:
SME or Instructor     Date Reviewed By:
0 2  Date: 0 8/31/20 1 2  Developed By:
Operations Representative   Date Approved By:
Instructor Date Validated By:
Training Department     Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME or Instructor Date Reviewed By:
 
Operations Representative Date Approved By:
P-DC-02 Rev. 02 Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Training Department Date P-DC-02 Rev. 0 2 Page 2 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                               Rev:
Procedure Rev:   Procedure   Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                               Rev:
________ 10. Verify performance time is accurate
Procedure                               Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date P-DC-02 Rev. 0 2 Page 3 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Revision Record (Summary)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 1. Revision 00, New JPM 2. Revision 0 1, Added Initiating Cue to the Examinee's initial conditions. Updated to revision 7 of LOA
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
-DC-201. 3. Revision 02,  Updated to current Procedures and Template for ILT 11
-1 NRC Exam.


P-DC-02 Rev. 0 2 Page 4 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-DC-02 Rev. 02 Page 3 of 8 Revision Record (Summary)
INITIAL CONDITIONS
: 1. Revision 00,      New JPM
: 2. Revision 01,      Added Initiating Cue to the Examinees initial conditions. Updated to revision 7 of LOA-DC-201.
: 3. Revision 02,      Updated to current Procedures and Template for ILT 11-1 NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
P-DC-02 Rev. 02 Page 4 of 8 INITIAL CONDITIONS
: 1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
: 1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
: 2. The Fire Brigade has extinguished the fire.
: 2. The Fire Brigade has extinguished the fire.
: 3. Battery Charger 2BA has been removed from service.
: 3. Battery Charger 2BA has been removed from service.
: 4. No damage has occurred to MCC
: 4. No damage has occurred to MCC-236X-3 or DC Bus 2B[2DC15E].
-236X-3 or DC Bus 2B[2DC15E].
: 5. The AC feed to 2BA battery charger is open and removed from service. (236X-3, B5)
: 5. The AC feed to 2BA battery charger is open and removed from service. (236X
: 6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.
-3, B5) 6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.
: 7. All levels of the Auxiliary Building are open for personnel access.
: 7. All levels of the Auxiliary Building are open for personnel access.
: 8. You are an extra NSO.
: 8. You are an extra NSO.
: 9. You have a plant radio.
: 9. You have a plant radio.
INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA
INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA-DC-201 starting at Section B.1 step 17.
-DC-201 starting at Section B.1 step 17.
Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.
Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-DC-02 Rev. 0 2 Page 5 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-DC-02 Rev. 02 Page 5 of 8 JPM Start Time:
JPM Start Time:
1 STEP                    ELEMENT                                                                      Comment UNSAT (LOA-DC-201)                                                                               SAT             Number NOTE:               The procedure states, steps 1 and 2 must be done IN ORDER LISTED.
    (LOA-DC-201) STEP      ELEMENT  1      SAT UNSAT Comment Number NOTE: The procedure states, steps 1 and 2 must 1. be done IN ORDER LISTED.
: 1.         At Battery Charger 2BB,               The Examinee verifies the DC       ____  ____    ____
(B.1.17) At Battery Charger 2BB, LOCALLY OPEN the DC Output Breaker.
(B.1.17)    LOCALLY OPEN the DC                   Output Breaker on Battery Output Breaker.                        Charger 2BB is open. (off)
The Examinee verifies the DC Output Breaker on Battery Charger 2BB is open. (off)
CUE:                                 The breaker is in the position you describe.
____ ____ ____ CUE: The breaker is in the position you describe.
: 2.         At Battery Charger 2BB,                The Examinee verifies the AC      ____  ____    ____
: 2. (B.1.17) At Battery Charger 2BB, LOCALLY OPEN the AC Input Breaker.
(B.1.17)     LOCALLY OPEN the AC                   Input Breaker on Battery Input Breaker.                        Charger 2BB is open. (off)
The Examinee verifies the AC Input Breaker on Battery Charger 2BB is open. (off)
CUE:                                 The breaker is in the position you describe.
____ ____ ____ CUE: The breaker is in the position you describe.
  *3.       At MCC-236X-3, LOCALLY                 The Examinee simulates            ____  ____    ____
*3. (B.1.18) At MCC-236X-3, LOCALLY CLOSE AC Feed Breaker A6 for the 2BB Battery Charger.
(B.1.18)    CLOSE AC Feed Breaker A6               closing the A6 Breaker on for the 2BB Battery Charger.           MCC-236X-3.
The Examinee simulates closing the A6 Breaker on MCC-236X-3. ____ ____ ____ CUE: The breaker is in the position you describe.
CUE:                                 The breaker is in the position you describe.
NOTE: The Examinee may verify breaker 2B[2DC15E], 2D (DC Feed Breaker) for Battery Charger 2BA is open. If this occurs, inform the Examinee that breaker 2D is open. *4. (B.1.19) At DC Bus 2B[2DC15E],
NOTE:       The Examinee may verify breaker 2B[2DC15E], 2D (DC Feed Breaker) for Battery Charger 2BA is open. If this occurs, inform the Examinee that breaker 2D is open.
LOCALLY CLOSE DC Feed Breaker 2A for the 2BB Battery Charger.
  *4.       At DC Bus 2B[2DC15E],                 The Examinee simulates            ____  ____    ____
The Examinee simulates closing the 2A Breaker on 2B[2DC15E].
(B.1.19)    LOCALLY CLOSE DC Feed                 closing the 2A Breaker on Breaker 2A for the 2BB                 2B[2DC15E].
____ ____ ____ CUE: The breaker is in the position you describe.
Battery Charger.
NOTE: Steps 5, 6, and 7 are performed locally at Battery Charger 2BB and must*5. be done IN ORDER LISTED.
CUE:                                 The breaker is in the position you describe.
(B.1.20) CLOSE the AC Input Breaker. The Examinee simulates closing the AC Input Breaker on Div 2 Charger 2BB
NOTE:           Steps 5, 6, and 7 are performed locally at Battery Charger 2BB and must be done IN ORDER LISTED.
____ ____ ____ CUE: The breaker is in the position you describe.
  *5.        CLOSE the AC Input                    The Examinee simulates            ____  ____    ____
(B.1.20)     Breaker.                               closing the AC Input Breaker on Div 2 Charger 2BB CUE:                                 The breaker is in the position you describe.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-DC-02 Rev. 0 2 Page 6 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-DC-02 Rev. 02 Page 6 of 8 1
  (LOA-DC-201) STEP      ELEMENT  1      SAT UNSAT Comment Number *6. (B.1.20) DEPRESS the pushbutton and VERIFY FLOAT light energized.
STEP                    ELEMENT                                                                        Comment UNSAT (LOA-DC-201)                                                                                 SAT             Number
The Examinee depresses the pushbutton and verifies Float
  *6.       DEPRESS the pushbutton                The Examinee depresses the          ____  ____    ____
-light energized on Div 2 Charger 2BB
(B.1.20)     and VERIFY FLOAT light                 pushbutton and verifies Float-energized.                            light energized on Div 2 Charger 2BB CUE:                                               The green light is lit.
____ ____ ____ CUE: The green light is lit.
  *7.       CLOSE DC Output Breaker.               The Examinee simulates               ____  ____    ____
*7. (B.1.20) CLOSE DC Output Breaker.
(B.1.20)                                            closing the DC Output Breaker on Div 2 Charger 2BB CUE:                                 The breaker is in the position you describe.
The Examinee simulates closing the DC Output Breaker on Div 2 Charger 2BB ____ ____ ____ CUE: The breaker is in the position you describe.
CUE:         Battery Charger Float voltage has been determined acceptable by another EO.
CUE: Battery Charger Float voltage has been determined acceptable by another E O. The JPM is complete when the Unit 2 NSO is notified that Battery Charger Float Voltage is acceptable.
The JPM is complete when the Unit 2 NSO is notified that Battery Charger Float Voltage is acceptable.
JPM Stop Time:
JPM Stop Time:
P-DC-02 Rev. 0 2 Page 7 of 8 JPM  
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
P-DC-02 Rev. 02 Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:
:        Job Title: EO RO SRO   FS   STA/IA SRO Cert JPM Title: JPM Number: P lace a Standby Battery Charger in Service P-DC-02 Revision Number:
Job
Task Number and Title:
 
