ML19246B067: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
 
Line 6: Line 6:
| number = ML19246B068
| number = ML19246B068
| issue date = 02/23/1978
| issue date = 02/23/1978
| title = Forwards LER 78-015/03L-0
| title = LER 78-015/03L-0 on 780205:during Reactor Recirculation Pump Discharge Valve Cycle Test,Valve B32-F031A Failed in Closed Position Requiring Pump a to Be Secured.Caused by Stuck 42 Auxiliary Contactor.Contractor Realigned
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 21:32, 23 January 2020

Forwards LER 78-015/03L-0
Date released: 09/17/2019 Download: ML19246B067


LER 78-015/03L-0 on 780205:during Reactor Recirculation Pump Discharge Valve Cycle Test,Valve B32-F031A Failed in Closed Position Requiring Pump a to Be Secured.Caused by Stuck 42 Auxiliary Contactor.Contractor Realigned
ML19246B068
Person / Time
Site: Brunswick 
Issue date: 02/23/1978
From:
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246B068 (2)
Forwards LER 78-015/03L-0
ML19246B066
Person / Time
Site: Brunswick 
Issue date: 02/23/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246B066 (1)