|
|
(9 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17356A228 | | | number = ML17356A228 |
| | issue date = 12/29/2017 | | | issue date = 12/29/2017 |
| | title = Seabrook Station, Unit No. 1 - Nonacceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption (EPID L-2017-LLA-0353; EPID L-2017-LLE-0028) | | | title = Nonacceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption (EPID L-2017-LLA-0353; EPID L-2017-LLE-0028) |
| | author name = Poole J C | | | author name = Poole J |
| | author affiliation = NRC/NRR/DORL/LPLI | | | author affiliation = NRC/NRR/DORL/LPLI |
| | addressee name = Nazar M | | | addressee name = Nazar M |
Line 9: |
Line 9: |
| | docket = 05000443 | | | docket = 05000443 |
| | license number = NPF-086 | | | license number = NPF-086 |
| | contact person = Poole J C, NRR/DORL/LPLI, 415-2048 | | | contact person = Poole J, NRR/DORL/LPLI, 415-2048 |
| | case reference number = EPID L-2017-LLA-0353, EPID L-2017-LLE-0028 | | | case reference number = EPID L-2017-LLA-0353, EPID L-2017-LLE-0028 |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
| | project = EPID:L-2017-LLA-0353, EPID:L-2017-LLE-0028 | | | project = EPID:L-2017-LLA-0353, EPID:L-2017-LLE-0028 |
| | stage = Other | | | stage = Acceptance Review |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd. Juno Beach, FL 33408 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd. |
| | Juno Beach, FL 33408 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERA TOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) | | SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERATOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) |
|
| |
|
| ==Dear Mr. Nazar:== | | ==Dear Mr. Nazar:== |
| By letter dated October 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17283A398), as supplemented by letter dated December 14, 2017 (ADAMS Package Accession No. ML 17348A865), NextEra Energy Seabrook, LLC (NextEra) submitted a license amendment and exemption request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would update the fire protection program to remove a commitment to perform an operator action to trip the station offsite power circuit breakers during a fire in the train A switchgear room. The December 14, 2017, supplement removed the request for exemption. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the NextEra request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. By letter dated December 27, 2017 (ADAMS Accession No. ML 17361A319), you requested to withdraw the application from NRC review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Enterprise Project Identifiers have been closed. The NRC staff notes the supplement provided by letter dated December 14, 2017, was unresponsive to the cited informational needs found in the staff's letter dated November 29, 2017, (ADAMS Accession No. ML 17332A341 ). Specifically, your responses to TECH2, TECH6, M. Nazar and TECH? were either not responsive to the questions asked or lacked sufficient information such that it is unlikely that the NRC staff could complete its detailed technical review in an appropriate timeframe, given the information insufficiencies. For example, in the case of TECH6, while your response provided other trip capabilities, there was no supporting information regarding whether or not these other capabilities were susceptible to the same fire damage as the shunt cable trip, which information the question asked for. Without this information, the NRC staff has no basis to consider that those other trip capabilities would remain available in the event of a fire that damages the manual trip ( shunt trip) cables. The responses to TECH2 and TECH? indicate to the NRC staff indicate that there are deficencies related to the use of NRC guidance or completeness of technical analysis, or both. Additionally, the NRC identified that your response to REG2 contained apparently conflicting statements. At one point in the response you state, " ... deletion of the operator action to trip the station offsite power breakers for a fire in the train A essential switchgear room is adverse to the fire protection program (FPP) in that a manual action that utilizes a circuit protected from damage is being replaced with credit for operation of a circuit that may be subject to fire damage." However, later on in your response, you state, " ... removal of the operator action to trip the station offsite power breakers and the deviation from BTP CMEB 9.5.1 separation requirements are justified and do not adversely affect the ability to achieve and maintain safe shutdown conditions in the event of a fire." Given these apparently conflicting statements, the NRC staff is uncertain whether it is the NextEra position that the proposed changes adversely impact Seabrook's ability to achieve and maintain shutdown. Therefore, should you decide to re-submit the request, the NRC staff expects that these comments be adequately addressed. If you have any questions, please contact me at (301) 415-2048 or Justin.Poole@nrc.gov. Docket No. 50-443 cc: Distribution via Listserv Sincere! -------Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation M. Nazar | | |
| | By letter dated October 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17283A398), as supplemented by letter dated December 14, 2017 (ADAMS Package Accession No. ML17348A865), NextEra Energy Seabrook, LLC (NextEra) submitted a license amendment and exemption request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would update the fire protection program to remove a commitment to perform an operator action to trip the station offsite power circuit breakers during a fire in the train A switchgear room. The December 14, 2017, supplement removed the request for exemption. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the NextEra request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. |