02  6.008   K/A Number and Importance:Startup or shutdown a battery charger Suggested Testing Environment:
==Title:==
263000 (DC Electrical Systems) 2.1.30 4.4/4.0 Ability to locate and operate components, including local controls Alternate Path:
EO       RO       SRO         FS         STA/IA           SRO Cert JPM
Yes No SRO Only: Yes No Time Critical:
 
Yes No In-Plant Reference(s):
==Title:==
LOA-DC-201 Unit 2 DC Power System Failure , Rev 14 Actual Testing Environment:
Place a Standby Battery Charger in Service JPM Number:P-DC-02                                             Revision Number: 02 Task Number and
Simulator Control Room In-Plant Other Testing Method:
 
Simulate Perform Estimated Time to Complete:
==Title:==
20EVALUATION
6.008 Startup or shutdown a battery charger K/A Number and Importance:263000 (DC Electrical Systems) 2.1.30 4.4/4.0 Ability to locate and operate components, including local controls Suggested Testing Environment: In-Plant Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical: Yes         No Reference(s): LOA-DC-201 Unit 2 DC Power System Failure, Rev 14 Actual Testing Environment:         Simulator     Control Room           In-Plant     Other Testing Method:         Simulate       Perform Estimated Time to Complete: 20 minutes              Actual Time Used:            minutes EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:     Satisfactory                     Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                 (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                           Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                   Evaluator's Name
 
:   (Print) Evaluator's Signature
Page 8 of 8 INITIAL CONDITIONS
:   Date:
Page 8 of 8   INITIAL CONDITIONS
: 1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
: 1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
: 2. The Fire Brigade has extinguished the fire.
: 2. The Fire Brigade has extinguished the fire.
: 3. Battery Charger 2BA has been removed from service.
: 3. Battery Charger 2BA has been removed from service.
: 4. No damage has occurred to MCC
: 4. No damage has occurred to MCC-236X-3 or DC Bus 2B[2DC15E].
-236X-3 or DC Bus 2B[2DC15E].
: 5. The AC feed to 2BA battery charger is open and removed from service. (236X-3, B5)
: 5. The AC feed to 2BA battery charger is open and removed from service. (236X
: 6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.
-3, B5) 6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.
: 7. All levels of the Auxiliary Building are open for personnel access.
: 7. All levels of the Auxiliary Building are open for personnel access.
: 8. You are an extra NSO.
: 8. You are an extra NSO.
: 9. You have a plant radio.
: 9. You have a plant radio.
INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA-DC-201 starting at Section B.1 step 17.
Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.


INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA
Exelon Nuclear Job Performance Measure Local Emergency Start of 1C VP Chiller JPM Number: P-VP-03 Revision Number: 12 Date: 08/31/2012 Developed By:
-DC-201 starting at Section B.1 step 17.
Instructor        Date Validated By:
Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-VP-03 Rev. 12 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exelon Nuclear Job Performance Measure Local Emergency Start of 1C VP Chiller JPM Number:
P-VP-03  Revision Number: 12  Date: 0 8/31/20 1 2  Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date P-VP-03 Rev. 12 Page 2 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                               Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                               Rev:
________ 10. Verify performance time is accurate
Procedure                               Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date P-VP-03 Rev. 12 Page 3 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Revision Record (Summary)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 1. Revision 07, Reformatted and minor editorial changes.
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 2. Revision 08, Revised task numbers to reflect current task numbers Revised K/A numbers to reflect NUREG 1021 Rev 8 Revised format to meet NTAFT JLOR03 Rev 2 Revised to reflect Rev 6 of LGA
-VP-01 Made JPM specific to Unit 1.
Incorporated comments from TR 98
-2238 3. Revision 09, Minor corrections. Changed estimated time to complete to 10 minutes based on validation. 4. Revision 10, Changed procedure from LGA
-VP-01 to LOP-VP-02. Changed the task based on a new task in the operating matrix. Changed estimate completion time based on year 2000 data.
: 5. Revision 11, Added the initiating cue to the examinee's initial conditions. 6. Revision 12,  Updated to current procedures and templates for ILT 11
-1 NRC Exam


P-VP-03 Rev. 12 Page 4 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-VP-03 Rev. 12 Page 3 of 9 Revision Record (Summary)
Materials 1. The following material is required to be provided to examinee:
: 1. Revision 07,      Reformatted and minor editorial changes.
: a. One copy of LOP
: 2. Revision 08,      Revised task numbers to reflect current task numbers Revised K/A numbers to reflect NUREG 1021 Rev 8 Revised format to meet NTAFT JLOR03 Rev 2 Revised to reflect Rev 6 of LGA-VP-01 Made JPM specific to Unit 1.
-VP-02 (after demonstrating knowledge of location of controlled copy)
Incorporated comments from TR 98-2238
: b. One laser pointer
: 3. Revision 09,      Minor corrections. Changed estimated time to complete to 10 minutes based on validation.
: 4. Revision 10,      Changed procedure from LGA-VP-01 to LOP-VP-02. Changed the task based on a new task in the operating matrix. Changed estimate completion time based on year 2000 data.
: 5. Revision 11,      Added the initiating cue to the examinees initial conditions.
: 6. Revision 12,      Updated to current procedures and templates for ILT 11-1 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-VP-03 Rev. 12 Page 5 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-VP-03 Rev. 12 Page 4 of 9 Materials
INITIAL CONDITIONS You are an extra NSO.
: 1. The following material is required to be provided to examinee:
Unit   scrammed due to high drywell pressure.
: a. One copy of LOP-VP-02 (after demonstrating knowledge of location of controlled copy)
Drywell temperature is 141°F and increasing at approximately 1°F/minute.
: b. One laser pointer SRRS: 3D.105 (when utilized for operator initial or continuing training)
LGA-03 has been entered.
 
