ML19256E801: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256E814
| number = ML19256E814
| issue date = 11/02/1979
| issue date = 11/02/1979
| title = Forwards LER 79-087/01T-3
| title = LER 79-087/01T-3:on 791026,pipe Stress at 3X2 Reducer on Motor Thrust Bearing Cooler Outlet RCP-1A Exceeded FSAR Required Allowable Stress.Caused by Inadequate Design.Mod Initiated to Add Restraint to Reduce Pipe Stress at Reducer
| author name = Cooper J
| author name = Cooper J
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.

Latest revision as of 17:34, 23 January 2020

Forwards LER 79-087/01T-3
Date released: 09/27/2019 Download: ML19256E801


LER 79-087/01T-3:on 791026,pipe Stress at 3X2 Reducer on Motor Thrust Bearing Cooler Outlet RCP-1A Exceeded FSAR Required Allowable Stress.Caused by Inadequate Design.Mod Initiated to Add Restraint to Reduce Pipe Stress at Reducer
ML19256E814
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/02/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256E814 (2)
Forwards LER 79-087/01T-3
ML19256E800
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/08/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256E800 (1)