| issue date = 04/07/1988
| issue date = 04/07/1988
| title = NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.
| title = NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.
| author name = Miraglia F J
| author name = Miraglia F
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY  
{{#Wiki_filter:UNITED STATES
COMMISSION
                        NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555 April 7, 1988 TO ALL POWER REACTOR LICENSEES  
                                  WASHINGTON, D. C. 20555 April 7, 1988 TO ALL POWER REACTOR LICENSEES AND APPLICANTS
AND APPLICANTS
SUBJECT:   MODIFIED ENFORCEMENT POLICY RELATING TO 10 CFR 50.49, ENVIRONMENTAL
SUBJECT: MODIFIED ENFORCEMENT  
          QUALIFICATION OF ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY FOR NUCLEAR
POLICY RELATING TO 10 CFR 50.49, ENVIRONMENTAL
          POWER PLANTSO (GENERIC LETTER 88-07)
QUALIFICATION  
Background:
OF ELECTRICAL  
Generic Letters, Bulletins, and Information Notices have been issued to provide guidance regarding the application and enforcement of 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants.'
EQUIPMENT  
Generic Letter 85-15, issued August 6, 1985, and Generic Letter 86-15, issued September 22, 1986, provided information related to the deadlines for compliance with 10 CFR 50.49 and possible civil penalties applicable to licensees who were not in compliance with the rule as of the November 30, A985 deadline. Upon review, the Commission found that the EQ Enforcement Policy promulgated in Generic Letter
IMPORTANT  
86-15, could result in imposition of civil penalties that did not properly reflect the safety significance of EQ violations with respect to civil penalties imposed in the past. In the interest of continuing a tough but fair enforcement policy, the Commission determined that the EQ Enforcement Policy should be revised. The purpose of this letter is to provide a modification to the NRC's enforcement policy, as approved by the Commission, for environmental qualification (EQ)
TO SAFETY FOR NUCLEAR POWER PLANTSO (GENERIC LETTER 88-07)Background:
violations. This letter replaces the guidance provided in Generic Letters 85-15 and 86-15.
Generic Letters, Bulletins, and Information Notices have been issued to provide guidance regarding the application and enforcement of 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants.'Generic Letter 85-15, issued August 6, 1985, and Generic Letter 86-15, issued September  
22, 1986, provided information related to the deadlines for compliance with 10 CFR 50.49 and possible civil penalties applicable to licensees who were not in compliance with the rule as of the November 30, A985 deadline.


Upon review, the Commission found that the EQ Enforcement Policy promulgated in Generic Letter 86-15, could result in imposition of civil penalties that did not properly reflect the safety significance of EQ violations with respect to civil penalties imposed in the past. In the interest of continuing a tough but fair enforcement policy, the Commission determined that the EQ Enforcement Policy should be revised. The purpose of this letter is to provide a modification to the NRC's enforcement policy, as approved by the Commission, for environmental qualification (EQ)violations.
Modified EQ Enforcement Policy The details of the modified EQ enforcement policy are provided in the enclosure.


This letter replaces the guidance provided in Generic Letters 85-15 and 86-15.Modified EQ Enforcement Policy The details of the modified EQ enforcement policy are provided in the enclosure.
Generally, the changes made to the policy are to: (1) aggregate significant EQ violations together, rather than consider each separate item of unqualified electrical equipment, for assessment of a civil penalty, (2) assess a base civil penalty according to the number of systems or components which are affected by the unqualified equipment in a graded approach by assignment of the aggregate EQ problem into one of three categories, (3) establish a maximum EQ civil penalty of $750,000 for most cases, (4) maintain a minimum civil penalty of $50,000 for a significant EQ violation in most cases, and (5) consider mitigation or escalation of the base civil penalty based on the factors of identification and reporting, best efforts to complete EQ within the deadline, corrective actions, and duration of the violation.
 
This modified policy should not be interpreted as a lessening of the NRC's intention to assure that all plants comply with EQ requirements. The modified policy is intended to give a significant civil penalty to those licensees with significant EQ violations. The NRC's view is that the modified policy more closely reflects the relative safety importance of EQ violations with other enforcement issues.
 
Safety Issues When a potential deficiency has been identified by the NRC or licensee in thea environmental qualification of equipment (i.e., a licensee does not have an
                                  .A
 
Generic Letter 88-07                - 2 -                        April 7,1 1988 adequate basis to establish qualification), the licensee is expected to make a prompt determination of operability (i.e., the system or component is capable of performing its intended design function), take immediate steps to establish a plan with a reasonable schedule to correct the deficiency, and have written Justification for continued operation, which will be available for NRC review.


Generally, the changes made to the policy are to: (1) aggregate significant EQ violations together, rather than consider each separate item of unqualified electrical equipment, for assessment of a civil penalty, (2) assess a base civil penalty according to the number of systems or components which are affected by the unqualified equipment in a graded approach by assignment of the aggregate EQ problem into one of three categories, (3) establish a maximum EQ civil penalty of $750,000 for most cases, (4) maintain a minimum civil penalty of $50,000 for a significant EQ violation in most cases, and (5) consider mitigation or escalation of the base civil penalty based on the factors of identification and reporting, best efforts to complete EQ within the deadline, corrective actions, and duration of the violation.
The licensee may be able to make a finding of operability using analysis and partial test data to provide reasonable assurance that the equipment will perform its safety function when called upon. In this connection, it must also be shown that subsequent failure of the equipment, if likely under accident conditions, will not result in significant degradation of any safety function or provide misleading information to the operator.
 
The following actions are to be taken if a licensee is unable to demonstrate equipment operability:
    a.    For inoperable equipment which is in a system covered by plant technical specifications, the licensee shall follow the appropriate action statements. This could require the plant to shut down or remain shut down.
 
b.    For inoperable equipment not covered by the plant technical specifications, the licensee may continue reactor operation:
          1.  If the safety function can be accomplished by other designated equipment that is qualified, or
          2.  If limited administrative controls can be used to ensure the safety function is performed.
 
