ML093030229: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML093030229
| number = ML093030229
| issue date = 10/30/2009
| issue date = 10/30/2009
| title = 2009/10/30-NRC Staff Transmittal Letter Dated October 30, 2009, Attachment 3, Affidavit of Elaine M. Keegan
| title = NRC Staff Transmittal Letter Dated October 30, 2009, Attachment 3, Affidavit of Elaine M. Keegan
| author name = Keegan E
| author name = Keegan E
| author affiliation = NRC/NRR/DLR
| author affiliation = NRC/NRR/DLR

Latest revision as of 22:37, 6 December 2019

NRC Staff Transmittal Letter Dated October 30, 2009, Attachment 3, Affidavit of Elaine M. Keegan
ML093030229
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/30/2009
From: Keegan E
Division of License Renewal
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML093030221 List:
References
50-282-LR, 50-306-LR, ASLBP 08-871-01-LR, RAS 16585
Download: ML093030229 (2)


Text

In the Matter of NORTHERN STATES POWER CO.

(Prairie Island Nuclear Generating Plant, Units 1 and 2)

Docket Nos. 50-282-LR and 50-306-LR; ASLBP No. 08-871-01-LR NRC Staff Transmittal Letter dated October 30, 2009 Attachment 3 Affidavit of Elaine M. Keegan

October 30, 2009 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

1 NORTHERN STATES POWER CO. ) Docket Nos. 50-282-LRI 50-306-LR

)

(Prairie Island Nuclear Generating Plant )

Units 1 and 2)

AFFIDAVIT OF ELAINE M. KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. 5 2.336(b)

I, Elaine M. Keegan, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Prairie Island Nuclear Generating Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures for environmental i s s ~ ~ einsconnection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the environmental issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. 5 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of October 16, 2009.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Elaine M. Keegan Executed in Rockville, Maryland this 3othday of October, 2009