(11 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15239B452 | | | number = ML15239B452 |
| | issue date = 08/26/2015 | | | issue date = 08/26/2015 |
| | title = VOGTLE Nuclear Plant - Operator Licensing Examination Approval 05000424/2015301 and 05000425/2015301 | | | title = Vogtle Nuclear Plant - Operator Licensing Examination Approval 05000424/2015301 and 05000425/2015301 |
| | author name = Guthrie E F | | | author name = Guthrie E |
| | author affiliation = NRC/RGN-II/DRS/OLB | | | author affiliation = NRC/RGN-II/DRS/OLB |
| | addressee name = Stiles D C | | | addressee name = Stiles D |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000424/2015301]] | | See also: [[see also::IR 05000424/2015301]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES |
| [[Issue date::August 26, 2015]]
| | NUCLEAR REGULATORY COMMISSION |
| | | REGION II |
| | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 |
| | ATLANTA, GEORGIA 30303-1257 |
| | August 26, 2015 |
| Southern Nuclear Operating Company, Inc. | | Southern Nuclear Operating Company, Inc. |
| | ATTN: Mr. Darren C. Stiles |
| | Training Manager |
| | Vogtle Electric Generating Plant |
| | 7821 River Road |
| | Bin 63030 |
| | Waynesboro, GA 30830-2965 |
| | SUBJECT: VOGTLE NUCLEAR POWER PLANT - OPERATOR LICENSING |
| | EXAMINATION APPROVAL 05000424/2015301 AND 05000425/2015301 |
| | Dear Mr. Stiles: |
| | The purpose of this letter is to confirm the final arrangements for the upcoming operator |
| | licensing examination at the Vogtle Nuclear Power Plant. |
| | The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator |
| | license applications submitted in connection with this examination and separately provided a list |
| | of approved applicants to your office. The NRC staff will administer the operating tests to |
| | individuals, as applicable, the weeks of August 31, 2015, and September 14, 2015. Note that |
| | any examination waivers and application denials have been addressed in separate |
| | correspondence. |
| | The NRC has approved the subject written examination and hereby authorizes you to |
| | administer the written examination in accordance with Revision 10, Supplement 1, of NUREG- |
| | 1021, Operator Licensing Examination Standards for Power Reactors, the week of |
| | September 21, 2015. |
| | This examination has undergone extensive review by my staff and representatives responsible |
| | for operator training at your facility. Based on this review, I have concluded that the |
| | examination meets the guidelines of NUREG-1021 for content, operational, and discrimination |
| | validity. By administering this examination, you also agree that it meets NUREG-1021 |
| | guidelines, and is appropriate for measuring the qualifications of licensed operators at your |
| | facility. If you determine that this examination is not appropriate for licensing operators at your |
| | facility, do not administer the examination and contact me at (404) 997-4662. |
|
| |
|
| ATTN: Mr. Darren Training Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965
| | D. Stiles 2 |
| | | Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642, if you have any |
| SUBJECT: VOGTLE NUCLEAR POWER PLANT - OPERATOR LICENSING EXAMINATION APPROVAL 05000424/2015301 AND 05000425/2015301
| | questions or identify any errors or changes in license level (RO or SRO) or type of examination |
| | | (written examination) specified for each applicant on the list of approved applicants. |
| ==Dear Mr. Stiles:==
| | Sincerely, |
| The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examination at the Vogtle Nuclear Power Plant.
| | /RA/ |
| | | Eugene F. Guthrie, Chief |
| The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff will administer the operating tests to individuals, as applicable, the weeks of August 31, 2015, and September 14, 2015. Note that any examination waivers and application denials have been addressed in separate correspondence.
| | Operations Branch 2 |
| | | Division of Reactor Safety |
| The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 10, Supplement 1, of NUREG-
| | Docket Nos.: 50-424, 50-425 |
| 1021, "Operator Licensing Examination Standards for Power Reactors," the week of September 21, 2015.
| | License Nos.: NPF-68, NPF-81 |
| | |
| This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4662. Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642, if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (written examination) specified for each applicant on the list of approved applicants.
| |
| | |
| Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81 Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642, if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (written examination) specified for each applicant on the list of approved applicants. | |
|
| |
|
| Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
| |
|
| |
|
| X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML15239B452 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE RSB EFG NAME RBALDWIN EGUTHRIE DATE 8/25/2015 8/26/2015 E-MAIL COPY? YES NO YES NO OFFICIAL RECORD COPY
| | ML15239B452 X SUNSI REVIEW COMPLETE |
| | OFFICE RII:DRS RII:DRS |
| | SIGNATURE RSB EFG |
| | NAME RBALDWIN EGUTHRIE |
| | DATE 8/25/2015 8/26/2015 |
| | E-MAIL COPY? YES NO YES NO |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARNL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report ML24030A9092024-04-10010 April 2024 Issuance of Amendment Nos. 224 and 207, Regarding Revision to Technical Specification 3.4.14 (Reactor Coolant System) Pressure Isolation Valve Leakage Surveillance Requirement 3.4.14.1 ML24079A0062024-04-10010 April 2024 – Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML24096A1322024-04-0505 April 2024 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing and Order (EPID L-2024-LLA-0043) - Letter NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0128, License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency2024-04-0404 April 2024 License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0112, Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards2024-03-28028 March 2024 Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards NL-24-0098, Report on Status of Decommissioning Funding2024-03-28028 March 2024 Report on Status of Decommissioning Funding NL-24-0097, Exemption Request: Final Safety Analysis Report Update Schedule2024-03-22022 March 2024 Exemption Request: Final Safety Analysis Report Update Schedule NL-22-0267, License Amendment Request to Revise Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, AC Sources – Operating, Surveillance Requirements2024-03-20020 March 2024 License Amendment Request to Revise Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, AC Sources – Operating, Surveillance Requirements ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) 2024-09-09
[Table view] |
See also: IR 05000424/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
August 26, 2015
Southern Nuclear Operating Company, Inc.
ATTN: Mr. Darren C. Stiles
Training Manager
Vogtle Electric Generating Plant
7821 River Road
Bin 63030
Waynesboro, GA 30830-2965
SUBJECT: VOGTLE NUCLEAR POWER PLANT - OPERATOR LICENSING
EXAMINATION APPROVAL 05000424/2015301 AND 05000425/2015301
Dear Mr. Stiles:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examination at the Vogtle Nuclear Power Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator
license applications submitted in connection with this examination and separately provided a list
of approved applicants to your office. The NRC staff will administer the operating tests to
individuals, as applicable, the weeks of August 31, 2015, and September 14, 2015. Note that
any examination waivers and application denials have been addressed in separate
correspondence.
The NRC has approved the subject written examination and hereby authorizes you to
administer the written examination in accordance with Revision 10, Supplement 1, of NUREG-
1021, Operator Licensing Examination Standards for Power Reactors, the week of
September 21, 2015.
This examination has undergone extensive review by my staff and representatives responsible
for operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operators at your
facility. If you determine that this examination is not appropriate for licensing operators at your
facility, do not administer the examination and contact me at (404) 997-4662.
D. Stiles 2
Please contact the Chief Examiner, Mr. Richard S. Baldwin, at (404) 997-4642, if you have any
questions or identify any errors or changes in license level (RO or SRO) or type of examination
(written examination) specified for each applicant on the list of approved applicants.
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
ML15239B452 X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS
SIGNATURE RSB EFG
NAME RBALDWIN EGUTHRIE
DATE 8/25/2015 8/26/2015
E-MAIL COPY? YES NO YES NO