| title = NRC Generic Letter 1981-040: Qualifications of Reactor Operators
| title = NRC Generic Letter 1981-040: Qualifications of Reactor Operators
| author name = Eisenhut D G
| author name = Eisenhut D
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:-ALL POWER REACTOR LICENSEES, APPLICANTS  
{{#Wiki_filter:-
FOR OPERATING  
            ALL POWER REACTOR LICENSEES, APPLICANTS FOR OPERATING LICENSE, NSSS VENDORS,
LICENSE, NSSS VENDORS, REACTOR VENDORS AND ARCHITECT  
              REACTOR VENDORS AND ARCHITECT ENGINEERS
ENGINEERS Gentlemen:
              Gentlemen:
SubJect: Qualifications of Reactor Operators  
              SubJect:             Qualifications of Reactor Operators - License Examinations (Generic Letter 81-40)
-License Examinations (Generic Letter 81-40)In letters dated September  
              In letters dated September 13, 1979 and March 28, 1980, we informed you of pro- posed recommendations and revised criteria to be used by the staff in evaluating reactor operator training and licensing. We also informed you that Commission review was continuing in this area and could be expected to result in additional criteria.
13, 1979 and March 28, 1980, we informed you of pro-posed recommendations and revised criteria to be used by the staff in evaluating reactor operator training and licensing.


We also informed you that Commission review was continuing in this area and could be expected to result in additional criteria.As part of our effort, we have conducted an in-depth review of the examination process, including the scope and format of the examination.
As part of our effort, we have conducted an in-depth review of the examination process, including the scope and format of the examination. The review has resulted in several changes to our internal procedures and a revised operator and senior operator written examination.


The review has resulted in several changes to our internal procedures and a revised operator and senior operator written examination.
Both examinations will consist of five categories and have a six-hour time limit imposed. The weight given to theory is reduced from 38% in the operator written and 56% in the senior operator written, to about 25% in each. Consequently, the examination becomes less of a writing marathon than at present. Enclosure 1 presents the scope of the new examinations and how they relate to the current examinations.
 
Both examinations will consist of five categories and have a six-hour time limit imposed. The weight given to theory is reduced from 38% in the operator written and 56% in the senior operator written, to about 25% in each. Consequently, the examination becomes less of a writing marathon than at present. Enclosure  
1 presents the scope of the new examinations and how they relate to the current examinations.


In addition to the above, the senior operator written examination is restructured so that a senior operator need not take the operator written portion. Senior operator candidates who elect to sit only for this written examination will not be considered for an operator's license should they fail this examination.
In addition to the above, the senior operator written examination is restructured so that a senior operator need not take the operator written portion. Senior operator candidates who elect to sit only for this written examination will not be considered for an operator's license should they fail this examination.


We hope to initiate the administration of the new examinations early in 1982.However, we believe that it is essential to receive public comments prior to implementation.
We hope to initiate the administration of the new examinations early in 1982.


In particular, we would welcome comments on how best to schedule the implementation of this program so as to minimize disruption of ongoing train-Ing programs and staffing plans for pending operating license applicants.
However, we believe that it is essential to receive public comments prior to implementation. In particular, we would welcome comments on how best to schedule the implementation of this program so as to minimize disruption of ongoing train- Ing programs and staffing plans for pending operating license applicants. Also, we believe it is essential to have some type of controlled experiment to assure that the proposed examination will result in well-qualified licensed individuals.


Also, we believe it is essential to have some type of controlled experiment to assure that the proposed examination will result in well-qualified licensed individuals.
We welcome any suggestions regarding these experiments. We have scheduled an all-day meeting at the Holiday Inn, 8200 Wisconsin Avenue, Bethesda, Md. on January 6, 1982 at 9:00 am.


