ML18317A402: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML18317A402 | |||
| issue date = 11/13/2018 | |||
| title = Notice of Significant Public Licensee Meeting Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, to Discuss an Apparent Violation and Preliminary White Finding as Documented in IR 05000461/2018051 | |||
| author name = Riemer K | |||
| author affiliation = NRC/RGN-III/DRP/B1 | |||
| addressee name = | |||
| addressee affiliation = | |||
| docket = 05000461 | |||
| license number = NPF-062 | |||
| contact person = | |||
| document report number = IR 2018051 | |||
| document type = Meeting Notice | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000461/2018051]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
2443 WARRENVILLE RD. SUITE 210 | |||
LISLE, ILLINOIS 60532-4352 | |||
November 13, 2018 | |||
NOTICE OF SIGNIFICANT LICENSEE MEETING | |||
THIS MEETING IS OPEN TO PUBLIC ATTENDANCE | |||
Name of Licensee: Exelon Generation Company, LLC | |||
Name of Facility: Clinton Power Station, Unit 1 | |||
Docket Nos: 50-461 | |||
Time and Date: Friday, November 30, 2018 | |||
1:00 to 4:00 PM (CST) | |||
Location: U.S. Nuclear Regulatory Commission, Region III | |||
2443 Warrenville Road | |||
Suite 210 | |||
Lisle, IL 60532-4351 | |||
Teleconference: Bridgeline Passcode | |||
877-952-8632 13959 | |||
Purpose: A regulatory conference will be held between the | |||
U.S. Nuclear Regulatory Commission (NRC) and Exelon | |||
Generation Company, LLC, to discuss an apparent | |||
violation and preliminary White finding concerning the | |||
licensees failure to follow multiple procedures that affected | |||
quality causing the Division 2 Emergency Diesel Generator | |||
to be both inoperable and unavailable when it was relied | |||
upon for plant safety. This issue has been preliminarily | |||
determined to be of low-to-moderate significance as | |||
documented in Inspection Report 05000461/2018051. | |||
Meeting Category: This is a Category 1 Meeting. The public is invited to | |||
observe this meeting and will have one or more | |||
opportunities to communicate with the NRC after the | |||
business portion of the meeting but before the meeting is | |||
adjourned. | |||
Notice of Significant -2- | |||
Licensee Meeting | |||
NRC Attendees: Steven West, Regional Administrator, RIII | |||
Patrick Louden, Director, Division of Reactor | |||
Projects (DRP) | |||
Julio Lara, Deputy Director, DRP | |||
Kenneth OBrien, Director, Divison of Reactor | |||
Safety (DRS) | |||
Mohammed Shuaibi, Deputy Director, DRS | |||
Laura Kozak, Senior Reactor Analyst, DRP | |||
Kenneth Riemer, Chief, DRP Branch 1 | |||
Karla Stoedter, Chief, DRS Engineering Branch 2 | |||
Others as Designated | |||
Licensee Attendees: Dan Enright, Senior Vice President, Operations | |||
Brad Fewell, Senior Vice President, Regulatory Affairs & | |||
General Counsel | |||
Scot Greenlee, Senior Vice President, Engineering & | |||
Technical Services | |||
George Gellrich, Vice President, Licensing and | |||
Regulatory Affairs | |||
Shane Marik, Vice President, Fleet Support | |||
Ted Stoner, Site Vice President | |||
Brad Kapellas, Plant Manager | |||
Jeff Stone, Director, Risk Management | |||
Johnny Weissinger, Director, Operations | |||
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be | |||
made known to Ken Riemer at 630-829-9628 by November 21, 2018. | |||
The NRC provides reasonable accommodation to individuals with disabilities where | |||
appropriate. If you need a reasonable accommodation to participate in this meeting, or | |||
need this meeting notice or the transcript or other information from the meeting in | |||
another format (e.g., braille, large print), please notify the NRCs meeting coordinator. | |||
Determinations on requests for reasonable accommodation will be made on a case-by- | |||
case basis. | |||
Because meetings are sometimes canceled or rescheduled as a result of unforeseen | |||
circumstances, such as severe weather, confirm the meeting schedule with the meeting | |||
contact. | |||
Approved By: /RA/ | |||
Kenneth Riemer, Chief | |||
Branch 1 | |||
Division of Reactor Projects | |||
Meeting Contact: Kenneth Riemer | |||
Chief, Branch 1 | |||
630-829-9628 | |||
Kenneth.Riemer@nrc.gov | |||
Notice of Significant -3- | |||
Licensee Meeting | |||
DISTRIBUTION: | |||
Christopher Cook, Region III Coordinator, OEDO | |||
Michael King, Deputy Director, Division of Inspection and Regional Support, NRR | |||
RidsNrrDorlLpl3 | |||
RidsNrrPMClinton Resource | |||
Steven West, Regional Administrator, RIII | |||
Darrell Roberts, Deputy Regional Administrator, RIII | |||
Patrick Louden, Director, Division of Reactor Projects, RIII | |||
Julio Lara, Deputy Director, Division of Reactor Projects, RIII | |||
Kenneth OBrien, Director, Division of Reactor Safety, RIII | |||