The licensee must also evaluate whether the findings are reportable under
10 CFR 50.72 and 50.73, 10 CFR Part 21, the Technical Specifications or any other pertinent reporting requirements, including 10 CFR 50.9(b), particularly if equipment is determined to be inoperable.
 
This letter does not require any response and therefore does not need approval of the Office of Management and Budget. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, DC 20503. Should you have questions on this letter, the staff contact is Howard Wong, Office of Enforcement. He can be reach on (301) 492-3281.
 
Frank J. M agl Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:  As stated
 
;
                                                              ENCLOSURE
                  MODIFIED ENFORCEMENT POLICY FOR EQ REQUIREMENTS
  This enclosure provides the details of the modified enforcement policy for EQ
  requirements for those licensees who were not in compliance with 10 CFR 50.49 as of the November 30, 1985 deadline.


This modified policy should not be interpreted as a lessening of the NRC's intention to assure that all plants comply with EQ requirements.
I.  Scope of the Enforcement Policy for EQ Requirements If violations of the EQ rule identified at plants operating after November 30, 1985 existed before the deadline and the licensee clearly knew or should have known" of the lack of proper environmental qualifi- cation, then enforcement action may be taken as described in Sections III
      and IV. If the licensee does not meet the "clearly knew or should have known" test, no enforcement action will be taken.


The modified policy is intended to give a significant civil penalty to those licensees with significant EQ violations.
This enforcement policy applies to violations of the EQ rule identified after November 30, 1985 which relate back to action or lack of action before the deadline. Violations which occurred after November 30, 1985 (either as a result of plant modifications or because the plant was licensed after November 30, 1985) will be considered for enforcement action under the normal Enforcement Policy of 10 CFR Part 2, Appendix C.


The NRC's view is that the modified policy more closely reflects the relative safety importance of EQ violations with other enforcement issues.Safety Issues When a potential deficiency has been identified by the NRC or licensee in thea environmental qualification of equipment (i.e., a licensee does not have an.A
In addition, EQ violations which are identified after the NRC's last first-round inspection, 1/ approximately mid-1988, will also be considered under the normal Enforcement Policy.
Generic Letter 88-07-2 -April 7,1 1988 adequate basis to establish qualification), the licensee is expected to make a prompt determination of operability (i.e., the system or component is capable of performing its intended design function), take immediate steps to establish a plan with a reasonable schedule to correct the deficiency, and have written Justification for continued operation, which will be available for NRC review.The licensee may be able to make a finding of operability using analysis and partial test data to provide reasonable assurance that the equipment will perform its safety function when called upon. In this connection, it must also be shown that subsequent failure of the equipment, if likely under accident conditions, will not result in significant degradation of any safety function or provide misleading information to the operator.The following actions are to be taken if a licensee is unable to demonstrate equipment operability:
a. For inoperable equipment which is in a system covered by plant technical specifications, the licensee shall follow the appropriate action statements.


This could require the plant to shut down or remain shut down.b. For inoperable equipment not covered by the plant technical specifications, the licensee may continue reactor operation:
II. Application of the "Clearly Knew, or Should Have Known" Test Licensees who "clearly knew" they had equipment for which qualification could not be established may have committed a deliberate violation of NRC
1. If the safety function can be accomplished by other designated equipment that is qualified, or 2. If limited administrative controls can be used to ensure the safety function is performed.
      requirements. This situation will be evaluated on a case-by-case basis.


The licensee must also evaluate whether the findings are reportable under 10 CFR 50.72 and 50.73, 10 CFR Part 21, the Technical Specifications or any other pertinent reporting requirements, including
The NRC will examine the circumstances in each case to determine whether the licensee 'clearly should have known" that its equipment was not quali- fied. The factors the NRC will examine include:
10 CFR 50.9(b), particularly if equipment is determined to be inoperable.
      1.  Did the licensee have vendor-supplied documentation that demonstrated that the equipment was qualified?
      2.   Did the licensee perform adequate receiving and/or field verification inspection to determine that the configuration of the installed equipment matched the configuration of the equipment that was qualified by the vendor?
      3.   Did the licensee have prior notice that equipment qualification deficiencies might exist?
      4.  Did other licensees identify similar problems and correct them before the deadline?
  1/  First-round inspections are special team inspections to review licensees'
      compliance with 10 CFR 50.49.


This letter does not require any response and therefore does not need approval of the Office of Management and Budget. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, DC 20503. Should you have questions on this letter, the staff contact is Howard Wong, Office of Enforcement.
Enclosure                            - 2- In assessing whether the licensee clearly should have known of a deficiency, the Information provided to the licensees by the NRC and the industry on specific deficiencies will be taken into consideration. This information, and the timeliness of it being provided to licensees prior to the EQ
      deadline are relevant factors. If one licensee determined that a specific EQ deficiency existed, it would not be assumed that all licensees should have also come to the same conclusion unless information about the specific deficiency had been widely disseminated within the industry or by the NRC.


He can be reach on (301) 492-3281.Frank J. M agl Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:
The staff will carefully consider these criteria when evaluating whether a licensee clearly should have known of a deficiency prior to the deadline.
As stated
;ENCLOSURE MODIFIED ENFORCEMENT
POLICY FOR EQ REQUIREMENTS
This enclosure provides the details of the modified enforcement policy for EQ requirements for those licensees who were not in compliance with 10 CFR 50.49 as of the November 30, 1985 deadline.I. Scope of the Enforcement Policy for EQ Requirements If violations of the EQ rule identified at plants operating after November 30, 1985 existed before the deadline and the licensee clearly knew or should have known" of the lack of proper environmental qualifi-cation, then enforcement action may be taken as described in Sections III and IV. If the licensee does not meet the "clearly knew or should have known" test, no enforcement action will be taken.This enforcement policy applies to violations of the EQ rule identified after November 30, 1985 which relate back to action or lack of action before the deadline.