We welcome any suggestions regarding these experiments.
We plan a one-hour presentation and question/answer session. This will be followed by small roundtable discussions involving OLB examiners and industry, vendor, and members of the public to assure complete understanding of our approach Ada and answer additional questions and address individual concerns. We urge you to ,
              have representation of your training department at this meeting.                                                                                                                                  / 4
                    8112220187                                                                                                                                            8112220187 PDR MISC
              OFFICE
    OFFICO ........................
                                                        PDR,
                                        ..... ... ,................ ........ ................
                                                                                              I ........................      .........................................  ........................
                                                                                                                                                                                                    I...............  ...............
  SURNAMEIP ........  ................ ........ ................  ........................    .................................
                                                                                                                              .........................................  ........................  ........................
      DATE  . _._.__........      ... ........................    .........                  ....                          ...............                          . .    ..................  ...........
                                                                                                                                                                                                    __          .
NRC FORM 318 (10-80) NRCM 0240                                        O FFICIA L R EC O RD C OP Y                                                                                                      USGPO: ts8a-33so960


We have scheduled an all-day meeting at the Holiday Inn, 8200 Wisconsin Avenue, Bethesda, Md. on January 6, 1982 at 9:00 am.We plan a one-hour presentation and question/answer session. This will be followed by small roundtable discussions involving OLB examiners and industry, vendor, and members of the public to assure complete understanding of our approach Ada and answer additional questions and address individual concerns.
N,
                      Mr. Paul F. Collins, Chief, Operator Licensing Branch, will conduct the meeting.


We urge you to , have representation of your training department at this meeting. / 4 8112220187
Mr. Collins can be reached on (301)492-4868 ifyou require additional information.
8112220187 PDR MISC OFFICE PDR, I I OFFICO ........................
..... ... ,................
........ ................
........................
.........................................
........................
...............
...............
SURNAMEIP
........ ................
........ ................
........................
.................................
.........................................
........................
........................
DATE .... ........................
........._._.__........
.... ...............
....................
...........
__ .NRC FORM 318 (10-80) NRCM 0240 O FFICIA L R EC O RD C OP Y USGPO: ts8a-33so960
N, Mr. Paul F. Collins, Chief, Operator Licensing Branch, will conduct the meeting.Mr. Collins can be reached on (301)492-4868 if you require additional information.


Sincerely, Darrell C. Eisenhut, firector Division of Licensing Enclosure:
Sincerely, Darrell C. Eisenhut, firector Division of Licensing Enclosure:
Revised examinatiq's paper DISTRIBUTION:
                      Revised examinatiq's paper DISTRIBUTION:
OLB Rdg OLB F/F PCollins JKramer DEisenhut HDenton ECase DHFS BCs DL BCs DL ADs ORB BCs ORB PMs ORB LAs OELD (5)OI&E (7)NSIC TERA Central File NRC PDR Docket File L PDR Gray File RDiggs I .4Ir / Mfi %L L \ I. I..\9 FFICE OL~'/DHFS  
                    OLB Rdg OLB F/F
Ac W 9 Di r/D FS rDL 4XT ............  
                    PCollins JKramer DEisenhut HDenton ECase DHFS BCs DL BCs DL ADs ORB BCs ORB PMs ORB LAs OELD (5)
....... ........ .... ....P .C.o.l.l .ins ...JKramer nhut£o3/1 i /3b/81 81.................
                    OI&E (7)
1... .... .......... .._.. .......................  
                    NSIC
..... ..................
                    TERA
.....................  
                    Central File NRC PDR
..... ..................
                      Docket File L PDR
....................
                    Gray File RDiggs I
...... .................
                                                                                                                                        .
.1 _ _ _ _ _'A 318 ( tO S0) NRCM 0240 O*ICIAL RECORD COPY>431 (1080)NRCM024 OF~CIAL REC RD C PY  
          .         4Ir     /     Mfi       %L L   \   I.                                                   I.
ALL POWER REACTOR LICENSEES, APPLICANTS  
 
