ML19249D809: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19249D811 | | number = ML19249D811 | ||
| issue date = 09/20/1979 | | issue date = 09/20/1979 | ||
| title = | | title = LER 79-063/03L-0:on 790824,daily Core Parameter Check Hat Revealed That Linear Heat Generation Rate Was 13.69 Kw/Ft or Greater than Allowable Max of 13.4 Kw/Ft.Caused by Not Completing All Preventive Measures of LER 1-79-022 | ||
| author name = Tollison A | | author name = Tollison A | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. |
Latest revision as of 21:10, 23 January 2020
Date released: 09/20/2019 | Download: ML19249D809 |
---|---|
ML19249D811 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 09/20/1979 |
From: | Tollison A CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19249D811 (1) | |
ML19249D808 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 09/20/1979 |
From: | Banks H CAROLINA POWER & LIGHT CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19249D808 (1) | |