ML19257C480: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19257C492 | | number = ML19257C492 | ||
| issue date = 01/24/1980 | | issue date = 01/24/1980 | ||
| title = | | title = LER 80-010/01T-0:on 800111,during Review for IE Bulletin 79-14,S&W Found Stress on Vertical Rod Hangers SW-H-162A & SW-H-160A to Be Over Design Allowable.Caused by Incorrect Valve Weights Used in Pipe Support Design Calculations | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
Line 21: | Line 21: | ||
| number = ML19257C491 | | number = ML19257C491 | ||
| issue date = 01/24/1980 | | issue date = 01/24/1980 | ||
| title = | | title = LER 80-008/01T-0:on 800111,during Review for IE Circular 78-08,S&W Found Control Room Air Conditioning Chiller Units Control Panel Not Qualified to Seismic Category I Requirements.Cause Unknown.Vendor Reviewing Components | ||
| author name = Cartwright W | | author name = Cartwright W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
Latest revision as of 16:14, 23 January 2020
Date released: 09/28/2019 | Download: ML19257C480 |
---|---|
ML19257C492 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 01/24/1980 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19257C492 (2) | |
ML19257C491 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 01/24/1980 |
From: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19257C491 (2) | |
ML19257C479 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 01/25/1980 |
From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19257C479 (1) | |