FOR OPERATI1Gf LICENSE, NSSS VENDORS, REACTOR VENDORS AUD ARCHITECT  
\ 9 FFICE   OL~'/DHFS
ENGINEERS Gentlemen:
                ............
Subject: Qualifications of Reactor Onfrators  
                4XT                  .......       Di r/D FS....
-License Examinations (Generic Letter 81-40)In letters dated Septenber
                                        Ac W 9........               rDL
13, 1979 and March 2`2, 198Q0 we informed you of pro-posed recommendations and revised criteria to be used by the staff in evaluating reactor operator training and licensing.
                                                                      ....                                         ..................... ..... ..................
              P        .C.o.l.l.ins...JKramer                      81 nhut                                        ..................... ..... ..................
                              £o3/1    i /3b/81
                                      1...
                                        .................
                                                      ....   ....
                                                              .._..     ......
                                                                            .. .1    _ _  _ _
                                                                                                                    .................... ...... ................
                                                                                  _
            'A 318 ( tO S0)   NRCM 0240                         O*ICIAL RECORD COPY               >431 (1080)NRCM024           OF~CIAL     RECRD C PY
 
OPERATI1Gf  LICENSE, NSSS VENDORS,
ALL POWER REACTOR LICENSEES, APPLICANTS FOR
REACTOR VENDORS AUD ARCHITECT ENGINEERS
Gentlemen:
                                                                Examinations Subject:     Qualifications of Reactor Onfrators - License (Generic Letter 81-40)
                                                    2`2, 198Q0 we informed you of pro- In letters dated Septenber 13, 1979 and March  to be used by the staff in evaluating posed recommendations and revised criteria We also informed you that Conmnission reactor   operator training and licensing.


We also informed you that Conmnission review was continuing in this area and could he expected to result in additional criteria.As part of our effort, we have conducted an in-denth review of the examination process, including the scope and format of the examination.
could he expected to result in additional review was continuing in this area and criteria.


The review has resulted in several changes to our internal Procedures and a revised operator and senior operator written examiniation.
an in-denth review of the examination As part of our effort, we have conducted of the examination. The review has process, including the scope and format          Procedures and a revised operator resulted in several changes to our internal and senior operator written examiniation.


Both examinations will consist of five categories and have a six-hour tine limit imposed. The weight given to theory is reduced from 33% in the operator written and 56% in the senior operator written, to about 25X in each. Consequently, the examination becomes less of a writing marathor than at present. Enclosure
categories and have a six-hour tine limit Both examinations will consist of five reduced from 33% in the operator written imposed. The weight given to theory is to about 25X in each. Consequently, the and 56% in the senior operator written,             than at present. Enclosure 1 examination becomes less of a writing marathor     how they relate to the current presents the scone of the new examinations and examinations.
1 presents the scone of the new examinations and how they relate to the current examinations.


In addition to the above, the senior operator written examination is restructured so that a senior operator need not take the operator written portion. Senior operator candidates who elect to sit only for this written examination will not be considered for an operator's license should they fail this examination.
written examination is restructured In addition to the above, the senior operator  operator written portion. Senior so that a senior operator need not take thefor this written examination will not operator candidates who elect to sit onlyshould they fail this examination.


We hope to initiate the administration of the new examinations early in 1982.However, we believe that it is essential to receive public comFents prior to implementation.
be considered for an operator's license new examinations early in 1982.


In particular, we would welcomle comments on how best to schedule the implementation of this program so as to minimize disruption of ongoino train-ing programs and staffing plans for pending onerating license applicants.
We hope to initiate the administration of tothereceive public comFents prior to However, we believe that it is essential welcomle comments on how best to schedule implementation. In particular, we would as to minimize disruption of ongoino train- the implementation of this program sopending ing programs and staffing plans for             onerating license applicants. Also, of controlled experiment to assure we believe it is essential to have some type  in well-qualified licensed individuals.


Also, we believe it is essential to have some type of controlled experiment to assure that the proposed examination will result in well-qualified licensed individuals.
that the proposed examination will result     expnriments. We have scheduled an We welcome any suggestions regarding theseWisconsin      Avenue, Bethesda, Md. on all-day meetinc at the Holiday Inn, 8200
    January 6, 1982 at a:DO am.


We welcome any suggestions regarding these expnriments.
session. This will be We plan a one-hour presentation and question/answer involving  OLS  examiners and industry, followed by small roundtable discussions assure complete      understanding  of our approach vendor, and members of the public to address    individual  concerns.  We urge you to and answer additional questions and department at this meeting.


