|
|
(13 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17339A095 | | | number = ML17339A095 |
| | issue date = 12/13/2017 | | | issue date = 12/13/2017 |
| | title = Hope Creek Generating Station - Request for Withholding Information from Public Disclosure (EPID L-2017-LLA-0387) | | | title = Request for Withholding Information from Public Disclosure |
| | author name = Regner L M | | | author name = Regner L |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = Sena P P | | | addressee name = Sena P |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000354 | | | docket = 05000354 |
Line 13: |
Line 13: |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
| | project = EPID:L-2017-LLA-0387, EPID:L-2017-LLA-0387 | | | project = EPID:L-2017-LLA-0387 |
| | stage = | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 WASHINGTON, D.C. 20555-0001 December 13, 2017 SUBJECT: REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (EPID L-2017-LLA-0387) Dear Mr. Sena: By letter dated November 9, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 173178320), PSEG Nuclear LLC (PSEG) submitted a Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated October 19, 2017, executed by Mr. Brian R. Moore, General Manager, Core & Fuel Engineering, GNF-A. PSEG requested that the information contained in Enclosure 1 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. Specifically, PSEG requested that the following document be withheld: GNF proprietary report GNF-004N5379-RO-P, "GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR [safety limit minimum critical power ratio change] Hope Creek Cycle 22," dated October 2017 A nonproprietary copy of this document has been placed with the November 19, 2017, letter in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; ( 4 )b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and shoutd be withheld from public disclosure. Therefore, the version of the submitted information P. Sena, Ill -2 -marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1906 or Lisa.Regner@nrc.gov. r* Docket No. 50-354 cc: Mr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv ! Sincerely*: ,,r,l r / : ,, ' , I , , y* Ay 'I' C .. I L./1 ', Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation P. Sena, Ill -3 -SUBJECT: REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (EPID L-2017-LLA-0387) DATED DECEMBER 13, 2017 DISTRIBUTION: PUBLIC PM Reading File RidsRgn1 MailCenter Resource RidsNrrDorllpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMHopeCreek Resource RidsACRS_MailCTR Resource RidsNrrDssSrxb Resource MRazzaque, NRA ADAMS A ccess1on N ML 17339A095 o.: OFFICE DORULPL4/PM DORULPL1/LA NAME LRegner LRonewicz DATE 12/05/17 12/05/17 DSS/SRXB/BC(A) JWhitman RBeaton for) 12/13/17 OFFICIAL RECORD COPY 'b lvema1 DORULPL1/BC DORULPL4/PM JDanna LRegner 12/13/17 12/13/17 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 13, 2017 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 |
| }} | | |
| | ==SUBJECT:== |
| | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (EPID L-2017-LLA-0387) |
| | |
| | ==Dear Mr. Sena:== |
| | |
| | By letter dated November 9, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML173178320), PSEG Nuclear LLC (PSEG) submitted a Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated October 19, 2017, executed by Mr. Brian R. Moore, General Manager, Core & Fuel Engineering, GNF-A. PSEG requested that the information contained in Enclosure 1 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. Specifically, PSEG requested that the following document be withheld: |
| | GNF proprietary report GNF-004N5379-RO-P, "GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR |
| | [safety limit minimum critical power ratio change] Hope Creek Cycle 22," dated October 2017 A nonproprietary copy of this document has been placed with the November 19, 2017, letter in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS. |
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| | (4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; |
| | ( 4 )b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and shoutd be withheld from public disclosure. Therefore, the version of the submitted information |
| | |
| | P. Sena, Ill marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at 301-415-1906 or Lisa.Regner@nrc.gov. r* |
| | Sincerely*: |
| | ,,r,l |
| | 'r ,/ I: ,,,, y* |
| | Ay .. I'I' C L./1 ', |
| | Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Mr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel - Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv |
| | |
| | P. Sena, Ill |
| | |
| | ==SUBJECT:== |
| | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (EPID L-2017-LLA-0387) |
| | DATED DECEMBER 13, 2017 DISTRIBUTION: |
| | PUBLIC PM Reading File RidsRgn1 MailCenter Resource RidsNrrDorllpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMHopeCreek Resource RidsACRS_MailCTR Resource RidsNrrDssSrxb Resource MRazzaque, NRA ADAMS Access1on No.: ML17339A095 'blvema1 OFFICE DORULPL4/PM DORULPL1/LA DSS/SRXB/BC(A) DORULPL1/BC DORULPL4/PM NAME LRegner LRonewicz JWhitman JDanna LRegner RBeaton for) |
| | DATE 12/05/17 12/05/17 12/13/17 12/13/17 12/13/17 OFFICIAL RECORD COPY}} |
Letter Sequence Withholding Request Acceptance |
---|
EPID:L-2017-LLA-0387, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 13, 2017 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (EPID L-2017-LLA-0387)
Dear Mr. Sena:
By letter dated November 9, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML173178320), PSEG Nuclear LLC (PSEG) submitted a Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated October 19, 2017, executed by Mr. Brian R. Moore, General Manager, Core & Fuel Engineering, GNF-A. PSEG requested that the information contained in Enclosure 1 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. Specifically, PSEG requested that the following document be withheld:
GNF proprietary report GNF-004N5379-RO-P, "GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR
[safety limit minimum critical power ratio change] Hope Creek Cycle 22," dated October 2017 A nonproprietary copy of this document has been placed with the November 19, 2017, letter in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies;
( 4 )b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and shoutd be withheld from public disclosure. Therefore, the version of the submitted information
P. Sena, Ill marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1906 or Lisa.Regner@nrc.gov. r*
Sincerely*:
,,r,l
'r ,/ I: ,,,, y*
Ay .. I'I' C L./1 ',
Lisa M. Regner, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Mr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel - Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
P. Sena, Ill
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (EPID L-2017-LLA-0387)
DATED DECEMBER 13, 2017 DISTRIBUTION:
PUBLIC PM Reading File RidsRgn1 MailCenter Resource RidsNrrDorllpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMHopeCreek Resource RidsACRS_MailCTR Resource RidsNrrDssSrxb Resource MRazzaque, NRA ADAMS Access1on No.: ML17339A095 'blvema1 OFFICE DORULPL4/PM DORULPL1/LA DSS/SRXB/BC(A) DORULPL1/BC DORULPL4/PM NAME LRegner LRonewicz JWhitman JDanna LRegner RBeaton for)
DATE 12/05/17 12/05/17 12/13/17 12/13/17 12/13/17 OFFICIAL RECORD COPY