NRC Generic Letter 1983-38: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/1983
| issue date = 10/31/1983
| title = NRC Generic Letter 1983-038: NUREG-0965, NRC Inventory of Dams.
| title = NRC Generic Letter 1983-038: NUREG-0965, NRC Inventory of Dams.
| author name = Eisenhut D G
| author name = Eisenhut D
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
{{#Wiki_filter:I a.-October 31, 1983TO ALL LICENSEES OF OPERATING POWER REACTORS AND APPLICANTS FOROPERATING LICENSEES (GENERIC LETTER 83-38)
{{#Wiki_filter:aI
. -
                                                October 31, 1983 FOR
        ALL   LICENSEES   OF OPERATING   POWER REACTORS AND APPLICANTS
    TO                                        LETTER 83-38)
      OPERATING LICENSEES (GENERIC
                                                        DAMS"
    SUBJECT:      NUREG-0965, "NRC INVENTORY OF
                                                                                            which describes is a copy of the subject report Enclosed for your information Program. The information provided in this in detail the NRC Dam Safety                                                                  The obtained  from  NRC files  such as safety analysis reports. any way, report was                                  to identify all dams that ofcould,              in primary purpose of the report iscontext            of  the  Guidelines              the Federal be considered "NRC dams" in the1). A secondary purpose is to identify the Dam Safety Program (Reference                    may be applicable and for which the dams for which the Federal Guidelines NRC might be considered "responsible".
                                                                                                        if this  report  is  provided  for information only; however, As stated above                                  please inform the Dam Safety Officer, you find that some data is incorrect,          Manager for your            plant.


SUBJECT: NUREG-0965, "NRC INVENTORY OF DAMS"Enclosed for your information is a copy of the subject report which describesin detail the NRC Dam Safety Program. The information provided in thisreport was obtained from NRC files such as safety analysis reports. Theprimary purpose of the report is to identify all dams that could, in any way,be considered "NRC dams" in the context of the Guidelines of the FederalDam Safety Program (Reference 1). A secondary purpose is to identify thedams for which the Federal Guidelines may be applicable and for which theNRC might be considered "responsible".As stated above this report is provided for information only; however, ifyou find that some data is incorrect, please inform the Dam Safety Officer,Mr. George E. Lear, via the Project Manager for your plant.rs i. '.''!isenhutDarrell G. Eisenhut, DirectorDivision of LicensingOffice of Nuclear Reactor RegulationReference 1:Federal Coordinating Council for Science, Engineering andTechnology, "Federal Guidelines for Dam Safety", June 25, 1979.a. 'ORB#1#P.Tam v# / /ORB#1:DLSVarga *K09/ /83AD DL dI D /83se et8310310403scrcsa6LtGcVrDetNItL Se-re.O COACI~re4 ct./
Mr. George E. Lear, via the Project rs i. '.''!isenhut Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation and
It-TO ALL LICENSEES OF OPERATING POWER REACTORS AND APPLICANTS FOROPERATING LICENSEES (GENERIC LETTER 83- )SUBJECT: NUREG-0965, "NRC INVENTORY OF DAMS"Enclosed for your information is a copy of the subject report which describesin detail the NRC Dam Safety Program. The information provided in thisreport was obtained from NRC files such as safety analysis reports. Theprimary purpose of the report is to identify all dams that could, in any way,be considered "NRC dams" in the context of the Guidelines of the FederalDam Safety Program (Reference 1). A secondary purpose is to identify thedams for which the Federal Guidelines may be applicable and for which theNRC might be considered "responsible".As stated above this report is provided for information only; however, ifyou find that some data is incorrect, please inform the Dam Safety Officervia the Project Manager for your plant.Darrell G. Eisenhut, DirectorDivision of LicensingOffice of Nuclear Reactor RegulationReference 1:Federal Coordinating Council for Science, Engineering andTechnology, "Federal Guidelines for Dam Safety", June 25, 1979.8310310403.AJ-, ,ofs~r/.ORB#12LPTam/l fiDL/83AD/OR: DLGLainas09/ /83D: DLDEisenhut09/ /83Is414iLeer-ID 1/PAile/}}
                      1: Federal   Coordinating   Council for Science, Engineering 25, 1979.
 
Reference                                                  for Dam Safety",           June Technology, "Federal Guidelines
                                                                                                      '
                          a.
 