LGA-VP-01 is in progress and completed up to and including Step C.9.b.
P-VP-03 Rev. 12 Page 5 of 9 INITIAL CONDITIONS
1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.
* You are an extra NSO.
The SAT is supplying all AC buses.
* Unit             scrammed due to high drywell pressure.
All support systems are operating as expected.
* Drywell temperature is 141°F and increasing at approximately 1°F/minute.
Radiological conditions are at or below normal levels.
* LGA-03 has been entered.
You have a plant radio.
* LGA-VP-01 is in progress and completed up to and including Step C.9.b.
INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02. Inform the Unit NSO when 1C (2C) VP Chiller is restarted.
* 1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.
* The SAT is supplying all AC buses.
* All support systems are operating as expected.
* Radiological conditions are at or below normal levels.
* You have a plant radio.
INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02.
Inform the Unit NSO when 1C (2C) VP Chiller is restarted.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-VP-03 Rev. 12 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-VP-03 Rev. 12 Page 6 of 9 JPM Start Time:
JPM Start Time:
Comme UNSAT STEP                   ELEMENT                              STANDARD (LOP-                                                                             SAT          nt VP-02)
STEP (LOP-VP-02) ELEMENT SAT STANDARD UNSAT Comme nt  1. Obtain copy of LOP
: 1.       Obtain copy of LOP-VP-02               Examinee identifies where     ___  ___    ___
-VP-02 Examinee identifies where copy of LOP
copy of LOP-VP-02 can be obtained.
-VP-02 can be obtained. ___ ___ ___ CUE After examinee identifies where copy of LOP
CUE             After examinee identifies where copy of LOP-VP-02 can be obtained, provide examinee with copy of LOP-VP-02.
-VP-02 can be obtained, provide examinee with copy of LOP
Note             The following steps should be performed at 1C (2C) VP Chiller Unit, 1(2)VP01CC at PRIM. CNMT. WATER CHILLER 1VP14S (2VP14S) (U1 AB 786 L-19) (U2 AB 786 L-19).
-VP-02. Note The following steps should be performed at 1C (2C) VP Chiller Unit, 1(2)VP01CC at PRIM. CNMT. WATER CHILLER 1VP14S (2VP14S) (U1 AB 786' L-19) (U2 AB 786' L
  *2.       DEPRESS RESET push                     Examinee depresses the         ___  ___    ____
-19). *2. (E.2.1) DEPRESS RESET push button Examinee depresses the RESET pushbutton.
button                                RESET pushbutton.
___ ___ ____ CUE The button you identified has been depressed.
(E.2.1)
: 3. (E.2.1) VERIFY no alarms except COMPRESSOR LOW OIL DIFFERENTIAL PRESSURE alarm. Examinee verifies that all alarms except COMPR. LOW OIL DIFFRNT'L PRESS. are clear. ___ ___ ____ CUE Alarm lights are all OFF except for COMPR. LOW OIL DIFFRNT'L PRESS.
CUE                           The button you identified has been depressed.
: 4. (E.2.2) VERIFY Chiller Panel TROUBLE alarm power switch in ON position.
: 3.       VERIFY no alarms except               Examinee verifies that all     ___  ___    ____
Examinee verifies that the Chiller Panel Trouble Alarm power switch in ON.
COMPRESSOR LOW OIL                    alarms except COMPR. LOW (E.2.1)                                            OIL DIFFRNT'L PRESS. are DIFFERENTIAL PRESSURE alarm.                                clear.
___ ___ ____ CUE The switch you have identified is in the ON position.
CUE           Alarm lights are all OFF except for COMPR. LOW OIL DIFFRNT'L PRESS.
: 5. (E.2.3) Notify the NSO of pending chiller start.
: 4.       VERIFY Chiller Panel                  Examinee verifies that the    ___  ___    ____
Examinee notifies the Unit 1 (2) NSO of the pending start of 1 (2) VP01CC, C VP Chiller. ___ ___ ____ CUE As Unit 1 NSO, acknowledge the pending start of 1 (2) VP01CC, C VP Chiller. *6. (E.2.4) DEPRESS START pushbutton.
TROUBLE alarm power                    Chiller Panel Trouble Alarm (E.2.2)                                           power switch in ON.
Examinee depresses START pushbutton.
switch in ON position.
___ ___ ____ CUE The START pushbutton has been depressed.
CUE                       The switch you have identified is in the ON position.
: 5.       Notify the NSO of pending              Examinee notifies the Unit 1  ___  ___    ____
(E.2.3)     chiller start.                         (2) NSO of the pending start of 1 (2) VP01CC, C VP Chiller.
CUE             As Unit 1 NSO, acknowledge the pending start of 1 (2) VP01CC, C VP Chiller.
  *6.       DEPRESS START                          Examinee depresses START      ___  ___    ____
(E.2.4)     pushbutton.                           pushbutton.
CUE                             The START pushbutton has been depressed.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-VP-03 Rev. 12 Page 7 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-VP-03 Rev. 12 Page 7 of 9 Comme UNSAT STEP                   ELEMENT                              STANDARD (LOP-                                                                             SAT          nt VP-02)
STEP (LOP-VP-02) ELEMENT SAT STANDARD UNSAT Comme nt  7. (E.2.5.1) Verify start sequence as follows: Oil pump starts and COMPR OIL PUMP ON indicating light (amber) energized COMPR OIL PUMP ON indicating light verified energized ___ ___ ___ CUE The oil pump started and the COMPR OIL PUMP ON amber indicating light is energized. 8. (E.2.5.2) Verify start sequence as follows: Chiller Compressor Motor 1 (2) VP 14C starts. Chiller Compressor Motor 1 (2) VP 14 C verified running
: 7.     Verify start sequence as                COMPR OIL PUMP ON              ___  ___    ___
___ ___ ___ CUE The 1 (2) VP1 4C Compressor Motor Ammeter indication spikes high and then indicates approximately 400 amps.
follows:                                indicating light verified (E.2.5.1) energized Oil pump starts and COMPR OIL PUMP ON indicating light (amber) energized CUE       The oil pump started and the COMPR OIL PUMP ON amber indicating light is energized.
: 9. (E.2.5.2) Verify start sequence as follows: COMPR MOTOR ON indicating light (amber) is energized COMPR MOTOR ON indicating light verified energized ___ ___ ___ CUE The COMPR MOTOR ON amber indicating light is energized.
: 8.     Verify start sequence as                 Chiller Compressor Motor 1     ___  ___    ___
Note If the Examinee takes action to verify operating parameters per LOP
follows:                                (2) VP14C verified running (E.2.5.2)
-VP-02, inform the examinee that operating parameters are per procedure.
Chiller Compressor Motor 1 (2) VP14C starts.
: 10. NOTIFY the Unit 1 (2) NSO that the 1C (2C) VP Chiller has been restarted.
CUE       The 1 (2) VP14C Compressor Motor Ammeter indication spikes high and then indicates approximately 400 amps.
Examinee notifies the Unit 1 (2) NSO that the 1C (2C) VP Chiller has been restarted.
: 9.     Verify start sequence as                COMPR MOTOR ON                ___  ___    ___
___ ___ ___  JPM Stop Time:
follows:                                indicating light verified (E.2.5.2) energized COMPR MOTOR ON indicating light (amber) is energized CUE       The COMPR MOTOR ON amber indicating light is energized.
Note If the Examinee takes action to verify operating parameters per LOP-VP-02, inform the examinee that operating parameters are per procedure.
: 10.       NOTIFY the Unit 1 (2) NSO             Examinee notifies the Unit 1  ___  ___    ___
that the 1C (2C) VP Chiller           (2) NSO that the 1C (2C) VP has been restarted.                    Chiller has been restarted.
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-VP-03 Rev. 12 Page 8 of 9 JPM  
P-VP-03 Rev. 12 Page 8 of 9 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:
:        Job Title: EO RO SRO   FS   STA/IA SRO Cert JPM Title:
Job
JPM Number:
 
