ML14196A419: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 20: | Line 20: | ||
--------------------------------------------NOTE-------------------------------------------- | --------------------------------------------NOTE-------------------------------------------- | ||
Momentary transients above the [secondary] containment pressure limit are permitted. | Momentary transients above the [secondary] containment pressure limit are permitted. | ||
APPLICABILITY: MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the | APPLICABILITY: MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the | ||
[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs). | [secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs). | ||
| Line 26: | Line 25: | ||
B. Required Action and B.1 ---------------NOTE-------------- | B. Required Action and B.1 ---------------NOTE-------------- | ||
associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3. | associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3. | ||
Be in MODE 3. 12 hours C. [Secondary] containment C.1 ---------------NOTE-------------- | Be in MODE 3. 12 hours C. [Secondary] containment C.1 ---------------NOTE-------------- | ||
inoperable during LCO 3.0.3 is not applicable. | inoperable during LCO 3.0.3 is not applicable. | ||
Revision as of 19:04, 5 February 2020
| ML14196A419 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 07/07/2014 |
| From: | Mann A - No Known Affiliation |
| To: | |
| Shared Package | |
| ML14196A409 | List: |
| References | |
| Download: ML14196A419 (4) | |
Text
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 [Secondary] Containment LCO 3.6.4.1 The [secondary] containment shall be OPERABLE.
NOTE--------------------------------------------
Momentary transients above the [secondary] containment pressure limit are permitted.
APPLICABILITY: MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the
[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. [Secondary] containment A.1 Restore [secondary] 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, containment to OPERABLE 2, or 3. status.
B. Required Action and B.1 ---------------NOTE--------------
associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3.
Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. [Secondary] containment C.1 ---------------NOTE--------------
inoperable during LCO 3.0.3 is not applicable.
movement of [recently] -------------------------------------
irradiated fuel assemblies in the Suspend movement of Immediately
[secondary] containment [recently] irradiated fuel or during OPDRVs. assemblies in the
[secondary] containment.
AND C.2 Initiate action to suspend Immediately General Electric BWR/4 STS 3.6.4.1-1 Rev. 4.0
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 CONDITION REQUIRED ACTION COMPLETION TIME OPDRVs.
General Electric BWR/4 STS 3.6.4.1-2 Rev. 4.0
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 [ Verify [secondary] containment vacuum is [ 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
[0.25] inch of vacuum water gauge.
OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.2 Verify all [secondary] containment equipment [ 31 days hatches are closed and sealed.
OR In accordance with the Surveillance Frequency Control Program ]
SR 3.6.4.1.3 Verify one [secondary] containment access door in [ 31 days each access opening is closed, except when the access opening is being used for entry and exit. OR In accordance with the Surveillance Frequency Control Program ]
General Electric BWR/4 STS 3.6.4.1-3 Rev. 4.0
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.4.1.4 [ Verify [secondary] containment can be drawn down [ [18] months on a to [0.25] inch of vacuum water gauge in STAGGERED
[120] seconds using one standby gas treatment TEST BASIS for (SGT) subsystem. each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.5 Verify the [secondary] containment can be [ [18] months on a maintained [0.25] inch of vacuum water gauge for STAGGERED 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem at a flow rate TEST BASIS for
[4000] cfm. each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]
General Electric BWR/4 STS 3.6.4.1-4 Rev. 4.0