8310310403 scrcsa
                                                                                              6LtGcVr    Det N
                            ORB#1:DL            AD      DL    d ORB#1#
          P.Tam   v         SVarga *K
                            09/ /83            ID  /83
        #   / /
          ItLSe-re.O           COACI~re4 ct.   se et
                                                                                                                /
 
I
  t- AND APPLICANTS FOR
    TO ALL LICENSEES OF OPERATING POWER REACTORS)
        OPERATING LICENSEES (GENERIC LETTER   83- SUBJECT:   NUREG-0965, "NRC INVENTORY OF DAMS"
                                                    the subject report which describes Enclosed for your information is a copy of information provided in this in detail the NRC Dam Safety Program. The safety analysis reports. The report was obtained from NRC files such as       all dams that could, in any way, primary purpose of the report is to identifythe Guidelines of the Federal be considered "NRC dams" in the context of         purpose is to identify the Dam Safety Program (Reference 1). A secondary     applicable and for which the dams for which the Federal Guidelines may be NRC might be considered "responsible".
                                                      information only; however, if As stated above this report is provided for inform the Dam Safety Officer you find that some data is incorrect, please via the Project Manager for your plant.
 
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation for Science, Engineering and Reference 1: Federal Coordinating Council                           June 25, 1979.
 
Technology, "Federal Guidelines for Dam Safety",
                                                                      8310310403
        .AJ-, ,ofs~r/.                                                   Is4 iDL      AD/OR: DL        D: DL
        ORB#12L                                          DEisenhut      14iLeer- PTam/l f                        GLainas
                              /83      09/ /83          09/ /83      ID 1/PAile/}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 04:14, 24 November 2019

NRC Generic Letter 1983-038: NUREG-0965, NRC Inventory of Dams.
ML031080533
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, 05000371, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Skagit, Marble Hill
Issue date: 10/31/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
NUREG-0965 GL-83-038, NUDOCS 8310310403
Download: ML031080533 (2)


aI

. -

October 31, 1983 FOR

ALL LICENSEES OF OPERATING POWER REACTORS AND APPLICANTS

TO LETTER 83-38)

OPERATING LICENSEES (GENERIC

DAMS"

SUBJECT: NUREG-0965, "NRC INVENTORY OF

which describes is a copy of the subject report Enclosed for your information Program. The information provided in this in detail the NRC Dam Safety The obtained from NRC files such as safety analysis reports. any way, report was to identify all dams that ofcould, in primary purpose of the report iscontext of the Guidelines the Federal be considered "NRC dams" in the1). A secondary purpose is to identify the Dam Safety Program (Reference may be applicable and for which the dams for which the Federal Guidelines NRC might be considered "responsible".

if this report is provided for information only; however, As stated above please inform the Dam Safety Officer, you find that some data is incorrect, Manager for your plant.

Mr. George E. Lear, via the Project rs i. '.!isenhut Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation and

1: Federal Coordinating Council for Science, Engineering 25, 1979.

Reference for Dam Safety", June Technology, "Federal Guidelines

'

a.

8310310403 scrcsa

6LtGcVr Det N

ORB#1:DL AD DL d ORB#1#

P.Tam v SVarga *K

09/ /83 ID /83

  1. / /

ItLSe-re.O COACI~re4 ct. se et

/

I

t- AND APPLICANTS FOR

TO ALL LICENSEES OF OPERATING POWER REACTORS)

OPERATING LICENSEES (GENERIC LETTER 83- SUBJECT: NUREG-0965, "NRC INVENTORY OF DAMS"

the subject report which describes Enclosed for your information is a copy of information provided in this in detail the NRC Dam Safety Program. The safety analysis reports. The report was obtained from NRC files such as all dams that could, in any way, primary purpose of the report is to identifythe Guidelines of the Federal be considered "NRC dams" in the context of purpose is to identify the Dam Safety Program (Reference 1). A secondary applicable and for which the dams for which the Federal Guidelines may be NRC might be considered "responsible".

information only; however, if As stated above this report is provided for inform the Dam Safety Officer you find that some data is incorrect, please via the Project Manager for your plant.

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation for Science, Engineering and Reference 1: Federal Coordinating Council June 25, 1979.

Technology, "Federal Guidelines for Dam Safety",

8310310403

.AJ-, ,ofs~r/. Is4 iDL AD/OR: DL D: DL

ORB#12L DEisenhut 14iLeer- PTam/l f GLainas

/83 09/ /83 09/ /83 ID 1/PAile/

Template:GL-Nav