| | This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | By letter dated December 27, 2017 (ADAMS Accession No. ML17361A319), you requested to withdraw the application from NRC review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Enterprise Project Identifiers have been closed. |
| | The NRC staff notes the supplement provided by letter dated December 14, 2017, was unresponsive to the cited informational needs found in the staff's letter dated November 29, 2017, (ADAMS Accession No. ML17332A341 ). Specifically, your responses to TECH2, TECH6, |
| | |
| | M. Nazar and TECH? were either not responsive to the questions asked or lacked sufficient information such that it is unlikely that the NRC staff could complete its detailed technical review in an appropriate timeframe, given the information insufficiencies. For example, in the case of TECH6, while your response provided other trip capabilities, there was no supporting information regarding whether or not these other capabilities were susceptible to the same fire damage as the shunt cable trip, which information the question asked for. Without this information, the NRC staff has no basis to consider that those other trip capabilities would remain available in the event of a fire that damages the manual trip (shunt trip) cables. The responses to TECH2 and TECH? indicate to the NRC staff indicate that there are deficencies related to the use of NRC guidance or completeness of technical analysis, or both. |
| | Additionally, the NRC identified that your response to REG2 contained apparently conflicting statements. At one point in the response you state, " ... deletion of the operator action to trip the station offsite power breakers for a fire in the train A essential switchgear room is adverse to the fire protection program (FPP) in that a manual action that utilizes a circuit protected from damage is being replaced with credit for operation of a circuit that may be subject to fire damage." However, later on in your response, you state, "... removal of the operator action to trip the station offsite power breakers and the deviation from BTP CMEB 9.5.1 separation requirements are justified and do not adversely affect the ability to achieve and maintain safe shutdown conditions in the event of a fire." Given these apparently conflicting statements, the NRC staff is uncertain whether it is the NextEra position that the proposed changes adversely impact Seabrook's ability to achieve and maintain shutdown. |
| | Therefore, should you decide to re-submit the request, the NRC staff expects that these comments be adequately addressed. |
| | If you have any questions, please contact me at (301) 415-2048 or Justin.Poole@nrc.gov. |
| | Sincere! |
| | Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv |
| | |
| | M. Nazar |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERATOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) DATED DECEMBER 29, 2017 DISTRIBUTION: PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDraAplb Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMSeabrook Resource RidsRgn1 MailCenter Resource DFrumkin, NRR ADAMS A ccess1on N ML 17356A228 o.: OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NAME JPoole LRonewicz DATE 12/22/2017 12/22/2017 OFFICE NRR/DORL/LPL 1/PM NAME JPoole DATE 12/29/2017 *b ., 1y e-ma1 NRR/DRNAPLB/BC(A) JRobinson* 12/22/2017 OFFICIAL RECORD COPY NRR/DORL/LPL 1/BC JDanna 12/29/2017 | | SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERATOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) DATED DECEMBER 29, 2017 DISTRIBUTION: |
| }} | | PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDraAplb Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMSeabrook Resource RidsRgn1 MailCenter Resource DFrumkin, NRR ADAMS Access1on No.: ML17356A228 *b1y e-ma1 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DRNAPLB/BC(A) NRR/DORL/LPL 1/BC NAME JPoole LRonewicz JRobinson* JDanna DATE 12/22/2017 12/22/2017 12/22/2017 12/29/2017 OFFICE NRR/DORL/LPL 1/PM NAME JPoole DATE 12/29/2017 OFFICIAL RECORD COPY}} |
Letter Sequence Acceptance Review |
---|
EPID:L-2017-LLA-0353, Request for License Amendment and Exemption Deletion of Operator Action and Request for Exemption from Section III.G.2.b of 10 CFR 50, Appendix R (LAR 17-05) (Withdrawn, Closed) EPID:L-2017-LLE-0028, Request for License Amendment and Exemption Deletion of Operator Action and Request for Exemption from Section III.G.2.b of 10 CFR 50, Appendix R (LAR 17-05) (Withdrawn, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERATOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028)
Dear Mr. Nazar:
By letter dated October 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17283A398), as supplemented by letter dated December 14, 2017 (ADAMS Package Accession No. ML17348A865), NextEra Energy Seabrook, LLC (NextEra) submitted a license amendment and exemption request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would update the fire protection program to remove a commitment to perform an operator action to trip the station offsite power circuit breakers during a fire in the train A switchgear room. The December 14, 2017, supplement removed the request for exemption. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the NextEra request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
By letter dated December 27, 2017 (ADAMS Accession No. ML17361A319), you requested to withdraw the application from NRC review. The NRC acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Enterprise Project Identifiers have been closed.