We have scheduled an all-day meetinc at the Holiday Inn, 8200 Wisconsin Avenue, Bethesda, Md. on January 6, 1982 at a:DO am.We plan a one-hour presentation and question/answer session. This will be followed by small roundtable discussions involving OLS examiners and industry, vendor, and members of the public to assure complete understanding of our approach and answer additional questions and address individual concerns.
have representation of your training


We urge you to have representation of your training department at this meeting.
Mr. Paul F. Collins, Chief, Operator Licensing Branch, will conduct the meetine.


Mr. Paul F. Collins, Chief, Operator Licensing Branch, will conduct the meetine.?4r. Collins can be reached on (301)492-4P58 if you require additional Information.
?4r. Collins can be reached on (301)492-4P58 if you require additional Information.


Sincerely, Darrell 0. Fisenhut, Director Division of Licensing Revised examinations PAWe OLB/DHFS PCol l ins/bl Acting Dir/DHFS JKramer Dir/DL DElsenhut/ /81/ /81 / /81}}
Sincerely, Darrell 0. Fisenhut, Director Division of Licensing Revised examinations PAWe OLB/DHFS       Acting Dir/DHFS Dir/DL
PCol l ins/bl  JKramer          DElsenhut
  / /81         / /81         / /81}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 03:05, 24 November 2019

NRC Generic Letter 1981-040: Qualifications of Reactor Operators
ML031110076
Person / Time
Site: Beaver Valley, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Prairie Island, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Sterling, Robinson, South Texas, San Onofre, Cook, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, New Haven, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000514, 05000363, 05000599, 05000000, 05000515, 05000502, 05000600, 05000452, Zimmer, 05000471, 05000453, 05000516, 05000517, 05000580, 05000581, 05000376, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Bailly, Allens Creek, Perkins, Cherokee, Black Fox, Hartsville, Phipps Bend, Yellow Creek, Crane
Issue date: 12/22/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-81-040, NUDOCS 8112220187
Download: ML031110076 (4)


-

ALL POWER REACTOR LICENSEES, APPLICANTS FOR OPERATING LICENSE, NSSS VENDORS,

REACTOR VENDORS AND ARCHITECT ENGINEERS

Gentlemen:

SubJect: Qualifications of Reactor Operators - License Examinations (Generic Letter 81-40)

In letters dated September 13, 1979 and March 28, 1980, we informed you of pro- posed recommendations and revised criteria to be used by the staff in evaluating reactor operator training and licensing. We also informed you that Commission review was continuing in this area and could be expected to result in additional criteria.

As part of our effort, we have conducted an in-depth review of the examination process, including the scope and format of the examination. The review has resulted in several changes to our internal procedures and a revised operator and senior operator written examination.

Both examinations will consist of five categories and have a six-hour time limit imposed. The weight given to theory is reduced from 38% in the operator written and 56% in the senior operator written, to about 25% in each. Consequently, the examination becomes less of a writing marathon than at present. Enclosure 1 presents the scope of the new examinations and how they relate to the current examinations.

In addition to the above, the senior operator written examination is restructured so that a senior operator need not take the operator written portion. Senior operator candidates who elect to sit only for this written examination will not be considered for an operator's license should they fail this examination.

We hope to initiate the administration of the new examinations early in 1982.

However, we believe that it is essential to receive public comments prior to implementation. In particular, we would welcome comments on how best to schedule the implementation of this program so as to minimize disruption of ongoing train- Ing programs and staffing plans for pending operating license applicants. Also, we believe it is essential to have some type of controlled experiment to assure that the proposed examination will result in well-qualified licensed individuals.

We welcome any suggestions regarding these experiments. We have scheduled an all-day meeting at the Holiday Inn, 8200 Wisconsin Avenue, Bethesda, Md. on January 6, 1982 at 9:00 am.

We plan a one-hour presentation and question/answer session. This will be followed by small roundtable discussions involving OLB examiners and industry, vendor, and members of the public to assure complete understanding of our approach Ada and answer additional questions and address individual concerns. We urge you to ,

have representation of your training department at this meeting. / 4

8112220187 8112220187 PDR MISC

OFFICE

OFFICO ........................

PDR,

..... ... ,................ ........ ................

I ........................ ......................................... ........................

I............... ...............