Local start of 1C VP Chiller P-VP-03     Revision Number:
==Title:==
Task Number and Title:
EO         RO       SRO         FS         STA/IA           SRO Cert JPM
12 K/A Number and Importance: 96.006 Given a tripped PCCW chiller, perform an emergency start of that chiller. 295028 (High Drywell Temperature) EA1.03 3.9/3.9 Suggested Testing Environment:
 
Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell Cooling System Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
Local start of 1C VP Chiller JPM Number: P-VP-03                                           Revision Number: 12 Task Number and
Yes No In-Plant Reference(s):
 
LOP-VP-02 Startup Operatio n and shutdown of Primary Containment Chilled Water and Ventilation system, Rev 41 Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Other Testing Method:
96.006 Given a tripped PCCW chiller, perform an emergency start of that chiller.
Simulate Perform Estimated Time to Complete:
K/A Number and Importance: 295028 (High Drywell Temperature) EA1.03 3.9/3.9 Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell Cooling System Suggested Testing Environment: In-Plant Alternate Path:     Yes     No SRO Only:       Yes     No     Time Critical: Yes         No Reference(s): LOP-VP-02 Startup Operation and shutdown of Primary Containment Chilled Water and Ventilation system, Rev 41 Actual Testing Environment:         Simulator       Control Room           In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 11 minutes                Actual Time Used:            minutes EVALUATION  
11 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?           Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:     Satisfactory                       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                   (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                           Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                   Evaluator's Name
:   (Print) Evaluator's Signature
:   Date:
Page 9 of 9  INITIAL CONDITIONS You are an extra NSO.
Unit    scrammed due to high drywell pressure.
Drywell temperature is 141°F and increasing at approximately 1°F/minute.
LGA-03 has been entered.
LGA-VP-01 is in progress and completed up to and including Step C.9.b.
1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.
The SAT is supplying all AC buses.
All support systems are operating as expected.
Radiological conditions are at or below normal levels.
You have a plant radio.
INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02. Inform the Unit NSO when 1C (2C) VP Chiller is restarted.


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 9 INITIAL CONDITIONS
Exelon Nuclear Job Performance Measure Lineup a Fire Hose To 2A TDRFP for Injection Into The RPV JPM Number:
* You are an extra NSO.
P-FP-04 Revision Number:
* Unit              scrammed due to high drywell pressure.
0 0  Date: 0 8/31/20 1 2  Developed By:
* Drywell temperature is 141°F and increasing at approximately 1°F/minute.
Instructor Date Validated By:
* LGA-03 has been entered.
SME or Instructor Date Reviewed By:
* LGA-VP-01 is in progress and completed up to and including Step C.9.b.
Operations Representative Date Approved By:
* 1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.
Training Department Date P-FP-04 Rev. 00 Page 2 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
* The SAT is supplying all AC buses.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
* All support systems are operating as expected.
* Radiological conditions are at or below normal levels.
* You have a plant radio.
INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02.
Inform the Unit NSO when 1C (2C) VP Chiller is restarted.
 
Exelon Nuclear Job Performance Measure Lineup a Fire Hose To 2A TDRFP for Injection Into The RPV JPM Number: P-FP-04 Revision Number: 00 Date: 08/31/2012 Developed By:
Instructor       Date Validated By:
SME or Instructor     Date Reviewed By:
Operations Representative   Date Approved By:
Training Department     Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
P-FP-04 Rev. 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                               Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                               Rev:
________ 10. Verify performance time is accurate
Procedure                               Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date belo w:       SME / Instructor Date       SME / Instructor Date       SME / Instructor Date P-FP-04 Rev. 00 Page 3 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     10. Verify performance time is accurate
Revision Record (Summary)
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 1. Revision 00, New JPM based on bank JPM P-FP-03, Rev. 0.
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Connects FP to the 2A TDRFP rather than the 1A TDRFP
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
. Updated to current template and procedures for ILT 11-1 NRC Exam
 
