ML19246B067: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 6: | Line 6: | ||
| number = ML19246B068 | | number = ML19246B068 | ||
| issue date = 02/23/1978 | | issue date = 02/23/1978 | ||
| title = | | title = LER 78-015/03L-0 on 780205:during Reactor Recirculation Pump Discharge Valve Cycle Test,Valve B32-F031A Failed in Closed Position Requiring Pump a to Be Secured.Caused by Stuck 42 Auxiliary Contactor.Contractor Realigned | ||
| author name = | | author name = | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
Latest revision as of 21:32, 23 January 2020
| Date released: 09/17/2019 | Download: ML19246B067 |
|---|---|
| ML19246B068 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/23/1978 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML19246B068 (2) | |
| ML19246B066 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/23/1978 |
| From: | Banks H CAROLINA POWER & LIGHT CO. |
| To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| Download: ML19246B066 (1) | |