| issue date = 08/23/1985 | | issue date = 08/23/1985 | ||
| title = NRC Generic Letter 1985-017: Availability of Supplements 2 and 3 to NUREG-0933, a Prioritization of Generic Safety Issues | | title = NRC Generic Letter 1985-017: Availability of Supplements 2 and 3 to NUREG-0933, a Prioritization of Generic Safety Issues | ||
| author name = Thompson H | | author name = Thompson H | ||
| author affiliation = NRC/NRR | | author affiliation = NRC/NRR | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
{{#Wiki_filter:: | {{#Wiki_filter:: f.. N L -. UNITED STATES | ||
.1 I: %. ; . | I\l 0 | ||
-s I D4-cv§ I.-/ | {NCLAR REGULATORYCOMMISSION - | ||
; | * 0 WASHINGTON, D. C. 20555 August 23, 1985 TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING LICENSES, | ||
}} | AND HOLDERS OF CONSTRUCTION PERMITS (GENERIC LETTER 85-11) | ||
Gentlemen: | |||
SUBJECT: AVAILABILITY OF SUPPLEMENTS 2 and 3 TO NUREG-0933, "A PRIORITIZATION | |||
OF GENERIC SAFETY ISSUES" | |||
This letter is to inform you that Supplements 2 and 3 to NUREG-0933, "A | |||
Prioritization of Generic Safety Issues," were published in January and July 1985, respectively. These supplements present the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The safety priority rankings of HIGH, MEDIUM, LOW, and DROP have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors, as discussed in the Introduction of NUREG-0933. To the extent practical, estimates are quantitative. Although changes to nuclear power plant designs or operation are assumed, the sole purpose in prioritizing the issues is to estimate costs and other impacts that might result if such changes were implemented. | |||
The priority rankings in the report are based on generic assessments, i.e., | |||
assessments of plants thought to be typical of a class of plants. Thus, the safety significance of an issue might be greater (or less) for a specific plant because of features of the design or operation that are different from those assumed in the generic assessments. | |||
The supplements contain: (1) the issues that have been resolved since the publication of NUREG-0933 Supplement 1 in July 1984; (2) the issues that have been removed from further consideration by the NRC (i.e., those issues with LOW or DROP priority rankings); and (3) the issues that are in the process of resolution (i.e., those issues nearly-resolved or with HIGH or MEDIUM priority rankings). | |||
NUREG-0933 and its 3 supplements may be purchased by calling (202) 275-2060 | |||
or (202) 275-2171 or by writing to the Superintendent of Documents, U.S | |||
Government Printing Office, Post Office Box 37082, Washington, D.C. 20013- | |||
7082, or the National Technical Information Service, Department of Commerce, | |||
5258 Port Royal Road, Springfield, VA 22161. | |||
AII | |||
<41) | |||
pD AOC 0227> | |||
fZ J53bbcl)C99 | |||
.1 I: %. ; . w I - : | |||
a . i . : K-4 \ | |||
.I ; | |||
A | |||
This letter does not contain any new requirements or guidance for licensees of operating reactors, applicants for operating licenses, and holders construction permits. No reply is required. If you have any questionsofon the subject, please contact Ronald Emrlt on (301) 492-4960. | |||
Rugt '.Tho ~on, . baor Di v on of Licensing Office of Nuclear Reactor Regulation cc: List of Generic Letters | |||
/ 'tr/ | |||
- s I D4 | |||
-cv§ I.-/9 TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING LICENSES, | |||
AND HOLDERS OF CONSTRUCTION PERMITS | |||
Gentlemen: | |||
SUBJECT: AVAILABILITY OF SUPPLEMENT 2 TO NUREG-0933, "A PRIORITIZATION OF | |||
GENERIC SAFETY ISSUES" | |||
This letter is to inform you that Supplement 2 to NUREG-0933, "A | |||
Prioritization of Generic Safety Issues," will be published in January 1985 and may be purchased by calling (301) 492-9530 or writing the NRC/GPO Sales Program, Division of Technical Information and Document Control, U.S. | |||
Nuclear Regulatory Commission, Washington, D.C. 20555, or the National Technical Information Service, Department of Commerce, 5258 Port Royal Road, Springfield, VA 22161. | |||