P-FP-04 Rev. 00 Page 3 of 10 Revision Record (Summary)
: 1. Revision 00,       New JPM based on bank JPM P-FP-03, Rev. 0. Connects FP to the 2A TDRFP rather than the 1A TDRFP. Updated to current template and procedures for ILT 11-1 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-FP-04 Rev. 00 Page 4 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-FP-04 Rev. 00 Page 4 of 10 SETUP INSTRUCTIONS
SETUP INSTRUCTIONS
: 1. Be prepared to provide a copy of pages 1-7 and 34-40 of LGA-FP-01, Alternate Vessel Injection Using the Fire Protection System.
: 1. Be prepared to provide a copy of pages 1-7 and 34-40 of LGA-FP-01, Alternate Vessel Injection Using the Fire Protection System.  
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-FP-04 Rev. 00 Page 5 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-FP-04 Rev. 00 Page 5 of 10 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. A reactor scram has occurred on Unit 2 and all rods are full in.
: 1. A reactor scram has occurred on Unit 2 and all rods are full in.
: 2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
: 2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
: 3. The Unit 2 NSO is coordinating LGA
: 3. The Unit 2 NSO is coordinating LGA-FP-01, Diesel Fire Pump Makeup to the Reactor.
-FP-01, "Diesel Fire Pump Makeup to the Reactor".
: 4. An Operator has just been assigned to perform the in-plant actions to line up Fire Protection to the MDRFP.
: 4. An Operator has just been assigned to perform the in
-plant actions to line up Fire Protection to the MDRFP.
: 5. The 2B TDRFP is OOS with the pump casing removed.
: 5. The 2B TDRFP is OOS with the pump casing removed.
: 6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA
: 6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA-FP-01 at control room panels 2PM03J and 2H13-P601.
-FP-01 at control room panels 2PM03J and 2H13-P601. 7. Fire protection header pressure is normal.
: 7. Fire protection header pressure is normal.
: 8. There is NO fire.
: 8. There is NO fire.
: 9. The Chemical Feed system is out of service.
: 9. The Chemical Feed system is out of service.
: 10. You have a plant radio.
: 10. You have a plant radio.
INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2 A TDRFP IAW LGA
INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2A TDRFP IAW LGA-FP-01 Attachment 2A.
-FP-01 Attachment 2 A. Inform the Unit 2 NSO when the alignment is complete.
Inform the Unit 2 NSO when the alignment is complete.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL step.
* Denotes CRITICAL step.
Tell examinee he may assume all second verifications and associated paperwork is simulated complete as necessary.
Tell examinee he may assume all second verifications and associated paperwork is simulated complete as necessary.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of page
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-FP-04 Rev. 00 Page 6 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-FP-04 Rev. 00 Page 6 of 10 JPM Start Time:
JPM Start Time:
STEP                    ELEMENT                              STANDARD                                  Comment (LGA-FP-01                                                                             SAT   UNSAT Attachment                                                                                              Number 2A)
    (LGA-FP-01 Attachment 2 A) STEP  ELEMENT  STANDARD  SAT UNSAT Comment Number 1. Obtain a copy of LGA
: 1.       Obtain a copy of LGA-FP-01         Examinee simulates obtaining        ____  ____      ____
-FP-01 and an LGA Support Locker Key Examinee simulates obtaining procedure and LGA Support Locker Key
and an LGA Support Locker         procedure and LGA Support Key                                Locker Key CUE:           Provide examinee with the prepared copy of LGA-FP-01 when he/she describes/demonstrates where to get procedure and Support Locker Key.
____ ____ ____ CUE: Provide examinee with the prepared copy of LGA
NOTE:           The Evaluator will act as Safety Person as required.
-FP-01 when he/she describes/demonstrates where to get procedure and Support Locker Key
: 2.       Obtain equipment from the         Examinee simulates obtaining        ____  ____      ____
. NOTE: The Evaluator will act as Safety Person as required.
Main LGA Support Locker           equipment from LGA Support Locker (Unit 2 LGA FP-01 Equipment Bag)
: 2. Obtain equipment from the Main L GA Support Locker Examinee simulates obtaining equipment from LGA Support Locker (Unit 2 LGA FP-01 Equipment Bag)
CUE:           You have obtained the equipment you identified.
____ ____ ____ CUE: You have obtained the equipment you identified.
: 3.       OBTAIN equipment from             Examinee simulates obtaining       ____  ____      ____
: 3. OBTAIN equipment from Local Examinee simulates obtaining equipment from Local LGA Support Locker LGA Support Locker
Local LGA Support Locker           equipment from Local LGA Support Locker CUE:           You have obtained the equipment you identified.
____ ____ ____ CUE: You have obtained the equipment you identified.
    *4.         Remove fire hose from Hose         Examinee simulates removing        ____  ____      ____
*4. (1st Line) Remove fire hose from Hose Station FB451 and install a wye connector Examinee simulates removing fire hose from Hose Station FB451 and installing a wye connector ____ ____ ____ CUE: The fire hose and wye connector are positioned as you describe.
(1st Line)      Station FB451 and install a       fire hose from Hose Station wye connector                      FB451 and installing a wye connector CUE:           The fire hose and wye connector are positioned as you describe.
*5. (2 nd Line) Connect fire station fire hose to one end of wye and run i t into 2A TDRFP Room Examinee simulates connecting fire station fire hose to one end of wye and running it into 2A TDRFP Room CUE: The fire hose and wye connector are positioned as you describe.
  *5.           Connect fire station fire hose     Examinee simulates connecting nd (2 Line)        to one end of wye and run it      fire station fire hose to one end into 2A TDRFP Room                of wye and running it into 2A TDRFP Room CUE:           The fire hose and wye connector are positioned as you describe.
NOTE: The next step of LGA-FP-01 Attachment 2A is N/A because it performs the same action on the 2B TDRFP, which is out of service per initiating cue.
NOTE:           The next step of LGA-FP-01 Attachment 2A is N/A because it performs the same action on the 2B TDRFP, which is out of service per initiating cue.
*6. (4th Line)
    *6.   (In 2A TDRFP Room)                       Examinee simulates installing (4th Line) Install wye connector at end             wye connector at end of fire of fire hose                             hose SRRS: 3D.105 (when utilized for operator initial or continuing training)
(In 2A TDRFP Room)
 
Install wye connector at end of fire hose Examinee simulates installing wye connector at end of fire hose P-FP-04 Rev. 00 Page 7 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)
P-FP-04 Rev. 00 Page 7 of 10 STEP                  ELEMENT                              STANDARD                              Comment (LGA-FP-01                                                                       SAT   UNSAT Attachment                                                                                        Number 2A)
  (LGA-FP-01 Attachment 2 A) STEP  ELEMENT  STANDARD  SAT UNSAT Comment Number *7. (5th Line)
    *7. Connect fire hoses to the             Examinee simulates connecting (5th Line) two ends of this wye                   fire hoses to the two ends of connector.                            this wye connector CUE:       The Fire hose is connected as you describe
Connect fire hoses to the two ends of this wye connector.
    *8. Install FP to 1" converter             Examinee simulates installing (6th Line) on 2FW041A/42A, 2A                     FP to 1" converter on TDRFP Dsch Line                       2FW041A/42A Upstrm/Dwnstr Lo Point Drain CUE:       The converter is installed as you described.
Examinee simulates connecting fire hoses to the two ends of this wye connector CUE: The Fire hose is connected as you describe
    *9. Connect one fire hose to 1"           Examinee simulates connecting (7th Line) converter                              one fire hose to 1" converter CUE:       The Fire hose is connected as you describe
*8. (6th Line)
  *10. Install FP to 3/4" converter           Examinee simulates installing (8th Line) on 2CB022C, A TDRFP                   FP to 3/4" converter on Suct Lo Point Drain Valve              2CB022C CUE:       The converter is installed as you described.
Install FP to 1" converter on 2FW041A/42A, 2A TDRFP Dsch Line Upstrm/Dwnstr Lo Point Drain Examinee simulates installing FP to 1" converter on 2FW041A/42A CUE: The converter is installed as you described.
  *11. Connect other fire hose to             Examinee simulates connecting (9th Line) 3/4" converter                         other fire hose to 3/4" converter CUE:       The Fire hose is connected as you describe
*9. (7th Line)
: 12.       Notify Unit 2 NSO that             The Examinee simulates          ____  ____      ____
Connect one fire hose to 1" converter Examinee simulates connecting one fire hose to 1" converter CUE: The Fire hose is connected as you describe
alignment of FP to 2A               notifying the Unit 2 NSO that TDRFP is complete                  alignment of FP to 2A TDRFP is complete CUE:       As the Unit 2 NSO, acknowledge the report that FP is aligned to the 2A TDRFP.
*10. (8th Line)
: 13.       Complete all required               The Examinee completes or signatures, dates, and             simulates completing all times on Attachment 2A             required signatures, dates, and times on Attachment 2A TERMINATING CUE The JPM is complete when the Unit 2 NSO is notified.
Install FP to 3/4" converter on 2CB022C, A TDRFP Suct Lo Point Drain Valve Examinee simulates installing  FP to 3/4" converter o n 2CB022C   CUE: The converter is installed as you described.
*11. (9th Line)
Connect other fire hose to 3/4" converter Examinee simulates connecting other fire hose to 3/4" converter   CUE: The Fire hose is connected as you describe
: 12. Notify Unit 2 NSO that alignment of FP to 2A TDRFP is complete The Examinee simulates notifying the Unit 2 NSO that alignment of FP to 2A TDRFP is complete
____ ____ ____ CUE: As the Unit 2 NSO, acknowledge the report that FP is aligned to the 2 A TDRFP. 13. Complete all required signatures, dates, and times on Attachment 2A The Examinee completes or simulates completing all required signatures, dates, and times on Attachment 2A   TERMINATING CUE The JPM is complete when the Unit 2 NSO is notified.
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