SURNAMEIP ........ ................ ........ ................ ........................ .................................

......................................... ........................ ........................

DATE . _._.__........ ... ........................ ......... .... ............... . . .................. ...........

__ .

NRC FORM 318 (10-80) NRCM 0240 O FFICIA L R EC O RD C OP Y USGPO: ts8a-33so960

N,

Mr. Paul F. Collins, Chief, Operator Licensing Branch, will conduct the meeting.

Mr. Collins can be reached on (301)492-4868 ifyou require additional information.

Sincerely, Darrell C. Eisenhut, firector Division of Licensing Enclosure:

Revised examinatiq's paper DISTRIBUTION:

OLB Rdg OLB F/F

PCollins JKramer DEisenhut HDenton ECase DHFS BCs DL BCs DL ADs ORB BCs ORB PMs ORB LAs OELD (5)

OI&E (7)

NSIC

TERA

Central File NRC PDR

Docket File L PDR

Gray File RDiggs I

.

. 4Ir / Mfi %L L \ I. I.

\ 9 FFICE OL~'/DHFS

............

4XT ....... Di r/D FS....

Ac W 9........ rDL

.... ..................... ..... ..................

P .C.o.l.l.ins...JKramer 81 nhut ..................... ..... ..................

£o3/1 i /3b/81

1...

.................

.... ....

.._.. ......

.. .1 _ _ _ _

.................... ...... ................

_

'A 318 ( tO S0) NRCM 0240 O*ICIAL RECORD COPY >431 (1080)NRCM024 OF~CIAL RECRD C PY

OPERATI1Gf LICENSE, NSSS VENDORS,

ALL POWER REACTOR LICENSEES, APPLICANTS FOR

REACTOR VENDORS AUD ARCHITECT ENGINEERS

Gentlemen:

Examinations Subject: Qualifications of Reactor Onfrators - License (Generic Letter 81-40)

2`2, 198Q0 we informed you of pro- In letters dated Septenber 13, 1979 and March to be used by the staff in evaluating posed recommendations and revised criteria We also informed you that Conmnission reactor operator training and licensing.

could he expected to result in additional review was continuing in this area and criteria.

an in-denth review of the examination As part of our effort, we have conducted of the examination. The review has process, including the scope and format Procedures and a revised operator resulted in several changes to our internal and senior operator written examiniation.

categories and have a six-hour tine limit Both examinations will consist of five reduced from 33% in the operator written imposed. The weight given to theory is to about 25X in each. Consequently, the and 56% in the senior operator written, than at present. Enclosure 1 examination becomes less of a writing marathor how they relate to the current presents the scone of the new examinations and examinations.

written examination is restructured In addition to the above, the senior operator operator written portion. Senior so that a senior operator need not take thefor this written examination will not operator candidates who elect to sit onlyshould they fail this examination.

be considered for an operator's license new examinations early in 1982.

We hope to initiate the administration of tothereceive public comFents prior to However, we believe that it is essential welcomle comments on how best to schedule implementation. In particular, we would as to minimize disruption of ongoino train- the implementation of this program sopending ing programs and staffing plans for onerating license applicants. Also, of controlled experiment to assure we believe it is essential to have some type in well-qualified licensed individuals.

that the proposed examination will result expnriments. We have scheduled an We welcome any suggestions regarding theseWisconsin Avenue, Bethesda, Md. on all-day meetinc at the Holiday Inn, 8200

January 6, 1982 at a:DO am.

session. This will be We plan a one-hour presentation and question/answer involving OLS examiners and industry, followed by small roundtable discussions assure complete understanding of our approach vendor, and members of the public to address individual concerns. We urge you to and answer additional questions and department at this meeting.

have representation of your training

Mr. Paul F. Collins, Chief, Operator Licensing Branch, will conduct the meetine.

?4r. Collins can be reached on (301)492-4P58 if you require additional Information.

Sincerely, Darrell 0. Fisenhut, Director Division of Licensing Revised examinations PAWe OLB/DHFS Acting Dir/DHFS Dir/DL

PCol l ins/bl JKramer DElsenhut

/ /81 / /81 / /81

Template:GL-Nav