The Supplement presents the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for-the resolution of those safety issues that have a significant potential for reducing risk. | |||
The safety priority rankings of HIGH, MEDIUM, LOW, and DROP have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors, as discussed in the Introduction of NUREG-0933. To the extent practical, estimates are quantitative. Although changes to nuclear power plant designs or operation are assumed, the sole purpose-in prioritizing the issues is to estimate costs and other impacts that might result if such changes were implemented. | |||
The priority rankings in the report are based on generic assessments, i.e., | |||
assessments of plants thought to be typical of a class of plants. Thus, the safety significance of an issue might be greater (or less) for a specific plant because of features of the design or operation that are different from those assumed in the generic assessments. | |||
The Supplement contains: (1) the issues that have been resolved since the publication of NUREG-0933 Supplement 1 in July 1984; (2)the issues that have been removed from further consideration by the NRC (i.e., those issues with LOW or DROP priority rankings); and (3) the issues that are in the process of resolution (i.e., those issues nearly-resolved or with HIGH or 00 | |||
MEDIUM priority rankings). | |||
85082102- -W | |||
OrnateR ..... ;................... .... ............... ...... .. ,,,,........ .... ,........... ...... ,,,.................................... ......... ............. | |||
SURNAM Ei ........................ ........................ ................ ........ ........................ ........................ ........................ ........................ | |||
DATt ................. . ......................... ......................... ..... I.......................... . ........................ | |||
NAC FORM | |||
t4RC (10 80) | |||
316 (10 NRCM 0240 OFFICIAL RECORD COPY USGO 11-3-M0 | |||
FORM 316 K0) NRCM 0240 O FFICIA L R EC O RD C OPY USGPO 1961-335-964 | |||
I" - b1 | |||
- Of 0 | |||
LIST OF RECENTLY.ISSUED GENERIC LETTERS | |||
t GENERIC | |||
LETTER NO. SUBJECT DATE | |||
85-01 ,Fire Protection Policy Steering.Committee, , . | |||
Report; -/9/8S; | |||
85-02 Staff Recommended Actions .itemmninq From NRC | |||
Integrated Program for the Resolution of Unresolved Safety Issues Regarding Steam Generator Tube Integrity 4/15/85 | |||
85-03 Clarificationrof Equivalent Control Capacity V128/85 For Standby Liquid Control Systems | |||
85-04 Operator Licensing Examinations 1/29/85 | |||
85-05 Inadvertent Boron Dilution Events . | |||
. - .,, '1/31/85 | |||
85-06 Quality Assurance Guidance for ATWS | |||
Equipment that is not Safety-Related 4/16/85 | |||
85-07 Implementation of Integrated Schedules 5/02/85 for Plant Modifications | |||
85-08 10 CFR 20.408 Termination Reports - Format 5/23/85 | |||
85-09 Technical Specifications for Generic Letter 83-28, Item 4.3- 5/23/85 - -- | |||
85-10 Technical Specifications for Generic Letter 83-28, Items 4.3 and 4.4 5/23/85 | |||
85-11 Completion of Phase II of "Control of 6/28/85 Heavy Loads at Nuclear Power Plants" | |||
NUREG-0612 | |||
85-12 Implementation of TMI Action Item II.K.3.5, | |||
"Automatic Trip of Reactor Coolant Pumps" 6/28/85 | |||
85-13 Transmittal of NUREG-1154 Regarding the Davis Besse Loss of Main and Auxiliary Feedwater Event 8/5/85 | |||
84-14 Commercial Storage at Power Reactor Sites of Low Level Radioactive Waste not Generated by the Utility 8/1/85 | |||
85-15 Information Relating to the Deadlines for Compliance with 10 CFR 50.49, "Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants 8/6/85 | |||
85-16 High Boron Concentrations 8/23/85 | |||
85-17 Availability of Supplements 2 & 3 to NUREG-0933, "A Prioritization of Generic Safety Issues 8/23/85 | |||
C' ;I / ef K) | |||
-2- This letter does not con'tain any new requirements or guidance for licensees of operating reactors, applicants for operating licenses, and holders of construction permits. No reply is required. | |||
