| ==SUBJECT:== | | ==SUBJECT:== |
| VOGTLE 3 - PLANT REFERENCE SIMULATOR INSPECTION REQUEST FOR INFORMATION dated October 9, 2019 DISTRIBUTION OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource ADAMS Accession No ML19284D392 OFFICE RII: DRS/OB2 RII: DRS/OB2 SIGNATURE DLanyi EGuthrie DATE 10/9/2019 10/9/2019 | | VOGTLE 3 - PLANT REFERENCE SIMULATOR INSPECTION REQUEST FOR INFORMATION dated October 9, 2019 DISTRIBUTION OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource ADAMS Accession No ML19284D392 OFFICE RII: DRS/OB2 RII: DRS/OB2 SIGNATURE DLanyi EGuthrie DATE 10/9/2019 10/9/2019 |
| .
| |
|
| |
|
| Document Request List Inspection Dates: December 3 - 5, 2019 Inspection Procedure (IP): 41502, Nuclear Power Plant Simulation Facilities Note: This is a list of the documents to be provided to the inspectors. The current version of these documents is expected unless specified otherwise. The documentation will be requested in two batches. The first batch will consist of all Plant Simulator Program Procedures and a list of all completed simulator tests, a list of all open and closed simulator Deficiency Reports, and a listing of all applicable simulator related Training Needs Assessments or Evaluations. The second batch of information will be a smart sample chosen by the inspectors from the list provided in the first batch. | | Document Request List Inspection Dates: December 3 - 5, 2019 Inspection Procedure (IP): 41502, Nuclear Power Plant Simulation Facilities Note: This is a list of the documents to be provided to the inspectors. The current version of these documents is expected unless specified otherwise. The documentation will be requested in two batches. The first batch will consist of all Plant Simulator Program Procedures and a list of all completed simulator tests, a list of all open and closed simulator Deficiency Reports, and a listing of all applicable simulator related Training Needs Assessments or Evaluations. The second batch of information will be a smart sample chosen by the inspectors from the list provided in the first batch. |
Latest revision as of 17:07, 1 February 2020
|
---|
Category:Letter
MONTHYEARML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, (Vegp), Unit 3, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 (Vegp), Unit 3, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report ML24030A9092024-04-10010 April 2024 Issuance of Amendment Nos. 224 and 207, Regarding Revision to Technical Specification 3.4.14 (Reactor Coolant System) Pressure Isolation Valve Leakage Surveillance Requirement 3.4.14.1 ML24079A0062024-04-10010 April 2024 – Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML24096A1322024-04-0505 April 2024 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing and Order (EPID L-2024-LLA-0043) - Letter NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. 2024-09-09
[Table view] |
Text
October 9, 2019 Mr. Michael Yox Regulatory Affairs Director Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 Waynesboro, GA 30830
SUBJECT:
VOGTLE 3 - PLANT REFERENCE SIMULATOR INSPECTION REQUEST FOR INFORMATION
Dear Mr. Yox:
From December 3 - 5, 2019, the U.S. Nuclear Regulatory Commission (NRC) will perform a Construction program inspection at the Vogtle Electric Generating Plant Unit 3. The inspection will verify that the plant referenced simulator is designed and implemented so that it is enough in scope and fidelity to be suitable for conduct of the evolutions listed in 10 CFR 55.45(a)(1) through (13), and 55.59(c)(3)(i)(A) through (AA) using NRC Inspection Procedure (IP) 41502, Nuclear Power Plant Simulation Facilities.
This inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all these documents are up-to-date, and complete, to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff. We understand that our regulatory contact for this inspection will be Jaxson Nelson (706-848-7862; jnelson@southernco.com) of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, David Lanyi at 404- 997-4487 (david.lanyi@nrc.gov), or the Chief, Operations Branch 2, Eugene Guthrie at 404-997-4662 (Eugene.Guthie@nrc.gov).
M. Yox 2 This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 52-25 License No.: NPF-91
Enclosure:
Document Request List cc: Distribution via Listserv
M. Yox 3
SUBJECT:
VOGTLE 3 - PLANT REFERENCE SIMULATOR INSPECTION REQUEST FOR INFORMATION dated October 9, 2019 DISTRIBUTION OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource ADAMS Accession No ML19284D392 OFFICE RII: DRS/OB2 RII: DRS/OB2 SIGNATURE DLanyi EGuthrie DATE 10/9/2019 10/9/2019
Document Request List Inspection Dates: December 3 - 5, 2019 Inspection Procedure (IP): 41502, Nuclear Power Plant Simulation Facilities Note: This is a list of the documents to be provided to the inspectors. The current version of these documents is expected unless specified otherwise. The documentation will be requested in two batches. The first batch will consist of all Plant Simulator Program Procedures and a list of all completed simulator tests, a list of all open and closed simulator Deficiency Reports, and a listing of all applicable simulator related Training Needs Assessments or Evaluations. The second batch of information will be a smart sample chosen by the inspectors from the list provided in the first batch.
The preferred file format is Word or searchable .pdf files on CDROM or CERTREC. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies It is not the intent that large or burdensome data be scanned for this. This data will be inspected using original documentation. Material can be provided prior to the inspection via Southern Companys ftp site.
Initial Document Request (Due October 16, 2019)
- All procedures associated with testing and maintaining the Plant Reference Simulator
- A list of all completed simulator tests
- A list of all simulator open and closed Deficiency Reports
- A list of all simulator Training Needs Assessments Follow-up Document Request (Due October 28, 2019 or as agreed upon after the first batch)
- One power ascension test from Cold Shutdown to Rated Power
- Five malfunction tests (at least 3 should relate to nuclear and/or thermal-hydraulic operating characteristics and two should relate to extensive logic/interlock performance)
- Up to five Scenario Based Tests (if any have been completed)
- One Reactor Core performance test including predicted models performance
- Complete Deficiency Reports for items of interest Lead Inspector Contact Information:
David.Lanyi 404-997-4487 David.Lanyi@nrc.gov Enclosure