ML19246B067

From kanterella
Jump to navigation Jump to search
Forwards LER 78-015/03L-0
Date released: 09/17/2019 Download: ML19246B067


LER 78-015/03L-0 on 780205:during Reactor Recirculation Pump Discharge Valve Cycle Test,Valve B32-F031A Failed in Closed Position Requiring Pump a to Be Secured.Caused by Stuck 42 Auxiliary Contactor.Contractor Realigned
ML19246B068
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/23/1978
From:
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246B068 (2)
Forwards LER 78-015/03L-0
ML19246B066
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/23/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19246B066 (1)