m signed bF | |||
Wugh L-Thmnson, Jr. | |||
Hugh L. Thompson, Jr, Director Division of Licensing Office of Nuclear Reactor Regulation cc: List of Generic Letters Vr. | |||
D/ ikjbl r( | |||
OFFCE S p W.E p . B ...................... | |||
........ | |||
................ | |||
..... | |||
REmrit:s.-J Wners F owsp e TSpei t SU Ai l/885 ................' ES4s .......... | |||
ArA .... .. 0240 ''0 OFFIC'AL | |||
'-'.' RECORD | |||
''. COPY '''. .'' . .... . . | |||
H4RC FOAM~31t (10 0) NRCM 0240 O FFICIA L R EC O RD C OPY USGPO 19NI-335-960}} | |||
{{GL-Nav}} | {{GL-Nav}} |
Latest revision as of 03:55, 24 November 2019
- f.. N L -. UNITED STATES
I\l 0
{NCLAR REGULATORYCOMMISSION -
- 0 WASHINGTON, D. C. 20555 August 23, 1985 TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING LICENSES,
AND HOLDERS OF CONSTRUCTION PERMITS (GENERIC LETTER 85-11)
Gentlemen:
SUBJECT: AVAILABILITY OF SUPPLEMENTS 2 and 3 TO NUREG-0933, "A PRIORITIZATION
OF GENERIC SAFETY ISSUES"
This letter is to inform you that Supplements 2 and 3 to NUREG-0933, "A
Prioritization of Generic Safety Issues," were published in January and July 1985, respectively. These supplements present the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The safety priority rankings of HIGH, MEDIUM, LOW, and DROP have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors, as discussed in the Introduction of NUREG-0933. To the extent practical, estimates are quantitative. Although changes to nuclear power plant designs or operation are assumed, the sole purpose in prioritizing the issues is to estimate costs and other impacts that might result if such changes were implemented.
The priority rankings in the report are based on generic assessments, i.e.,
assessments of plants thought to be typical of a class of plants. Thus, the safety significance of an issue might be greater (or less) for a specific plant because of features of the design or operation that are different from those assumed in the generic assessments.
The supplements contain: (1) the issues that have been resolved since the publication of NUREG-0933 Supplement 1 in July 1984; (2) the issues that have been removed from further consideration by the NRC (i.e., those issues with LOW or DROP priority rankings); and (3) the issues that are in the process of resolution (i.e., those issues nearly-resolved or with HIGH or MEDIUM priority rankings).
NUREG-0933 and its 3 supplements may be purchased by calling (202) 275-2060
or (202) 275-2171 or by writing to the Superintendent of Documents, U.S
Government Printing Office, Post Office Box 37082, Washington, D.C. 20013-
7082, or the National Technical Information Service, Department of Commerce,
5258 Port Royal Road, Springfield, VA 22161.
AII
<41)
pD AOC 0227>
fZ J53bbcl)C99
.1 I: %. ; . w I - :
a . i . : K-4 \
.I ;
A
This letter does not contain any new requirements or guidance for licensees of operating reactors, applicants for operating licenses, and holders construction permits. No reply is required. If you have any questionsofon the subject, please contact Ronald Emrlt on (301) 492-4960.
Rugt '.Tho ~on, . baor Di v on of Licensing Office of Nuclear Reactor Regulation cc: List of Generic Letters
/ 'tr/
- s I D4
-cv§ I.-/9 TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING LICENSES,
AND HOLDERS OF CONSTRUCTION PERMITS
Gentlemen:
SUBJECT: AVAILABILITY OF SUPPLEMENT 2 TO NUREG-0933, "A PRIORITIZATION OF
GENERIC SAFETY ISSUES"
This letter is to inform you that Supplement 2 to NUREG-0933, "A
Prioritization of Generic Safety Issues," will be published in January 1985 and may be purchased by calling (301) 492-9530 or writing the NRC/GPO Sales Program, Division of Technical Information and Document Control, U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555, or the National Technical Information Service, Department of Commerce, 5258 Port Royal Road, Springfield, VA 22161.
The Supplement presents the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for-the resolution of those safety issues that have a significant potential for reducing risk.
