ML19263D756: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19263D761 | | number = ML19263D761 | ||
| issue date = 04/02/1979 | | issue date = 04/02/1979 | ||
| title = | | title = LER 79-024/03L-0 on 790315:during Plant Heatup,Discovered That Temp Device at 175 Ft Elevation of Meteorological Monitoring Tower Was Inoperable.Cause Unknown.Temp Device Tested Satisfactorily & Returned to Svc | ||
| author name = Cooper J | | author name = Cooper J | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. |
Latest revision as of 10:52, 23 January 2020
Date released: 10/04/2019 | Download: ML19263D756 |
---|---|
ML19263D761 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 04/02/1979 |
From: | Cooper J FLORIDA POWER CORP. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19263D761 (2) | |
ML19263D755 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 04/05/1979 |
From: | Stewart W FLORIDA POWER CORP. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19263D755 (1) | |