ML19207C022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19207C029
| number = ML19207C029
| issue date = 08/30/1979
| issue date = 08/30/1979
| title = Forwards LER 79-066/03L-0
| title = LER 79-066/03L-0:on 790731,while Working on Ref Leg of Torus Level Instrument CAC-LT-3342,CAC-LT-2601 Instrument Drifted Out of tolerance.CAC-LT-2601 Also Malfunctioned.Caused by Air Trapped in Sensing Lines.Instruments Recalibr
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 08:52, 24 January 2020

Forwards LER 79-066/03L-0
Date released: 08/09/2019 Download: ML19207C022


LER 79-066/03L-0:on 790731,while Working on Ref Leg of Torus Level Instrument CAC-LT-3342,CAC-LT-2601 Instrument Drifted Out of tolerance.CAC-LT-2601 Also Malfunctioned.Caused by Air Trapped in Sensing Lines.Instruments Recalibr
ML19207C029
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/30/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207C029 (2)
Forwards LER 79-066/03L-0
ML19207C021
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/30/1979
From: Furr B
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207C021 (1)