ML19263D756

From kanterella
Jump to navigation Jump to search
Forwards LER 79-024/03L-0
Date released: 10/04/2019 Download: ML19263D756


LER 79-024/03L-0 on 790315:during Plant Heatup,Discovered That Temp Device at 175 Ft Elevation of Meteorological Monitoring Tower Was Inoperable.Cause Unknown.Temp Device Tested Satisfactorily & Returned to Svc
ML19263D761
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/02/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263D761 (2)
Forwards LER 79-024/03L-0
ML19263D755
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/05/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263D755 (1)