P-FP-04 Rev. 00 Page 8 of 10 JPM  
P-FP-04 Rev. 00 Page 8 of 10 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:
:        Job Title: EO RO SRO   FS   STA/IA SRO Cert JPM Title:
Job
JPM Number:
 
Lineup a Fire Hose to 2A TDRFP for Injection into the R PV P-FP-0 4  Revision Number:
==Title:==
Task Number and Title:
EO       RO       SRO         FS         STA/IA         SRO Cert JPM
00 K/A Number and Importance:414.0 2 0 Evaluate plant conditions and control RPV water level using FP Suggested Testing Environment:
 
295031 (Reactor Low Water Level) EA1.08 3.8/3.9 Ability to operate and/or monitor the following as they apply to REACTOR LOW WATER LEVEL: Alternate Injection Systems Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
Lineup a Fire Hose to 2A TDRFP for Injection into the RPV JPM Number: P-FP-04                                            Revision Number: 00 Task Number and
Yes No In-Plant Reference(s):
 
LGA-FP-01 Alternate Vessel Injection Using the Fire Protection System, Rev 15 Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Ot her Testing Method:
414.020 Evaluate plant conditions and control RPV water level using FP K/A Number and Importance:295031 (Reactor Low Water Level) EA1.08 3.8/3.9 Ability to operate and/or monitor the following as they apply to REACTOR LOW WATER LEVEL: Alternate Injection Systems Suggested Testing Environment: In-Plant Alternate Path:     Yes     No SRO Only:         Yes     No     Time Critical: Yes       No Reference(s): LGA-FP-01 Alternate Vessel Injection Using the Fire Protection System, Rev 15 Actual Testing Environment:         Simulator       Control Room         In-Plant     Other Testing Method:         Simulate       Perform Estimated Time to Complete: 10 minutes                Actual Time Used:          minutes EVALUATION
Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:     Satisfactory                     Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                 (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                           Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
 
Satisfactory Unsatisfactory Comments:                   Evaluator's Name
Page 9 of 10 KEY
:   (Print) Evaluator's Signature:   Date:
 
Page 9 of 10   KEY Page 10 of 10   INITIAL CONDITIONS
Page 10 of 10 INITIAL CONDITIONS
: 1. A reactor scram has occurred on Unit 2 and all rods are full in.
: 1. A reactor scram has occurred on Unit 2 and all rods are full in.
: 2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
: 2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
: 3. The Unit 2 NSO is coordinating LGA
: 3. The Unit 2 NSO is coordinating LGA-FP-01, Diesel Fire Pump Makeup to the Reactor.
-FP-01, "Diesel Fire Pump Makeup to the Reactor".
: 4. An Operator has just been assigned to perform the in-plant actions to line up Fire Protection to the MDRFP.
: 4. An Operator has just been assigned to perform the in
-plant actions to line up Fire Protection to the MDRFP.
: 5. The 2B TDRFP is OOS with the pump casing removed.
: 5. The 2B TDRFP is OOS with the pump casing removed.
: 6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA
: 6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA-FP-01 at control room panels 2PM03J and 2H13-P601.
-FP-01 at control room panels 2PM03J and 2H13-P601. 7. Fire protection header pressure is normal.
: 7. Fire protection header pressure is normal.
: 8. There is NO fire.
: 8. There is NO fire.
: 9. The Chemical Feed system is out of service.
: 9. The Chemical Feed system is out of service.
: 10. You have a plant radio.
: 10. You have a plant radio.
INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2 A TDRFP IAW LGA
INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2A TDRFP IAW LGA-FP-01 Attachment 2A.
-FP-01 Attachment 2 A. Inform the Unit 2 NSO when the alignment is complete.}}
Inform the Unit 2 NSO when the alignment is complete.}}

Latest revision as of 11:28, 6 February 2020

2012 LaSalle County Station Initial License Examination Proposed in Plant JPMs
ML12289A213
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/2012
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
Download: ML12289A213 (27)


Text

Exelon Nuclear Job Performance Measure Place a Standby Battery Charger in Service JPM Number: P-DC-02 Revision Number: 02 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-DC-02 Rev. 02 Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-DC-02 Rev. 02 Page 3 of 8 Revision Record (Summary)

1. Revision 00, New JPM
2. Revision 01, Added Initiating Cue to the Examinees initial conditions. Updated to revision 7 of LOA-DC-201.
3. Revision 02, Updated to current Procedures and Template for ILT 11-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-DC-02 Rev. 02 Page 4 of 8 INITIAL CONDITIONS

1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
2. The Fire Brigade has extinguished the fire.
3. Battery Charger 2BA has been removed from service.
4. No damage has occurred to MCC-236X-3 or DC Bus 2B[2DC15E].
5. The AC feed to 2BA battery charger is open and removed from service. (236X-3, B5)
6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.
7. All levels of the Auxiliary Building are open for personnel access.
8. You are an extra NSO.
9. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA-DC-201 starting at Section B.1 step 17.

Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-DC-02 Rev. 02 Page 5 of 8 JPM Start Time:

1 STEP ELEMENT Comment UNSAT (LOA-DC-201) SAT Number NOTE: The procedure states, steps 1 and 2 must be done IN ORDER LISTED.

1. At Battery Charger 2BB, The Examinee verifies the DC ____ ____ ____

(B.1.17) LOCALLY OPEN the DC Output Breaker on Battery Output Breaker. Charger 2BB is open. (off)

CUE: The breaker is in the position you describe.

2. At Battery Charger 2BB, The Examinee verifies the AC ____ ____ ____

(B.1.17) LOCALLY OPEN the AC Input Breaker on Battery Input Breaker. Charger 2BB is open. (off)

CUE: The breaker is in the position you describe.

  • 3. At MCC-236X-3, LOCALLY The Examinee simulates ____ ____ ____

(B.1.18) CLOSE AC Feed Breaker A6 closing the A6 Breaker on for the 2BB Battery Charger. MCC-236X-3.

CUE: The breaker is in the position you describe.

NOTE: The Examinee may verify breaker 2B[2DC15E], 2D (DC Feed Breaker) for Battery Charger 2BA is open. If this occurs, inform the Examinee that breaker 2D is open.

  • 4. At DC Bus 2B[2DC15E], The Examinee simulates ____ ____ ____

(B.1.19) LOCALLY CLOSE DC Feed closing the 2A Breaker on Breaker 2A for the 2BB 2B[2DC15E].

Battery Charger.

CUE: The breaker is in the position you describe.

NOTE: Steps 5, 6, and 7 are performed locally at Battery Charger 2BB and must be done IN ORDER LISTED.

