ML13182A171: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/01/2013
| issue date = 07/01/2013
| title = NRC Staff Hearing File Update 12 - July, 2013
| title = NRC Staff Hearing File Update 12 - July, 2013
| author name = Kanatas C E
| author name = Kanatas C
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Froehlich W J, Kastenberg W E, Kennedy M F
| addressee name = Froehlich W, Kastenberg W, Kennedy M
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000352, 05000353
| docket = 05000352, 05000353
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:July 1, 2013 In the Matter of Exelon Generation Company, LLC (Limerick Generating Station, Units 1 and) Docket Nos. 50-352-LR / 50-353-LR  
{{#Wiki_filter:July 1, 2013 Administrative Judge                                Administrative Judge William J. Froehlich, Chair                          Dr. William E. Kastenberg Atomic Safety and Licensing Board                    Atomic Safety and Licensing Board Mail Stop: T-3F23                                    Mail Stop: T-3F23 Washington, DC 20555-001                            Washington, DC 20555-0001 Administrative Judge Dr. Michael F. Kennedy Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of Exelon Generation Company, LLC (Limerick Generating Station, Units 1 and)
Docket Nos. 50-352-LR / 50-353-LR


==Dear Administrative Judges:==
==Dear Administrative Judges:==


Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Board's ("Board") Initial Scheduling Order dated May 7, 2012, the staff of the Nuclear Regulatory Commission ("Staff") is providing an index (Attachment 1) identifying documents subject to disclosure under the Board's Order and 10 C.F.R. §§ 2.1203 and 2.336.
Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order dated May 7, 2012, the staff of the Nuclear Regulatory Commission (Staff) is providing an index (Attachment 1) identifying documents subject to disclosure under the Boards Order and 10 C.F.R. §§ 2.1203 and 2.336.
On or about July 5, 2013, the materials listed in Attachment 1 may be accessed through the Agencywide Documents Access and Management System ("ADAMS") and through the Electronic Hearing Docket ("EHD"). The index contains the ADAMS accession number, document date, and the document title for the documents in the hearing file.
On or about July 5, 2013, the materials listed in Attachment 1 may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD). The index contains the ADAMS accession number, document date, and the document title for the documents in the hearing file.
Pursuant to 10 C.F.R. § 2.336(c), attached is also the Affidavit of Leslie Perkins, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by June 27, 2013.  
Pursuant to 10 C.F.R. § 2.336(c), attached is also the Affidavit of Leslie Perkins, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by June 27, 2013.
 
The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding.
The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding.
Administrative Judge  William J. Froehlich, Chair Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-001
Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001
Administrative Judge 
Dr. Michael F. Kennedy Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001


Judge Froehlich       July 1, 2013 Judge Kennedy Judge Kastenberg Sincerely,       Signed (electronically) by
Judge Froehlich                                                       July 1, 2013 Judge Kennedy Judge Kastenberg Sincerely, Signed (electronically) by Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: Catherine.kanatas@nrc.gov Date of signature: July 1, 2013
_______________________________      Catherine E. Kanatas       Counsel for NRC Staff U.S. Nuclear Regulatory Commission       Office of the General Counsel       Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: Catherine.kanatas@nrc.gov       Date of signature: July 1, 2013  


==Enclosures:==
==Enclosures:==
Attachment 1: Hearing File Index - Update 12   Attachment 2: Affidavit of Leslie Perkins  
Attachment 1: Hearing File Index - Update 12 Attachment 2: Affidavit of Leslie Perkins
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of      )        )
EXELON GENERATION COMPANY, LLC    )  50-352-LR/ 50-353-LR
      )
(Limerick Generating Station, Units 1 and 2)  )        )     
 
CERTIFICATE OF SERVICE I hereby certify that copies of the letter from Catherine E. Kanatas to the Board, dated July 1, 2013; Attachment 1 - Limerick License Renewal Hearing File Index Initial, Update 12;  -Affidavit of Leslie Perkins Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b); have been submitted through the E-filing System this 1st day of July, 2013:
 
        /Signed (electronically) by/
Catherine E. Kanatas        Counsel for NRC Staff        U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC  20555        Telephone:  (301) 415-2321        E-mail: catherine.kanatas@nrc.gov Date of signature:  July 1, 2013


      - Limerick License Renewal Hearing File and Mandatory DisclosuresHearing File Index - Update 12July 1, 2013Page 1 of 1Accession No.TitleDateAccession No.TitleDateML13175A0992013/06/21 Limerick LR - 6.21.13- LIM - LGS Draft SEIS Comment Package.pdf - Adobe Acrobat Professional06/21/2013ML13172A345Limerick Generating Station, Units 1 and 2 - Review of the Draft Plant-Specific Supplement 49 to the Generic Environmental Impact Statement for License Renewal.06/21/2013ML13178A2142013/06/24 Limerick LR - Minor Updates, Corrections, and Clarifications Regarding Draft NUREG-1437, Supplement 4906/24/2013  
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                      )
                                                      )
EXELON GENERATION COMPANY, LLC                        )      50-352-LR/ 50-353-LR
                                                      )
(Limerick Generating Station, Units 1 and 2)          )
                                                      )
CERTIFICATE OF SERVICE I hereby certify that copies of the letter from Catherine E. Kanatas to the Board, dated July 1, 2013; Attachment 1 - Limerick License Renewal Hearing File Index Initial, Update 12;  -Affidavit of Leslie Perkins Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b); have been submitted through the E-filing System this 1st day of July, 2013:
                                                        /Signed (electronically) by/
Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: July 1, 2013