Violations which occurred after November 30, 1985 (either as a result of plant modifications or because the plant was licensed after November 30, 1985) will be considered for enforcement action under the normal Enforcement Policy of 10 CFR Part 2, Appendix C.In addition, EQ violations which are identified after the NRC's last first-round inspection, 1/ approximately mid-1988, will also be considered under the normal Enforcement Policy.II. Application of the "Clearly Knew, or Should Have Known" Test Licensees who "clearly knew" they had equipment for which qualification could not be established may have committed a deliberate violation of NRC requirements.
III. EQ Violations not Sufficiently Significant to Merit a Civil Penalty Under the Modified Policy Any failure to adequately list and demonstrate qualification of equipment required by 10 CFR 50.49 may constitute a violation of the rule. This does not require, however, that all violations of the rule be considered for escalated enforcement or be assessed a civil penalty. For example, if the qualification file presented to the Inspector during an Inspection did not demonstrate or support qualification of equipment, the equipment would be considered unqualified 2/ and 10 CFR 50.49 requirements would be violated.


This situation will be evaluated on a case-by-case basis.The NRC will examine the circumstances in each case to determine whether the licensee 'clearly should have known" that its equipment was not quali-fied. The factors the NRC will examine include: 1. Did the licensee have vendor-supplied documentation that demonstrated that the equipment was qualified?
However, although not iin the qualification file, if sufficient data exists or is developed during the inspection to demonstrate qualification of the equipment or, based on other information available to the inspector, the specific equipment is qualifiable for the application in question, the qualification deficiency is not considered sufficiently significant for assessment of civil penalties. These violations would be considered to be Severity Level IV or Severity Level V violations based on a violation of
2. Did the licensee perform adequate receiving and/or field verification inspection to determine that the configuration of the installed equipment matched the configuration of the equipment that was qualified by the vendor?3. Did the licensee have prior notice that equipment qualification deficiencies might exist?4. Did other licensees identify similar problems and correct them before the deadline?1/ First-round inspections are special team inspections to review licensees'
      10 CFR 50.49 requirements at the time of the inspection.
compliance with 10 CFR 50.49.


Enclosure-2 -In assessing whether the licensee clearly should have known of a deficiency, the Information provided to the licensees by the NRC and the industry on specific deficiencies will be taken into consideration.
Programmatic violations or problems that are identified as a result of the EQ Inspections that involve several EQ violations which themselves would not be considered sufficiently significant to merit a civil penalty under the modified EQ enforcement policy nonetheless may be aggregated and evaluated for escalated enforcement action (generally Severity Level III) for the failure to satisfy applicable requirements of 10 CFR
    50.49 and/or 10 CFR Part 50, Appendix B. The civil penalties for these violations would be assessed under the normal Enforcement Policy of
      10 CFR Part 2, Appendix C (Supplement I).
IV. Basis for Determining Civil Penalties A. Base Civil Penalty Significant EQ violations, for which the licensee clearly should have known that they had equipment for which qualification had not been established,
2/  For purposes of enforcement, Ounqualifid equipmentu means equipment for which there is not adequate documentation to establish that this equipment will perform its intended functions in the relevant environment.


This information, and the timeliness of it being provided to licensees prior to the EQ deadline are relevant factors. If one licensee determined that a specific EQ deficiency existed, it would not be assumed that all licensees should have also come to the same conclusion unless information about the specific deficiency had been widely disseminated within the industry or by the NRC.The staff will carefully consider these criteria when evaluating whether a licensee clearly should have known of a deficiency prior to the deadline.III. EQ Violations not Sufficiently Significant to Merit a Civil Penalty Under the Modified Policy Any failure to adequately list and demonstrate qualification of equipment required by 10 CFR 50.49 may constitute a violation of the rule. This does not require, however, that all violations of the rule be considered for escalated enforcement or be assessed a civil penalty. For example, if the qualification file presented to the Inspector during an Inspection did not demonstrate or support qualification of equipment, the equipment would be considered unqualified
A
2/ and 10 CFR 50.49 requirements would be violated.However, although not iin the qualification file, if sufficient data exists or is developed during the inspection to demonstrate qualification of the equipment or, based on other information available to the inspector, the specific equipment is qualifiable for the application in question, the qualification deficiency is not considered sufficiently significant for assessment of civil penalties.
  Enclosure                            -3- are to be considered together, in the aggregate, and the base civil penalty assessed in a graded approach based on the number of systems or components affected. 3/
      The base civil penalty would be determined as described below.


These violations would be considered to be Severity Level IV or Severity Level V violations based on a violation of 10 CFR 50.49 requirements at the time of the inspection.
EQ Violation Category                  Base Civil Penalty A.    Extensive; EQ violations affecting many          $300,000
              systems and many components.


Programmatic violations or problems that are identified as a result of the EQ Inspections that involve several EQ violations which themselves would not be considered sufficiently significant to merit a civil penalty under the modified EQ enforcement policy nonetheless may be aggregated and evaluated for escalated enforcement action (generally Severity Level III) for the failure to satisfy applicable requirements of 10 CFR 50.49 and/or 10 CFR Part 50, Appendix B. The civil penalties for these violations would be assessed under the normal Enforcement Policy of 10 CFR Part 2, Appendix C (Supplement I).IV. Basis for Determining Civil Penalties A. Base Civil Penalty Significant EQ violations, for which the licensee clearly should have known that they had equipment for which qualification had not been established, 2/ For purposes of enforcement, Ounqualifid equipmentu means equipment for which there is not adequate documentation to establish that this equipment will perform its intended functions in the relevant environment.
B.     Moderate; EQ violations affecting some            $150,000
              systems and some components.


A Enclosure
C.    Isolated; EQ violations affecting a              $ 75,000
-3 -are to be considered together, in the aggregate, and the base civil penalty assessed in a graded approach based on the number of systems or components affected.
              limited number of systems and components.


3/The base civil penalty would be determined as described below.EQ Violation Category Base Civil Penalty A. Extensive;
The three EQ violation categories reflect the overall pervasiveness and the general safety significance of significant EQ violations. The NRC
EQ violations affecting many $300,000 systems and many components.
        considers violations of EQ requirements to be safety significant because the electrical equipment required to be qualified were those which have importance to safety. The violation categories do not include those EQ
        violations which have been determined to be not sufficiently significant standing alone to be considered for escalated enforcement and which will be normally considered as Severity Level IV or V violations, as described in Section III. As stated in Section III, however, programmatic problems may be the subject of escalated enforcement action under the NRC's normal Enforcement Policy.