The safety priority rankings of HIGH, MEDIUM, LOW, and DROP have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors, as discussed in the Introduction of NUREG-0933. To the extent practical, estimates are quantitative. Although changes to nuclear power plant designs or operation are assumed, the sole purpose-in prioritizing the issues is to estimate costs and other impacts that might result if such changes were implemented.
The priority rankings in the report are based on generic assessments, i.e.,
assessments of plants thought to be typical of a class of plants. Thus, the safety significance of an issue might be greater (or less) for a specific plant because of features of the design or operation that are different from those assumed in the generic assessments.
The Supplement contains: (1) the issues that have been resolved since the publication of NUREG-0933 Supplement 1 in July 1984; (2)the issues that have been removed from further consideration by the NRC (i.e., those issues with LOW or DROP priority rankings); and (3) the issues that are in the process of resolution (i.e., those issues nearly-resolved or with HIGH or 00
MEDIUM priority rankings).
85082102- -W
OrnateR ..... ;................... .... ............... ...... .. ,,,,........ .... ,........... ...... ,,,.................................... ......... .............
SURNAM Ei ........................ ........................ ................ ........ ........................ ........................ ........................ ........................
DATt ................. . ......................... ......................... ..... I.......................... . ........................
NAC FORM
t4RC (10 80)
316 (10 NRCM 0240 OFFICIAL RECORD COPY USGO 11-3-M0
FORM 316 K0) NRCM 0240 O FFICIA L R EC O RD C OPY USGPO 1961-335-964
I" - b1
- Of 0
LIST OF RECENTLY.ISSUED GENERIC LETTERS
t GENERIC
LETTER NO. SUBJECT DATE
85-01 ,Fire Protection Policy Steering.Committee, , .
Report; -/9/8S;
85-02 Staff Recommended Actions .itemmninq From NRC
Integrated Program for the Resolution of Unresolved Safety Issues Regarding Steam Generator Tube Integrity 4/15/85
85-03 Clarificationrof Equivalent Control Capacity V128/85 For Standby Liquid Control Systems
85-04 Operator Licensing Examinations 1/29/85
85-05 Inadvertent Boron Dilution Events .
. - .,, '1/31/85
85-06 Quality Assurance Guidance for ATWS
Equipment that is not Safety-Related 4/16/85
85-07 Implementation of Integrated Schedules 5/02/85 for Plant Modifications
85-08 10 CFR 20.408 Termination Reports - Format 5/23/85
85-09 Technical Specifications for Generic Letter 83-28, Item 4.3- 5/23/85 - --
85-10 Technical Specifications for Generic Letter 83-28, Items 4.3 and 4.4 5/23/85
85-11 Completion of Phase II of "Control of 6/28/85 Heavy Loads at Nuclear Power Plants"
85-12 Implementation of TMI Action Item II.K.3.5,
"Automatic Trip of Reactor Coolant Pumps" 6/28/85
85-13 Transmittal of NUREG-1154 Regarding the Davis Besse Loss of Main and Auxiliary Feedwater Event 8/5/85
84-14 Commercial Storage at Power Reactor Sites of Low Level Radioactive Waste not Generated by the Utility 8/1/85
85-15 Information Relating to the Deadlines for Compliance with 10 CFR 50.49, "Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants 8/6/85
85-16 High Boron Concentrations 8/23/85
85-17 Availability of Supplements 2 & 3 to NUREG-0933, "A Prioritization of Generic Safety Issues 8/23/85
C' ;I / ef K)
-2- This letter does not con'tain any new requirements or guidance for licensees of operating reactors, applicants for operating licenses, and holders of construction permits. No reply is required.
m signed bF
Wugh L-Thmnson, Jr.
Hugh L. Thompson, Jr, Director Division of Licensing Office of Nuclear Reactor Regulation cc: List of Generic Letters Vr.
D/ ikjbl r(
OFFCE S p W.E p . B ......................
........
................
.....
REmrit:s.-J Wners F owsp e TSpei t SU Ai l/885 ................' ES4s ..........
ArA .... .. 0240 0 OFFIC'AL
'-'.' RECORD
. COPY . . . .... . .
H4RC FOAM~31t (10 0) NRCM 0240 O FFICIA L R EC O RD C OPY USGPO 19NI-335-960