  • 5. CLOSE the AC Input The Examinee simulates ____ ____ ____

(B.1.20) Breaker. closing the AC Input Breaker on Div 2 Charger 2BB CUE: The breaker is in the position you describe.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-DC-02 Rev. 02 Page 6 of 8 1

STEP ELEMENT Comment UNSAT (LOA-DC-201) SAT Number

  • 6. DEPRESS the pushbutton The Examinee depresses the ____ ____ ____

(B.1.20) and VERIFY FLOAT light pushbutton and verifies Float-energized. light energized on Div 2 Charger 2BB CUE: The green light is lit.

  • 7. CLOSE DC Output Breaker. The Examinee simulates ____ ____ ____

(B.1.20) closing the DC Output Breaker on Div 2 Charger 2BB CUE: The breaker is in the position you describe.

CUE: Battery Charger Float voltage has been determined acceptable by another EO.

The JPM is complete when the Unit 2 NSO is notified that Battery Charger Float Voltage is acceptable.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-DC-02 Rev. 02 Page 7 of 8 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Place a Standby Battery Charger in Service JPM Number:P-DC-02 Revision Number: 02 Task Number and

Title:

6.008 Startup or shutdown a battery charger K/A Number and Importance:263000 (DC Electrical Systems) 2.1.30 4.4/4.0 Ability to locate and operate components, including local controls Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOA-DC-201 Unit 2 DC Power System Failure, Rev 14 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 8 of 8 INITIAL CONDITIONS

1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
2. The Fire Brigade has extinguished the fire.
3. Battery Charger 2BA has been removed from service.
4. No damage has occurred to MCC-236X-3 or DC Bus 2B[2DC15E].
5. The AC feed to 2BA battery charger is open and removed from service. (236X-3, B5)
6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.
7. All levels of the Auxiliary Building are open for personnel access.
8. You are an extra NSO.
9. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA-DC-201 starting at Section B.1 step 17.

Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.

Exelon Nuclear Job Performance Measure Local Emergency Start of 1C VP Chiller JPM Number: P-VP-03 Revision Number: 12 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 3 of 9 Revision Record (Summary)

1. Revision 07, Reformatted and minor editorial changes.
2. Revision 08, Revised task numbers to reflect current task numbers Revised K/A numbers to reflect NUREG 1021 Rev 8 Revised format to meet NTAFT JLOR03 Rev 2 Revised to reflect Rev 6 of LGA-VP-01 Made JPM specific to Unit 1.

Incorporated comments from TR 98-2238

3. Revision 09, Minor corrections. Changed estimated time to complete to 10 minutes based on validation.
4. Revision 10, Changed procedure from LGA-VP-01 to LOP-VP-02. Changed the task based on a new task in the operating matrix. Changed estimate completion time based on year 2000 data.
5. Revision 11, Added the initiating cue to the examinees initial conditions.
6. Revision 12, Updated to current procedures and templates for ILT 11-1 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 4 of 9 Materials

1. The following material is required to be provided to examinee:
a. One copy of LOP-VP-02 (after demonstrating knowledge of location of controlled copy)
b. One laser pointer SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 5 of 9 INITIAL CONDITIONS

  • You are an extra NSO.
  • Unit scrammed due to high drywell pressure.
  • Drywell temperature is 141°F and increasing at approximately 1°F/minute.
  • LGA-03 has been entered.
  • LGA-VP-01 is in progress and completed up to and including Step C.9.b.
  • 1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.
  • The SAT is supplying all AC buses.
  • All support systems are operating as expected.
  • Radiological conditions are at or below normal levels.
  • You have a plant radio.

INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02.

Inform the Unit NSO when 1C (2C) VP Chiller is restarted.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 6 of 9 JPM Start Time:

Comme UNSAT STEP ELEMENT STANDARD (LOP- SAT nt VP-02)

1. Obtain copy of LOP-VP-02 Examinee identifies where ___ ___ ___

copy of LOP-VP-02 can be obtained.

CUE After examinee identifies where copy of LOP-VP-02 can be obtained, provide examinee with copy of LOP-VP-02.

Note The following steps should be performed at 1C (2C) VP Chiller Unit, 1(2)VP01CC at PRIM. CNMT. WATER CHILLER 1VP14S (2VP14S) (U1 AB 786 L-19) (U2 AB 786 L-19).

  • 2. DEPRESS RESET push Examinee depresses the ___ ___ ____

button RESET pushbutton.

(E.2.1)

CUE The button you identified has been depressed.

3. VERIFY no alarms except Examinee verifies that all ___ ___ ____

COMPRESSOR LOW OIL alarms except COMPR. LOW (E.2.1) OIL DIFFRNT'L PRESS. are DIFFERENTIAL PRESSURE alarm. clear.

CUE Alarm lights are all OFF except for COMPR. LOW OIL DIFFRNT'L PRESS.

4. VERIFY Chiller Panel Examinee verifies that the ___ ___ ____

TROUBLE alarm power Chiller Panel Trouble Alarm (E.2.2) power switch in ON.

switch in ON position.

CUE The switch you have identified is in the ON position.

5. Notify the NSO of pending Examinee notifies the Unit 1 ___ ___ ____

(E.2.3) chiller start. (2) NSO of the pending start of 1 (2) VP01CC, C VP Chiller.

CUE As Unit 1 NSO, acknowledge the pending start of 1 (2) VP01CC, C VP Chiller.

  • 6. DEPRESS START Examinee depresses START ___ ___ ____

(E.2.4) pushbutton. pushbutton.

CUE The START pushbutton has been depressed.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 7 of 9 Comme UNSAT STEP ELEMENT STANDARD (LOP- SAT nt VP-02)

7. Verify start sequence as COMPR OIL PUMP ON ___ ___ ___

follows: indicating light verified (E.2.5.1) energized Oil pump starts and COMPR OIL PUMP ON indicating light (amber) energized CUE The oil pump started and the COMPR OIL PUMP ON amber indicating light is energized.

8. Verify start sequence as Chiller Compressor Motor 1 ___ ___ ___

follows: (2) VP14C verified running (E.2.5.2)

Chiller Compressor Motor 1 (2) VP14C starts.

CUE The 1 (2) VP14C Compressor Motor Ammeter indication spikes high and then indicates approximately 400 amps.

9. Verify start sequence as COMPR MOTOR ON ___ ___ ___

follows: indicating light verified (E.2.5.2) energized COMPR MOTOR ON indicating light (amber) is energized CUE The COMPR MOTOR ON amber indicating light is energized.

Note If the Examinee takes action to verify operating parameters per LOP-VP-02, inform the examinee that operating parameters are per procedure.