B. Moderate;
The significance of the EQ violations is considered when the NRC evaluates the number of systems affected by the EQ violations and determines the EQ
EQ violations affecting some $150,000 systems and some components.
        violation category. The NRC will assume, for escalated enforcement cases, that the unqualified equipment could affect operability of the associated system. The NRC will not consider refinements on the operability arguments such as the actual timreThe equipment is required to be operable, admini- strative measures or controls available to ensure the safety function is accomplished, the degree to which the operability of a system is affected, or, that through additional analyses or testing, the equipment may be demonstrated to be qualified or qualifiable. This assumption is made for enforcement purposes in order to reduce the resources anticipated to be spent by licensees and the NRC to evaluate in detail whether system operability was in question.


C. Isolated;
3/  The EQ violation categories (A-C) will be used rather than the severity levels in the normal Enforcement Policy of 10 CFR Part 2, Appendix C.
EQ violations affecting a $ 75,000 limited number of systems and components.


The three EQ violation categories reflect the overall pervasiveness and the general safety significance of significant EQ violations.
The base civil penalty for the violations will be applied consistent with the statutory limits on civil penalties under Section 234 of the Atomic Energy Act.


The NRC considers violations of EQ requirements to be safety significant because the electrical equipment required to be qualified were those which have importance to safety. The violation categories do not include those EQ violations which have been determined to be not sufficiently significant standing alone to be considered for escalated enforcement and which will be normally considered as Severity Level IV or V violations, as described in Section III. As stated in Section III, however, programmatic problems may be the subject of escalated enforcement action under the NRC's normal Enforcement Policy.The significance of the EQ violations is considered when the NRC evaluates the number of systems affected by the EQ violations and determines the EQ violation category.
Enclosure                            - 4 -
      Because the NRC is considering enforcement action rather than a justifica- tion for continued operation and the EQ deficiencies have been corrected in most instances, the NRC will make a conservative judgment as to the overall safety significance of the EQ violations based on the number of safety systems affected. This approach has the benefits of a relatively quick, though conservative, view on the safety consequences of unqualified equipment and wil) focus on the underlying cause of the EO violations.


The NRC will assume, for escalated enforcement cases, that the unqualified equipment could affect operability of the associated system. The NRC will not consider refinements on the operability arguments such as the actual timreThe equipment is required to be operable, admini-strative measures or controls available to ensure the safety function is accomplished, the degree to which the operability of a system is affected, or, that through additional analyses or testing, the equipment may be demonstrated to be qualified or qualifiable.
Cases involving deliberate violations or very serious EQ violations (more safety significant than considered in this modified enforcement policy such as widespread breakdowns or clearly inoperable systems) will be evaluated on a case-by-case basis and may be subject to more severe sanctions than those described in this policy.


This assumption is made for enforcement purposes in order to reduce the resources anticipated to be spent by licensees and the NRC to evaluate in detail whether system operability was in question.3/ The EQ violation categories (A-C) will be used rather than the severity levels in the normal Enforcement Policy of 10 CFR Part 2, Appendix C.The base civil penalty for the violations will be applied consistent with the statutory limits on civil penalties under Section 234 of the Atomic Energy Act.
B.    Mitigation/Escalation Factors Mitigation and escalation of the base civil penalty determined in Section IY.A will be considered in the determination of the civil penalty amount.


Enclosure-4 -Because the NRC is considering enforcement action rather than a justifica- tion for continued operation and the EQ deficiencies have been corrected in most instances, the NRC will make a conservative judgment as to the overall safety significance of the EQ violations based on the number of safety systems affected.
The NRC will consider the EQ violations In aggregate, not based on individual violations. Adjustment of the base civil penalty will be considered as described below:
          Mitigation/Escalation Factors                Maximum Mitigation/
                                                        Escalation Amount (from base civil penalty)
    1.    Identification and prompt reporting, if required,            +/- 50%
          of the EQ violations (including opportunities to identify and correct the deficiencies).
    2.    Best efforts to complete EQ within the deadline.            i 50%
    3.    Corrective actions to result in full compliance                50%
          (including the time taken to make an operability or qualification determination, the quality of any supporting analysis, and the nature and extent of the licensee's efforts to come into compliance).
    4.    Duration of violation which is significantly below            -  50%
          100 days.


This approach has the benefits of a relatively quick, though conservative, view on the safety consequences of unqualified equipment and wil) focus on the underlying cause of the EO violations.
In order to be fair and equitable to those licensees who took appropriate actions prior to November 30, 1985 or shut down prior to this date to be in compliance, civil penalties generally should not be less than $50,000
    to emphasize that a significant environmental qualification failure is unacceptable.


Cases involving deliberate violations or very serious EQ violations (more safety significant than considered in this modified enforcement policy such as widespread breakdowns or clearly inoperable systems) will be evaluated on a case-by-case basis and may be subject to more severe sanctions than those described in this policy.B. Mitigation/Escalation Factors Mitigation and escalation of the base civil penalty determined in Section IY.A will be considered in the determination of the civil penalty amount.The NRC will consider the EQ violations In aggregate, not based on individual violations.
The NRC will, however, consider full mitigation (no civil penalty) for those EQ violations which satisfy all of the five following criteria:
    (1)violations which are Isolated and affect a limited number of systems and components, (2)violations which are identified by the licensee,
    (3)violations which are promptly reported to the NRC, if required,
    (4)violations which are corrected and actions taken will result in full compliance within a reasonable time, and (5)violations for which the licensee has demonstrated best efforts to complete EQ within the deadline.