The NRC staff notes the supplement provided by letter dated December 14, 2017, was unresponsive to the cited informational needs found in the staff's letter dated November 29, 2017, (ADAMS Accession No. ML17332A341 ). Specifically, your responses to TECH2, TECH6,
M. Nazar and TECH? were either not responsive to the questions asked or lacked sufficient information such that it is unlikely that the NRC staff could complete its detailed technical review in an appropriate timeframe, given the information insufficiencies. For example, in the case of TECH6, while your response provided other trip capabilities, there was no supporting information regarding whether or not these other capabilities were susceptible to the same fire damage as the shunt cable trip, which information the question asked for. Without this information, the NRC staff has no basis to consider that those other trip capabilities would remain available in the event of a fire that damages the manual trip (shunt trip) cables. The responses to TECH2 and TECH? indicate to the NRC staff indicate that there are deficencies related to the use of NRC guidance or completeness of technical analysis, or both.
Additionally, the NRC identified that your response to REG2 contained apparently conflicting statements. At one point in the response you state, " ... deletion of the operator action to trip the station offsite power breakers for a fire in the train A essential switchgear room is adverse to the fire protection program (FPP) in that a manual action that utilizes a circuit protected from damage is being replaced with credit for operation of a circuit that may be subject to fire damage." However, later on in your response, you state, "... removal of the operator action to trip the station offsite power breakers and the deviation from BTP CMEB 9.5.1 separation requirements are justified and do not adversely affect the ability to achieve and maintain safe shutdown conditions in the event of a fire." Given these apparently conflicting statements, the NRC staff is uncertain whether it is the NextEra position that the proposed changes adversely impact Seabrook's ability to achieve and maintain shutdown.
Therefore, should you decide to re-submit the request, the NRC staff expects that these comments be adequately addressed.
If you have any questions, please contact me at (301) 415-2048 or Justin.Poole@nrc.gov.
Sincere!
Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
M. Nazar
SUBJECT:
SEABROOK STATION, UNIT NO. 1 -WITHDRAWAL OF REQUESTED LICENSING ACTION RE: AMENDMENT TO DELETE OPERATOR ACTION AND REQUEST FOR EXEMPTION SUBMITTED TO NRC FOR ACCEPTANCE REVIEW (EPID L-2017-LLA-0353 AND EPID L-2017-LLE-0028) DATED DECEMBER 29, 2017 DISTRIBUTION:
PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDraAplb Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMSeabrook Resource RidsRgn1 MailCenter Resource DFrumkin, NRR ADAMS Access1on No.: ML17356A228 *b1y e-ma1 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DRNAPLB/BC(A) NRR/DORL/LPL 1/BC NAME JPoole LRonewicz JRobinson* JDanna DATE 12/22/2017 12/22/2017 12/22/2017 12/29/2017 OFFICE NRR/DORL/LPL 1/PM NAME JPoole DATE 12/29/2017 OFFICIAL RECORD COPY