ML15048A112: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15048A112 | | number = ML15048A112 | ||
| issue date = 02/17/2015 | | issue date = 02/17/2015 | ||
| title = | | title = Notification of NRC Initial Operator Licensing Examination 05000285/2015301 | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Cortopassi L | | addressee name = Cortopassi L | ||
Line 13: | Line 13: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000285/2015301]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:February 17, 2015 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD | |||
Mr. | ARLINGTON, TX 76011-4511 | ||
February 17, 2015 | |||
Mr. Lou Cortopassi, Vice President | |||
and Chief Nuclear Officer | |||
Omaha Public Power District | |||
Fort Calhoun Station FC-2-4 | |||
P.O. Box 550 | |||
Fort Calhoun, NE 68023-0550 | |||
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR | |||
LICENSING EXAMINATION 05000285/2015301 | |||
Dear Mr. Cortopassi: | |||
In a telephone conversation on February 5, 2015, between Messrs. E. Linzer, Licensed | |||
Operator Initial Training Supervisor, and C. Osterholtz, Chief Examiner, arrangements were | |||
made for the administration of licensing examinations at Fort Calhoun Station during the week | |||
of December 14, 2015. | |||
As agreed during the telephone conversation, your staff will prepare the examinations based on | |||
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power | |||
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power | |||
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your | |||
staff any changes that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | |||
examination outlines by September 25, 2015. The written examinations, operating tests, | |||
and supporting reference materials identified in Attachment 3 to ES-201 will be due by | |||
October 23, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations | |||
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | |||
outlines, examinations, and tests before they are submitted to the NRC for review and approval. | |||
All materials shall be complete and ready-to-use. We request that any personal, proprietary, | |||
sensitive unclassified, or safeguards information in your response be contained in a separate | |||
enclosure and appropriately marked. Any delay in receiving the required examinations and | |||
reference materials, or the submittal of inadequate or incomplete materials, may cause the | |||
examinations to be rescheduled. In addition, your support for on-site validation of the | |||
examinations is required during the week of November 16, 2015. | |||
L. Cortopassi -2- | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval | |||
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | |||
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | |||
date, a postponement may be necessary. Signed applications certifying that all training has | |||
been completed should be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501, et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | |||
this collection of information is estimated to average 2,500 hours per response, including the | |||
time for reviewing instructions, gathering and maintaining the data needed, writing the | |||
examinations, and completing and reviewing the collection of information. Send comments on | |||
any aspect of this collection of information, including suggestions for reducing the burden, to the | |||
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, | |||
Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk | |||
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of | |||
Management and Budget, Washington, DC 20503. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
L. Cortopassi -3- | |||
Thank you for your cooperation in this matter. Mr. Linzer has been advised of the policies and | |||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at | |||
817-200-1159. | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No. 50-285 | |||
License No. DPR-40 | |||
cc: Electronic Distribution | |||
ML15048A112 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | |||
By: VGaddy Yes No Non-Publicly Available Sensitive NRC-002 | |||
OFFICE SOE:OB C:OB | |||
NAME COsterholtz/dch VGaddy | |||
SIGNATURE /RA/ /RA/ | |||
DATE 2/12/15 2/17/15 | |||
Letter to Lou Cortopassi from Vincent G. Gaddy, dated February 17, 2015 | |||
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR | |||
LICENSING EXAMINATION 05000285/2015301 | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Max.Schneider@nrc.gov) | |||
Resident Inspector (Brian.Cummings@nrc.gov) | |||
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov) | |||
Project Engineer, DRP (Jan.Tice@nrc.gov) | |||
FCS Administrative Assistant (Janise.Schwee@nrc.gov) | |||
RIV Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
RIV Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
NRR Project Manager (Fred.Lyon@nrc.gov) | |||
RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
RIV RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
RIV Regional Counsel (Karla.Fuller@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
OEWebResource@nrc.gov | |||
OEWEB Resource (Sue.Bogle@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
RIV/ETA: OEDO (Michael.Waters@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
DISTRIBUTION | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Max.Schneider@nrc.gov) | |||
Resident Inspector (Brian.Cummings@nrc.gov) | |||
Project Engineer, DRP (Jan.Tice@nrc.gov) | |||
FCS Administrative Assistant (Janise.Schwee@nrc.gov) | |||
RIV Public Affairs Officer (Victor.Dricks@nrc.gov) RIV Public Affairs Officer (Lara.Uselding@nrc.gov) NRR Project Manager (Fred.Lyon@nrc.gov) | |||
RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
RIV RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
RIV Regional Counsel (Karla.Fuller@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) OEWebResource@nrc.gov | |||
OEWEB Resource (Sue.Bogle@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
RIV/ETA: OEDO (Michael.Waters@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
}} | }} |
Latest revision as of 02:30, 5 December 2019
ML15048A112 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 02/17/2015 |
From: | Vincent Gaddy Operations Branch IV |
To: | Cortopassi L Omaha Public Power District |
References | |
Download: ML15048A112 (5) | |
See also: IR 05000285/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
February 17, 2015
Mr. Lou Cortopassi, Vice President
and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000285/2015301
Dear Mr. Cortopassi:
In a telephone conversation on February 5, 2015, between Messrs. E. Linzer, Licensed
Operator Initial Training Supervisor, and C. Osterholtz, Chief Examiner, arrangements were
made for the administration of licensing examinations at Fort Calhoun Station during the week
of December 14, 2015.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
examination outlines by September 25, 2015. The written examinations, operating tests,
and supporting reference materials identified in Attachment 3 to ES-201 will be due by
October 23, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of November 16, 2015.
L. Cortopassi -2-
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501, et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of
Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
L. Cortopassi -3-
Thank you for your cooperation in this matter. Mr. Linzer has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at
817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-285
License No. DPR-40
cc: Electronic Distribution
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: VGaddy Yes No Non-Publicly Available Sensitive NRC-002
OFFICE SOE:OB C:OB
NAME COsterholtz/dch VGaddy
SIGNATURE /RA/ /RA/
DATE 2/12/15 2/17/15
Letter to Lou Cortopassi from Vincent G. Gaddy, dated February 17, 2015
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000285/2015301
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP (Jan.Tice@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWebResource@nrc.gov
OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)