Adjustment of the base civil penalty will be considered as described below: Mitigation/Escalation Factors Maximum Mitigation/
Enclosure                          - 5- The intent of full mitigation of the civil penalty for EQ violations which meet all five criteria is to increase the incentive for self- identification of EQ deficiencies which might not otherwise be found by NRC. The NRC will generally issue only a Notice of Violation for violations which meet all these criteria.
Escalation Amount (from base civil penalty)1. Identification and prompt reporting, if required, +/- 50%of the EQ violations (including opportunities to identify and correct the deficiencies).
2. Best efforts to complete EQ within the deadline.


i 50%3. Corrective actions to result in full compliance
If the licensee is able to convincingly demonstrate at the time of the inspection, or shortly thereafter, that an item is not required to be on the EQ list, then the item would not be considered for enforcement action.
50%(including the time taken to make an operability or qualification determination, the quality of any supporting analysis, and the nature and extent of the licensee's efforts to come into compliance).
4. Duration of violation which is significantly below -50%100 days.In order to be fair and equitable to those licensees who took appropriate actions prior to November 30, 1985 or shut down prior to this date to be in compliance, civil penalties generally should not be less than $50,000 to emphasize that a significant environmental qualification failure is unacceptable.


The NRC will, however, consider full mitigation (no civil penalty) for those EQ violations which satisfy all of the five following criteria: (1) violations which are Isolated and affect a limited number of systems and components, (2) violations which are identified by the licensee, (3) violations which are promptly reported to the NRC, if required, (4) violations which are corrected and actions taken will result in full compliance within a reasonable time, and (5) violations for which the licensee has demonstrated best efforts to complete EQ within the deadline.
The NRC does not intend to consider for enforcement purposes the results of a licensee's after-the-fact testing for mitigation where the licensee clearly should have known that its documentation was not sufficient.


Enclosure
J,              L.air OF RECENTLY ISSUED GENEV _ LETTERS
-5-The intent of full mitigation of the civil penalty for EQ violations which meet all five criteria is to increase the incentive for self-identification of EQ deficiencies which might not otherwise be found by NRC. The NRC will generally issue only a Notice of Violation for violations which meet all these criteria.If the licensee is able to convincingly demonstrate at the time of the inspection, or shortly thereafter, that an item is not required to be on the EQ list, then the item would not be considered for enforcement action.The NRC does not intend to consider for enforcement purposes the results of a licensee's after-the-fact testing for mitigation where the licensee clearly should have known that its documentation was not sufficient.
Generic                                      Date of Letter No.  Subject                          Issuance    Issued To GL  88-06  REMOVAL OF ORGANIZATION CHARTS 03/22/BB      ALL POWER
            FROM TECHNICAL SPECIFICATION                  REACTOR
                  ADMINISTRATIVE CONTROL                LICENSEES AND
            REQUIREMENTS                                  APPLICANTS
GL  88-05  BORIC ACID CORROSION OF CARBON 03/17/88      ALL LICENSEES
            STEEL REACTOR PRESSURE                        OF OPERATING
            BOUNDARY        COMPONENTS IN                PWRS AND
            PWR PLANTS                                    HOLDERS OF
                                                          CONSTRUCTION
                                                          PERMITS FOR
                                                          PWRS
GL  88-04  DISTRIBUTION OF GEMS            02/23/88      ALL NON-POWER
            IRRADIATED IN RESEARCH                        REACTOR
            REACTORS                                      LICENSEES
GL  88-03  RESOLUTION OF GENERIC SAFETY    02/17/88      ALL LICENSEES,
            ISSUE 93, "STEAM BINDING OF                    APPLICANTS FOR
            AUXILIARY FEEDWATER PUMPS"                    OPERATING
                                                          LICENSES, AND
                                                          HOLDERS OF
                                                          CONSTRUCTION
                                                          PERMITS FOR
                                                          PRESSURIZED
                                                          WATER REACTORS
GL  8E-02  "INTEGRATED SEFETY ASSESSMENT    01/20/88    ALL POWER
            PROGRAM II (ISAP II)'                          REACTOR
                                                          LICENSEES
GL  88-01  "NRC POSITION ON IGSCC IN BWR    01/25/88    ALL LICENSEES
            AUSTENITIC STAINLESS STEEL                    OF OPERATING
            PIPING"                                        BOILING WATER
                                                          REACTORS AND
                                                          HOLDERS OF
                                                          CONSTRUCTION
                                                          PERMITS FOR
                                                          BWRS
GL  87-16  NUREG-1262, "ANSWERS TO          11/12/87    ALL POWER AND
            QUESTIONS AT PUBLIC MEETINGS                  NONPOWER
            RE IMPLEMENTATION OF 10 CFR55                REACTOR
            ON OPERATORS                                  LICENSEES AND
              LICENSES                                    APPLICANTS FOR
                                                          LICENSES
EL  87-15  POLICY STATEMENT ON DEFERRED    11/04/87      ALL HOLDERS OF
            PLANTS                                        CONSTRUCTION
                                                            PERMITS FOR A
                                                            NUCLEAR POWER
                                                            PLANT
GL  B7-14  REQUEST FOR OPERATOR LICENSE    08/04/87      ALL POWER
            SCHEDULES                                      REACTOR
                                                            LICENSEES