In the Matter of EXELON GENERATION COMPANY, LLC (Limerick Generating Station, Units 1 and 2) Docket Nos. 50-352-LR and 50-353-LR Attachment 2 Affidavit of Leslie Perkins June 27, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
Attachment 1 - Limerick License Renewal Hearing File and Mandatory Disclosures Hearing File Index - Update 12 Accession No. Title                                                                                                        Date Accession No. Title                                                                                                        Date ML13175A099  2013/06/21 Limerick LR - 6.21.13- LIM - LGS Draft SEIS Comment Package.pdf - Adobe Acrobat Professional      06/21/2013 ML13172A345  Limerick Generating Station, Units 1 and 2 - Review of the Draft Plant-Specific Supplement 49 to the Generic 06/21/2013 Environmental Impact Statement for License Renewal.
ML13178A214  2013/06/24 Limerick LR - Minor Updates, Corrections, and Clarifications Regarding Draft NUREG-1437,          06/24/2013 Supplement 49 July 1, 2013                                                                                                                     Page 1 of 1


In the Matter of         )            ) Exelon Generation Company, LLC   ) Docket Nos. 50-352-LR/ 50-353-LR     ) (Exelon Generation Station, Units 1 and 2)      )
In the Matter of EXELON GENERATION COMPANY, LLC (Limerick Generating Station, Units 1 and 2)
Docket Nos. 50-352-LR and 50-353-LR Attachment 2 Affidavit of Leslie Perkins


June 27, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                      )
                                                      )
Exelon Generation Company, LLC                        )      Docket Nos. 50-352-LR/ 50-353-LR
                                                      )
(Exelon Generation Station, Units 1 and 2)            )
AFFIDAVIT OF LESLIE PERKINS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
AFFIDAVIT OF LESLIE PERKINS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Leslie Perkins, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Limerick Generating Station, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding. 2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) and 10 C.F.R. § 2.1203(b) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of June 27, 2013. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. Executed in Accordance with 10 CFR § 2.304 (d)
I, Leslie Perkins, do hereby state as follows:
Leslie Perkins       Project Manager  
: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Limerick Generating Station, Units 1 and 2 license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
 
: 2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) and 10 C.F.R. § 2.1203(b) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of June 27, 2013.
Executed in Rockville, Maryland this 27th day of June, 2013}}
: 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Accordance with 10 CFR § 2.304 (d)
Leslie Perkins Project Manager Executed in Rockville, Maryland this 27th day of June, 2013}}

Latest revision as of 04:32, 6 February 2020

NRC Staff Hearing File Update 12 - July, 2013
ML13182A171
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/01/2013
From: Catherine Kanatas
NRC/OGC
To: William Froehlich, Kastenberg W, Kennedy M
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24736, 50-352-LR, 50-353-LR, ASLBP 12-916-04-LR-BD01
Download: ML13182A171 (6)


Text

July 1, 2013 Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. William E. Kastenberg Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. Michael F. Kennedy Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of Exelon Generation Company, LLC (Limerick Generating Station, Units 1 and)

Docket Nos. 50-352-LR / 50-353-LR

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order dated May 7, 2012, the staff of the Nuclear Regulatory Commission (Staff) is providing an index (Attachment 1) identifying documents subject to disclosure under the Boards Order and 10 C.F.R. §§ 2.1203 and 2.336.

On or about July 5, 2013, the materials listed in Attachment 1 may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD). The index contains the ADAMS accession number, document date, and the document title for the documents in the hearing file.

Pursuant to 10 C.F.R. § 2.336(c), attached is also the Affidavit of Leslie Perkins, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by June 27, 2013.

The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding.

Judge Froehlich July 1, 2013 Judge Kennedy Judge Kastenberg Sincerely, Signed (electronically) by Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: Catherine.kanatas@nrc.gov Date of signature: July 1, 2013

Enclosures:

Attachment 1: Hearing File Index - Update 12 Attachment 2: Affidavit of Leslie Perkins

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

EXELON GENERATION COMPANY, LLC ) 50-352-LR/ 50-353-LR

)

(Limerick Generating Station, Units 1 and 2) )

)

CERTIFICATE OF SERVICE I hereby certify that copies of the letter from Catherine E. Kanatas to the Board, dated July 1, 2013; Attachment 1 - Limerick License Renewal Hearing File Index Initial, Update 12; -Affidavit of Leslie Perkins Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b); have been submitted through the E-filing System this 1st day of July, 2013:

/Signed (electronically) by/

Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: July 1, 2013

Attachment 1 - Limerick License Renewal Hearing File and Mandatory Disclosures Hearing File Index - Update 12 Accession No. Title Date Accession No. Title Date ML13175A099 2013/06/21 Limerick LR - 6.21.13- LIM - LGS Draft SEIS Comment Package.pdf - Adobe Acrobat Professional 06/21/2013 ML13172A345 Limerick Generating Station, Units 1 and 2 - Review of the Draft Plant-Specific Supplement 49 to the Generic 06/21/2013 Environmental Impact Statement for License Renewal.

ML13178A214 2013/06/24 Limerick LR - Minor Updates, Corrections, and Clarifications Regarding Draft NUREG-1437, 06/24/2013 Supplement 49 July 1, 2013 Page 1 of 1

In the Matter of EXELON GENERATION COMPANY, LLC (Limerick Generating Station, Units 1 and 2)

Docket Nos. 50-352-LR and 50-353-LR Attachment 2 Affidavit of Leslie Perkins

June 27, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

Exelon Generation Company, LLC ) Docket Nos. 50-352-LR/ 50-353-LR

)

(Exelon Generation Station, Units 1 and 2) )

AFFIDAVIT OF LESLIE PERKINS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Leslie Perkins, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Limerick Generating Station, Units 1 and 2 license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) and 10 C.F.R. § 2.1203(b) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of June 27, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accordance with 10 CFR § 2.304 (d)

Leslie Perkins Project Manager Executed in Rockville, Maryland this 27th day of June, 2013