ML19257C644: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19257C645
| number = ML19257C645
| issue date = 01/18/1980
| issue date = 01/18/1980
| title = Forwards LER 79-114/03L-0
| title = LER 79-114/03L-0:on 791227,while Performing PT1.1.12PC,main Steam Line High Radiation Functional Check Drawer 1-D12-K603B Found Out of Calibr.Caused by Instrument Drift. Drawer Recalibr & Returned to Svc
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 16:05, 23 January 2020

Forwards LER 79-114/03L-0
Date released: 09/28/2019 Download: ML19257C644


LER 79-114/03L-0:on 791227,while Performing PT1.1.12PC,main Steam Line High Radiation Functional Check Drawer 1-D12-K603B Found Out of Calibr.Caused by Instrument Drift. Drawer Recalibr & Returned to Svc
ML19257C645
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/18/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257C645 (1)
Forwards LER 79-114/03L-0
ML19257C643
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/18/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257C643 (1)