Mohammed Shuaibi, Deputy Director, Division of Reactor Safety, RIII | |||
Kenneth Riemer, DRP Branch Chief | |||
Elba Sanchez Santiago, SRI, Clinton | |||
DRS Branch Chiefs: | |||
Robert Daley | |||
Steven Orth | |||
David Hills | |||
Robert Orlikowski | |||
Karla Stoedter | |||
Jamnes Cameron, Enforcement/Investigations Officer | |||
Allan Barker, Regional State Liaison Officer, RIII | |||
Viktoria Mitlyng, RIII Public Affairs | |||
Prema Chandrathil, RIII Public Affairs | |||
ADAMS Accession Number: ML18317A402 | |||
OFFICE RIII | |||
NAME KRiemer:lg | |||
DATE 11/13/2018 | |||
OFFICIAL RECORD COPY | |||
}} |
Latest revision as of 07:02, 30 November 2019
ML18317A402 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 11/13/2018 |
From: | Kenneth Riemer NRC/RGN-III/DRP/B1 |
To: | |
References | |
IR 2018051 | |
Download: ML18317A402 (3) | |
See also: IR 05000461/2018051
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, ILLINOIS 60532-4352
November 13, 2018
NOTICE OF SIGNIFICANT LICENSEE MEETING
THIS MEETING IS OPEN TO PUBLIC ATTENDANCE
Name of Licensee: Exelon Generation Company, LLC
Name of Facility: Clinton Power Station, Unit 1
Docket Nos: 50-461
Time and Date: Friday, November 30, 2018
Location: U.S. Nuclear Regulatory Commission, Region III
2443 Warrenville Road
Suite 210
Lisle, IL 60532-4351
Teleconference: Bridgeline Passcode
877-952-8632 13959
Purpose: A regulatory conference will be held between the
U.S. Nuclear Regulatory Commission (NRC) and Exelon
Generation Company, LLC, to discuss an apparent
violation and preliminary White finding concerning the
licensees failure to follow multiple procedures that affected
quality causing the Division 2 Emergency Diesel Generator
to be both inoperable and unavailable when it was relied
upon for plant safety. This issue has been preliminarily
determined to be of low-to-moderate significance as
documented in Inspection Report 05000461/2018051.
Meeting Category: This is a Category 1 Meeting. The public is invited to
observe this meeting and will have one or more
opportunities to communicate with the NRC after the
business portion of the meeting but before the meeting is
adjourned.
Notice of Significant -2-
Licensee Meeting
NRC Attendees: Steven West, Regional Administrator, RIII
Patrick Louden, Director, Division of Reactor
Projects (DRP)
Julio Lara, Deputy Director, DRP
Kenneth OBrien, Director, Divison of Reactor
Safety (DRS)
Mohammed Shuaibi, Deputy Director, DRS
Laura Kozak, Senior Reactor Analyst, DRP
Kenneth Riemer, Chief, DRP Branch 1
Karla Stoedter, Chief, DRS Engineering Branch 2
Others as Designated
Licensee Attendees: Dan Enright, Senior Vice President, Operations
Brad Fewell, Senior Vice President, Regulatory Affairs &
General Counsel
Scot Greenlee, Senior Vice President, Engineering &
Technical Services
George Gellrich, Vice President, Licensing and
Regulatory Affairs
Shane Marik, Vice President, Fleet Support
Ted Stoner, Site Vice President
Brad Kapellas, Plant Manager
Jeff Stone, Director, Risk Management
Johnny Weissinger, Director, Operations
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be
made known to Ken Riemer at 630-829-9628 by November 21, 2018.
The NRC provides reasonable accommodation to individuals with disabilities where
appropriate. If you need a reasonable accommodation to participate in this meeting, or
need this meeting notice or the transcript or other information from the meeting in
another format (e.g., braille, large print), please notify the NRCs meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-
case basis.
Because meetings are sometimes canceled or rescheduled as a result of unforeseen
circumstances, such as severe weather, confirm the meeting schedule with the meeting
contact.
Approved By: /RA/
Kenneth Riemer, Chief
Branch 1
Division of Reactor Projects
Meeting Contact: Kenneth Riemer
Chief, Branch 1
630-829-9628
Kenneth.Riemer@nrc.gov
Notice of Significant -3-
Licensee Meeting
DISTRIBUTION:
Christopher Cook, Region III Coordinator, OEDO
Michael King, Deputy Director, Division of Inspection and Regional Support, NRR
RidsNrrDorlLpl3
RidsNrrPMClinton Resource
Steven West, Regional Administrator, RIII
Darrell Roberts, Deputy Regional Administrator, RIII
Patrick Louden, Director, Division of Reactor Projects, RIII
Julio Lara, Deputy Director, Division of Reactor Projects, RIII
Kenneth OBrien, Director, Division of Reactor Safety, RIII
Mohammed Shuaibi, Deputy Director, Division of Reactor Safety, RIII
Kenneth Riemer, DRP Branch Chief
Elba Sanchez Santiago, SRI, Clinton
DRS Branch Chiefs:
David Hills
Jamnes Cameron, Enforcement/Investigations Officer
Allan Barker, Regional State Liaison Officer, RIII
Viktoria Mitlyng, RIII Public Affairs
Prema Chandrathil, RIII Public Affairs
ADAMS Accession Number: ML18317A402
OFFICE RIII
NAME KRiemer:lg
DATE 11/13/2018
OFFICIAL RECORD COPY