J, L.air OF RECENTLY ISSUED GENEV _ LETTERS Generic Letter No.Date of Subject Issuance Issued To GL 88-06 REMOVAL OF ORGANIZATION
Generic Letter 88-07             - 2 -                 April 7. 1988 DISTRIBUTION:
CHARTS FROM TECHNICAL
Central Files PDR
SPECIFICATION
Murley/Sniezek FJMiraglia TMartin JLleberman HWong DCrutchfleld GHolahan
ADMINISTRATIVE
                              8804080088
CONTROL REQUIREMENTS
                                5(   ~     JI
03/22/BB ALL POWER REACTOR LICENSEES
Wjw~ #/N
AND APPLICANTS
OE         D: OE
GL 88-05 GL 88-04 GL 88-03 GL 8E-02 GL 88-01 BORIC ACID CORROSION
* r XRf
OF CARBON STEEL REACTOR PRESSURE BOUNDARY COMPONENTS
                      4          NRR
IN PWR PLANTS DISTRIBUTION
HWong      JLleberman GHolahan  DCrutchfield      lia
OF GEMS IRRADIATED
3/37 /88 3/3/88       UP /88   3/ /88         ~8}}
IN RESEARCH REACTORS RESOLUTION
OF GENERIC SAFETY ISSUE 93, "STEAM BINDING OF AUXILIARY
FEEDWATER
PUMPS""INTEGRATED
SEFETY ASSESSMENT
PROGRAM II (ISAP II)'"NRC POSITION ON IGSCC IN BWR AUSTENITIC
STAINLESS
STEEL PIPING" 03/17/88 02/23/88 02/17/88 01/20/88 01/25/88 ALL LICENSEES OF OPERATING PWRS AND HOLDERS OF CONSTRUCTION
PERMITS FOR PWRS ALL NON-POWER REACTOR LICENSEES ALL LICENSEES, APPLICANTS
FOR OPERATING LICENSES, AND HOLDERS OF CONSTRUCTION
PERMITS FOR PRESSURIZED
WATER REACTORS ALL POWER REACTOR LICENSEES ALL LICENSEES OF OPERATING BOILING WATER REACTORS AND HOLDERS OF CONSTRUCTION
PERMITS FOR BWRS GL 87-16 NUREG-1262, "ANSWERS TO QUESTIONS
AT PUBLIC MEETINGS RE IMPLEMENTATION
OF 10 CFR55 ON OPERATORS LICENSES 11/12/87 ALL POWER AND NONPOWER REACTOR LICENSEES
AND APPLICANTS
FOR LICENSES EL 87-15 GL B7-14 POLICY STATEMENT
ON DEFERRED PLANTS REQUEST FOR OPERATOR LICENSE SCHEDULES 11/04/87 08/04/87 ALL HOLDERS OF CONSTRUCTION
PERMITS FOR A NUCLEAR POWER PLANT ALL POWER REACTOR LICENSEES
Generic Letter 88-07-2 -April 7. 1988 DISTRIBUTION:
Central Files PDR Murley/Sniezek FJMiraglia TMartin JLleberman HWong DCrutchfleld GHolahan 8804080088
5( ~ JI Wjw~ #/N OE HWong 3/37 /88 D: OE
* r JLleberman
3/ 3/88 4 XRf GHolahan UP /88 NRR DCrutchfield
3/ /88 lia~8}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 03:01, 24 November 2019

NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.
ML031130428
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane
Issue date: 04/07/1988
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
References
GL-88-007, NUDOCS 8804080088
Download: ML031130428 (9)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 April 7, 1988 TO ALL POWER REACTOR LICENSEES AND APPLICANTS

SUBJECT: MODIFIED ENFORCEMENT POLICY RELATING TO 10 CFR 50.49, ENVIRONMENTAL

QUALIFICATION OF ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY FOR NUCLEAR

POWER PLANTSO (GENERIC LETTER 88-07)

Background:

Generic Letters, Bulletins, and Information Notices have been issued to provide guidance regarding the application and enforcement of 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants.'

Generic Letter 85-15, issued August 6, 1985, and Generic Letter 86-15, issued September 22, 1986, provided information related to the deadlines for compliance with 10 CFR 50.49 and possible civil penalties applicable to licensees who were not in compliance with the rule as of the November 30, A985 deadline. Upon review, the Commission found that the EQ Enforcement Policy promulgated in Generic Letter 86-15, could result in imposition of civil penalties that did not properly reflect the safety significance of EQ violations with respect to civil penalties imposed in the past. In the interest of continuing a tough but fair enforcement policy, the Commission determined that the EQ Enforcement Policy should be revised. The purpose of this letter is to provide a modification to the NRC's enforcement policy, as approved by the Commission, for environmental qualification (EQ)

violations. This letter replaces the guidance provided in Generic Letters 85-15 and 86-15.

Modified EQ Enforcement Policy The details of the modified EQ enforcement policy are provided in the enclosure.

Generally, the changes made to the policy are to: (1) aggregate significant EQ violations together, rather than consider each separate item of unqualified electrical equipment, for assessment of a civil penalty, (2) assess a base civil penalty according to the number of systems or components which are affected by the unqualified equipment in a graded approach by assignment of the aggregate EQ problem into one of three categories, (3) establish a maximum EQ civil penalty of $750,000 for most cases, (4) maintain a minimum civil penalty of $50,000 for a significant EQ violation in most cases, and (5) consider mitigation or escalation of the base civil penalty based on the factors of identification and reporting, best efforts to complete EQ within the deadline, corrective actions, and duration of the violation.

This modified policy should not be interpreted as a lessening of the NRC's intention to assure that all plants comply with EQ requirements. The modified policy is intended to give a significant civil penalty to those licensees with significant EQ violations. The NRC's view is that the modified policy more closely reflects the relative safety importance of EQ violations with other enforcement issues.

Safety Issues When a potential deficiency has been identified by the NRC or licensee in thea environmental qualification of equipment (i.e., a licensee does not have an

.A

Generic Letter 88-07 - 2 - April 7,1 1988 adequate basis to establish qualification), the licensee is expected to make a prompt determination of operability (i.e., the system or component is capable of performing its intended design function), take immediate steps to establish a plan with a reasonable schedule to correct the deficiency, and have written Justification for continued operation, which will be available for NRC review.

The licensee may be able to make a finding of operability using analysis and partial test data to provide reasonable assurance that the equipment will perform its safety function when called upon. In this connection, it must also be shown that subsequent failure of the equipment, if likely under accident conditions, will not result in significant degradation of any safety function or provide misleading information to the operator.

The following actions are to be taken if a licensee is unable to demonstrate equipment operability:

a. For inoperable equipment which is in a system covered by plant technical specifications, the licensee shall follow the appropriate action statements. This could require the plant to shut down or remain shut down.

b. For inoperable equipment not covered by the plant technical specifications, the licensee may continue reactor operation:

1. If the safety function can be accomplished by other designated equipment that is qualified, or

2. If limited administrative controls can be used to ensure the safety function is performed.

The licensee must also evaluate whether the findings are reportable under

10 CFR 50.72 and 50.73, 10 CFR Part 21, the Technical Specifications or any other pertinent reporting requirements, including 10 CFR 50.9(b), particularly if equipment is determined to be inoperable.