10. NOTIFY the Unit 1 (2) NSO Examinee notifies the Unit 1 ___ ___ ___

that the 1C (2C) VP Chiller (2) NSO that the 1C (2C) VP has been restarted. Chiller has been restarted.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-VP-03 Rev. 12 Page 8 of 9 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local start of 1C VP Chiller JPM Number: P-VP-03 Revision Number: 12 Task Number and

Title:

96.006 Given a tripped PCCW chiller, perform an emergency start of that chiller.

K/A Number and Importance: 295028 (High Drywell Temperature) EA1.03 3.9/3.9 Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell Cooling System Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LOP-VP-02 Startup Operation and shutdown of Primary Containment Chilled Water and Ventilation system, Rev 41 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 11 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 9 INITIAL CONDITIONS

  • You are an extra NSO.
  • Unit scrammed due to high drywell pressure.
  • Drywell temperature is 141°F and increasing at approximately 1°F/minute.
  • LGA-03 has been entered.
  • LGA-VP-01 is in progress and completed up to and including Step C.9.b.
  • 1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.
  • The SAT is supplying all AC buses.
  • All support systems are operating as expected.
  • Radiological conditions are at or below normal levels.
  • You have a plant radio.

INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02.

Inform the Unit NSO when 1C (2C) VP Chiller is restarted.

Exelon Nuclear Job Performance Measure Lineup a Fire Hose To 2A TDRFP for Injection Into The RPV JPM Number: P-FP-04 Revision Number: 00 Date: 08/31/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 3 of 10 Revision Record (Summary)

1. Revision 00, New JPM based on bank JPM P-FP-03, Rev. 0. Connects FP to the 2A TDRFP rather than the 1A TDRFP. Updated to current template and procedures for ILT 11-1 NRC Exam SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 4 of 10 SETUP INSTRUCTIONS

1. Be prepared to provide a copy of pages 1-7 and 34-40 of LGA-FP-01, Alternate Vessel Injection Using the Fire Protection System.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 5 of 10 INITIAL CONDITIONS

1. A reactor scram has occurred on Unit 2 and all rods are full in.
2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
3. The Unit 2 NSO is coordinating LGA-FP-01, Diesel Fire Pump Makeup to the Reactor.
4. An Operator has just been assigned to perform the in-plant actions to line up Fire Protection to the MDRFP.
5. The 2B TDRFP is OOS with the pump casing removed.
6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA-FP-01 at control room panels 2PM03J and 2H13-P601.
7. Fire protection header pressure is normal.
8. There is NO fire.
9. The Chemical Feed system is out of service.
10. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2A TDRFP IAW LGA-FP-01 Attachment 2A.

Inform the Unit 2 NSO when the alignment is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL step.

Tell examinee he may assume all second verifications and associated paperwork is simulated complete as necessary.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 6 of 10 JPM Start Time:

STEP ELEMENT STANDARD Comment (LGA-FP-01 SAT UNSAT Attachment Number 2A)

1. Obtain a copy of LGA-FP-01 Examinee simulates obtaining ____ ____ ____

and an LGA Support Locker procedure and LGA Support Key Locker Key CUE: Provide examinee with the prepared copy of LGA-FP-01 when he/she describes/demonstrates where to get procedure and Support Locker Key.

NOTE: The Evaluator will act as Safety Person as required.

2. Obtain equipment from the Examinee simulates obtaining ____ ____ ____

Main LGA Support Locker equipment from LGA Support Locker (Unit 2 LGA FP-01 Equipment Bag)

CUE: You have obtained the equipment you identified.

3. OBTAIN equipment from Examinee simulates obtaining ____ ____ ____

Local LGA Support Locker equipment from Local LGA Support Locker CUE: You have obtained the equipment you identified.

  • 4. Remove fire hose from Hose Examinee simulates removing ____ ____ ____

(1st Line) Station FB451 and install a fire hose from Hose Station wye connector FB451 and installing a wye connector CUE: The fire hose and wye connector are positioned as you describe.

  • 5. Connect fire station fire hose Examinee simulates connecting nd (2 Line) to one end of wye and run it fire station fire hose to one end into 2A TDRFP Room of wye and running it into 2A TDRFP Room CUE: The fire hose and wye connector are positioned as you describe.

NOTE: The next step of LGA-FP-01 Attachment 2A is N/A because it performs the same action on the 2B TDRFP, which is out of service per initiating cue.

  • 6. (In 2A TDRFP Room) Examinee simulates installing (4th Line) Install wye connector at end wye connector at end of fire of fire hose hose SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 7 of 10 STEP ELEMENT STANDARD Comment (LGA-FP-01 SAT UNSAT Attachment Number 2A)

  • 7. Connect fire hoses to the Examinee simulates connecting (5th Line) two ends of this wye fire hoses to the two ends of connector. this wye connector CUE: The Fire hose is connected as you describe
  • 8. Install FP to 1" converter Examinee simulates installing (6th Line) on 2FW041A/42A, 2A FP to 1" converter on TDRFP Dsch Line 2FW041A/42A Upstrm/Dwnstr Lo Point Drain CUE: The converter is installed as you described.
  • 9. Connect one fire hose to 1" Examinee simulates connecting (7th Line) converter one fire hose to 1" converter CUE: The Fire hose is connected as you describe
  • 10. Install FP to 3/4" converter Examinee simulates installing (8th Line) on 2CB022C, A TDRFP FP to 3/4" converter on Suct Lo Point Drain Valve 2CB022C CUE: The converter is installed as you described.
  • 11. Connect other fire hose to Examinee simulates connecting (9th Line) 3/4" converter other fire hose to 3/4" converter CUE: The Fire hose is connected as you describe
12. Notify Unit 2 NSO that The Examinee simulates ____ ____ ____

alignment of FP to 2A notifying the Unit 2 NSO that TDRFP is complete alignment of FP to 2A TDRFP is complete CUE: As the Unit 2 NSO, acknowledge the report that FP is aligned to the 2A TDRFP.

13. Complete all required The Examinee completes or signatures, dates, and simulates completing all times on Attachment 2A required signatures, dates, and times on Attachment 2A TERMINATING CUE The JPM is complete when the Unit 2 NSO is notified.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

P-FP-04 Rev. 00 Page 8 of 10 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Lineup a Fire Hose to 2A TDRFP for Injection into the RPV JPM Number: P-FP-04 Revision Number: 00 Task Number and

Title:

414.020 Evaluate plant conditions and control RPV water level using FP K/A Number and Importance:295031 (Reactor Low Water Level) EA1.08 3.8/3.9 Ability to operate and/or monitor the following as they apply to REACTOR LOW WATER LEVEL: Alternate Injection Systems Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LGA-FP-01 Alternate Vessel Injection Using the Fire Protection System, Rev 15 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10 KEY

Page 10 of 10 INITIAL CONDITIONS

1. A reactor scram has occurred on Unit 2 and all rods are full in.
2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
3. The Unit 2 NSO is coordinating LGA-FP-01, Diesel Fire Pump Makeup to the Reactor.
4. An Operator has just been assigned to perform the in-plant actions to line up Fire Protection to the MDRFP.
5. The 2B TDRFP is OOS with the pump casing removed.
6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA-FP-01 at control room panels 2PM03J and 2H13-P601.
7. Fire protection header pressure is normal.
8. There is NO fire.
9. The Chemical Feed system is out of service.
10. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2A TDRFP IAW LGA-FP-01 Attachment 2A.

Inform the Unit 2 NSO when the alignment is complete.