This letter does not require any response and therefore does not need approval of the Office of Management and Budget. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, DC 20503. Should you have questions on this letter, the staff contact is Howard Wong, Office of Enforcement. He can be reach on (301) 492-3281.

Frank J. M agl Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure: As stated

ENCLOSURE

MODIFIED ENFORCEMENT POLICY FOR EQ REQUIREMENTS

This enclosure provides the details of the modified enforcement policy for EQ

requirements for those licensees who were not in compliance with 10 CFR 50.49 as of the November 30, 1985 deadline.

I. Scope of the Enforcement Policy for EQ Requirements If violations of the EQ rule identified at plants operating after November 30, 1985 existed before the deadline and the licensee clearly knew or should have known" of the lack of proper environmental qualifi- cation, then enforcement action may be taken as described in Sections III

and IV. If the licensee does not meet the "clearly knew or should have known" test, no enforcement action will be taken.

This enforcement policy applies to violations of the EQ rule identified after November 30, 1985 which relate back to action or lack of action before the deadline. Violations which occurred after November 30, 1985 (either as a result of plant modifications or because the plant was licensed after November 30, 1985) will be considered for enforcement action under the normal Enforcement Policy of 10 CFR Part 2, Appendix C.

In addition, EQ violations which are identified after the NRC's last first-round inspection, 1/ approximately mid-1988, will also be considered under the normal Enforcement Policy.

II. Application of the "Clearly Knew, or Should Have Known" Test Licensees who "clearly knew" they had equipment for which qualification could not be established may have committed a deliberate violation of NRC

requirements. This situation will be evaluated on a case-by-case basis.

The NRC will examine the circumstances in each case to determine whether the licensee 'clearly should have known" that its equipment was not quali- fied. The factors the NRC will examine include:

1. Did the licensee have vendor-supplied documentation that demonstrated that the equipment was qualified?

2. Did the licensee perform adequate receiving and/or field verification inspection to determine that the configuration of the installed equipment matched the configuration of the equipment that was qualified by the vendor?

3. Did the licensee have prior notice that equipment qualification deficiencies might exist?

4. Did other licensees identify similar problems and correct them before the deadline?

1/ First-round inspections are special team inspections to review licensees'

compliance with 10 CFR 50.49.

Enclosure - 2- In assessing whether the licensee clearly should have known of a deficiency, the Information provided to the licensees by the NRC and the industry on specific deficiencies will be taken into consideration. This information, and the timeliness of it being provided to licensees prior to the EQ

deadline are relevant factors. If one licensee determined that a specific EQ deficiency existed, it would not be assumed that all licensees should have also come to the same conclusion unless information about the specific deficiency had been widely disseminated within the industry or by the NRC.

The staff will carefully consider these criteria when evaluating whether a licensee clearly should have known of a deficiency prior to the deadline.

III. EQ Violations not Sufficiently Significant to Merit a Civil Penalty Under the Modified Policy Any failure to adequately list and demonstrate qualification of equipment required by 10 CFR 50.49 may constitute a violation of the rule. This does not require, however, that all violations of the rule be considered for escalated enforcement or be assessed a civil penalty. For example, if the qualification file presented to the Inspector during an Inspection did not demonstrate or support qualification of equipment, the equipment would be considered unqualified 2/ and 10 CFR 50.49 requirements would be violated.

However, although not iin the qualification file, if sufficient data exists or is developed during the inspection to demonstrate qualification of the equipment or, based on other information available to the inspector, the specific equipment is qualifiable for the application in question, the qualification deficiency is not considered sufficiently significant for assessment of civil penalties. These violations would be considered to be Severity Level IV or Severity Level V violations based on a violation of

10 CFR 50.49 requirements at the time of the inspection.

Programmatic violations or problems that are identified as a result of the EQ Inspections that involve several EQ violations which themselves would not be considered sufficiently significant to merit a civil penalty under the modified EQ enforcement policy nonetheless may be aggregated and evaluated for escalated enforcement action (generally Severity Level III) for the failure to satisfy applicable requirements of 10 CFR

50.49 and/or 10 CFR Part 50, Appendix B. The civil penalties for these violations would be assessed under the normal Enforcement Policy of

10 CFR Part 2, Appendix C (Supplement I).

IV. Basis for Determining Civil Penalties A. Base Civil Penalty Significant EQ violations, for which the licensee clearly should have known that they had equipment for which qualification had not been established,

2/ For purposes of enforcement, Ounqualifid equipmentu means equipment for which there is not adequate documentation to establish that this equipment will perform its intended functions in the relevant environment.

A

Enclosure -3- are to be considered together, in the aggregate, and the base civil penalty assessed in a graded approach based on the number of systems or components affected. 3/

The base civil penalty would be determined as described below.

EQ Violation Category Base Civil Penalty A. Extensive; EQ violations affecting many $300,000

systems and many components.

B. Moderate; EQ violations affecting some $150,000

systems and some components.

C. Isolated; EQ violations affecting a $ 75,000

limited number of systems and components.

The three EQ violation categories reflect the overall pervasiveness and the general safety significance of significant EQ violations. The NRC

considers violations of EQ requirements to be safety significant because the electrical equipment required to be qualified were those which have importance to safety. The violation categories do not include those EQ

violations which have been determined to be not sufficiently significant standing alone to be considered for escalated enforcement and which will be normally considered as Severity Level IV or V violations, as described in Section III. As stated in Section III, however, programmatic problems may be the subject of escalated enforcement action under the NRC's normal Enforcement Policy.

The significance of the EQ violations is considered when the NRC evaluates the number of systems affected by the EQ violations and determines the EQ

violation category. The NRC will assume, for escalated enforcement cases, that the unqualified equipment could affect operability of the associated system. The NRC will not consider refinements on the operability arguments such as the actual timreThe equipment is required to be operable, admini- strative measures or controls available to ensure the safety function is accomplished, the degree to which the operability of a system is affected, or, that through additional analyses or testing, the equipment may be demonstrated to be qualified or qualifiable. This assumption is made for enforcement purposes in order to reduce the resources anticipated to be spent by licensees and the NRC to evaluate in detail whether system operability was in question.

3/ The EQ violation categories (A-C) will be used rather than the severity levels in the normal Enforcement Policy of 10 CFR Part 2, Appendix C.

The base civil penalty for the violations will be applied consistent with the statutory limits on civil penalties under Section 234 of the Atomic Energy Act.

Enclosure - 4 -

Because the NRC is considering enforcement action rather than a justifica- tion for continued operation and the EQ deficiencies have been corrected in most instances, the NRC will make a conservative judgment as to the overall safety significance of the EQ violations based on the number of safety systems affected. This approach has the benefits of a relatively quick, though conservative, view on the safety consequences of unqualified equipment and wil) focus on the underlying cause of the EO violations.

Cases involving deliberate violations or very serious EQ violations (more safety significant than considered in this modified enforcement policy such as widespread breakdowns or clearly inoperable systems) will be evaluated on a case-by-case basis and may be subject to more severe sanctions than those described in this policy.

B. Mitigation/Escalation Factors Mitigation and escalation of the base civil penalty determined in Section IY.A will be considered in the determination of the civil penalty amount.

The NRC will consider the EQ violations In aggregate, not based on individual violations. Adjustment of the base civil penalty will be considered as described below:

Mitigation/Escalation Factors Maximum Mitigation/

Escalation Amount (from base civil penalty)

1. Identification and prompt reporting, if required, +/- 50%

of the EQ violations (including opportunities to identify and correct the deficiencies).

2. Best efforts to complete EQ within the deadline. i 50%

3. Corrective actions to result in full compliance 50%

(including the time taken to make an operability or qualification determination, the quality of any supporting analysis, and the nature and extent of the licensee's efforts to come into compliance).

4. Duration of violation which is significantly below - 50%

100 days.

In order to be fair and equitable to those licensees who took appropriate actions prior to November 30, 1985 or shut down prior to this date to be in compliance, civil penalties generally should not be less than $50,000

to emphasize that a significant environmental qualification failure is unacceptable.

The NRC will, however, consider full mitigation (no civil penalty) for those EQ violations which satisfy all of the five following criteria:

(1)violations which are Isolated and affect a limited number of systems and components, (2)violations which are identified by the licensee,

(3)violations which are promptly reported to the NRC, if required,

(4)violations which are corrected and actions taken will result in full compliance within a reasonable time, and (5)violations for which the licensee has demonstrated best efforts to complete EQ within the deadline.

Enclosure - 5- The intent of full mitigation of the civil penalty for EQ violations which meet all five criteria is to increase the incentive for self- identification of EQ deficiencies which might not otherwise be found by NRC. The NRC will generally issue only a Notice of Violation for violations which meet all these criteria.

If the licensee is able to convincingly demonstrate at the time of the inspection, or shortly thereafter, that an item is not required to be on the EQ list, then the item would not be considered for enforcement action.

The NRC does not intend to consider for enforcement purposes the results of a licensee's after-the-fact testing for mitigation where the licensee clearly should have known that its documentation was not sufficient.

J, L.air OF RECENTLY ISSUED GENEV _ LETTERS

Generic Date of Letter No. Subject Issuance Issued To GL 88-06 REMOVAL OF ORGANIZATION CHARTS 03/22/BB ALL POWER

FROM TECHNICAL SPECIFICATION REACTOR

ADMINISTRATIVE CONTROL LICENSEES AND

REQUIREMENTS APPLICANTS

GL 88-05 BORIC ACID CORROSION OF CARBON 03/17/88 ALL LICENSEES

STEEL REACTOR PRESSURE OF OPERATING

BOUNDARY COMPONENTS IN PWRS AND

PWR PLANTS HOLDERS OF

CONSTRUCTION

PERMITS FOR

PWRS

GL 88-04 DISTRIBUTION OF GEMS 02/23/88 ALL NON-POWER

IRRADIATED IN RESEARCH REACTOR

REACTORS LICENSEES

GL 88-03 RESOLUTION OF GENERIC SAFETY 02/17/88 ALL LICENSEES,

ISSUE 93, "STEAM BINDING OF APPLICANTS FOR

AUXILIARY FEEDWATER PUMPS" OPERATING

LICENSES, AND

HOLDERS OF

CONSTRUCTION

PERMITS FOR

PRESSURIZED

WATER REACTORS

GL 8E-02 "INTEGRATED SEFETY ASSESSMENT 01/20/88 ALL POWER

PROGRAM II (ISAP II)' REACTOR

LICENSEES

GL 88-01 "NRC POSITION ON IGSCC IN BWR 01/25/88 ALL LICENSEES

AUSTENITIC STAINLESS STEEL OF OPERATING

PIPING" BOILING WATER

REACTORS AND

HOLDERS OF

CONSTRUCTION

PERMITS FOR

BWRS

GL 87-16 NUREG-1262, "ANSWERS TO 11/12/87 ALL POWER AND

QUESTIONS AT PUBLIC MEETINGS NONPOWER

RE IMPLEMENTATION OF 10 CFR55 REACTOR

ON OPERATORS LICENSEES AND

LICENSES APPLICANTS FOR

LICENSES

EL 87-15 POLICY STATEMENT ON DEFERRED 11/04/87 ALL HOLDERS OF

PLANTS CONSTRUCTION

PERMITS FOR A

NUCLEAR POWER

PLANT

GL B7-14 REQUEST FOR OPERATOR LICENSE 08/04/87 ALL POWER

SCHEDULES REACTOR

LICENSEES

Generic Letter 88-07 - 2 - April 7. 1988 DISTRIBUTION:

Central Files PDR

Murley/Sniezek FJMiraglia TMartin JLleberman HWong DCrutchfleld GHolahan

8804080088

5( ~ JI

Wjw~ #/N

OE D: OE

  • r XRf

4 NRR

HWong JLleberman GHolahan DCrutchfield lia

3/37 /88 3/3/88 UP /88 3/ /88 ~8