NRC Generic Letter 1989-12: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:
| page count = 6
| page count = 6
}}
}}
{{#Wiki_filter:* to REG(, UNITED STATES% XNUCLEAR REGULATORY  
{{#Wiki_filter:* to REG(,
COMMISSION
                                      UNITED STATES
e :WASHINGTON, D. C. 20555 July 6, 1989 TO: ALL POWER REACTOR LICENSEES  
              % XNUCLEAR             REGULATORY COMMISSION
AND APPLICANTS  
e         :WASHINGTON,                         D. C. 20555 July 6, 1989 TO:           ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN
FOR AN OPERATING  
                OPERATING LICENSE
LICENSE SUBJECT: OPERATOR LICENSING  
  SUBJECT:     OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 89- 1i Generic Letter (GL) 89-03, dated March 24, 1989, promulgated the United States Nuclear Regulatory Commission's (NRC's) national examination schedule. It assigned each facility two examination dates during the fiscal year based, to the extent possible, upon the examination estimates reported in response to GL
EXAMINATIONS (GENERIC LETTER 89- 1i Generic Letter (GL) 89-03, dated March 24, 1989, promulgated the United States Nuclear Regulatory Commission's (NRC's) national examination schedule.
  88-13, dated August 8, 1988. It encouraged facilities to target the assigned examination dates in fiscal year 1990, which begins on October 1, 1989, but acknowledged that some deviation from the promulgated schedule would be accommodated to facilitate incremental training schedule revisions. Beginning in fiscal year 1991 (October 1, 1990), replacement examinations will not be rescheduled but deferred until the next regularly scheduled site visit.


It assigned each facility two examination dates during the fiscal year based, to the extent possible, upon the examination estimates reported in response to GL 88-13, dated August 8, 1988. It encouraged facilities to target the assigned examination dates in fiscal year 1990, which begins on October 1, 1989, but acknowledged that some deviation from the promulgated schedule would be accommodated to facilitate incremental training schedule revisions.
To plan its resources for fiscal years 1990 through 1993, the Office of Nuclear Reactor Regulation (NRR) requires your input to update the number of candidates you provided in response to GL 88-13. On the proposed format provided as Enclosure 1, please provide your best estimate of the anticipated number of candidates to be examined during each site visit assigned to you in Generic Letter 89-03. Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2. Your schedules, to be voluntarily submitted on the enclosed suggested formats, should be returned to Mr. Kenneth E.


Beginning in fiscal year 1991 (October 1, 1990), replacement examinations will not be rescheduled but deferred until the next regularly scheduled site visit.To plan its resources for fiscal years 1990 through 1993, the Office of Nuclear Reactor Regulation (NRR) requires your input to update the number of candidates you provided in response to GL 88-13. On the proposed format provided as Enclosure
Perkins, Jr., Chief, Operator Licensing Branch, OWFN-IOD-18, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a courtesy copy to the appropriate Regional Administrator, by September 1, 1989.
1, please provide your best estimate of the anticipated number of candidates to be examined during each site visit assigned to you in Generic Letter 89-03. Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure
2. Your schedules, to be voluntarily submitted on the enclosed suggested formats, should be returned to Mr. Kenneth E.Perkins, Jr., Chief, Operator Licensing Branch, OWFN-IOD-18, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a courtesy copy to the appropriate Regional Administrator, by September  
1, 1989.Bear in mind that 10 CFR 55.45 (b)(2)(iv)
prohibits the simulation facility portion if the operating test from being administered on other than a certified or an approved simulation facility after May 26, 1991. In anticipation of that deadline, NRR requires your best estimate of the dates on which you expect to certify and/or apply for NRC approval of your simulation facility(ies).
A space has been provided for this purpose on the Proposed Operator Licensing Schedule Format, Enclosure
1.The NRC regional offices, through direct liaison with your training managers, will confirm your examination requests.


As stated in GL 89-03, the regional offices will continue to schedule NRC requalification examinations on a case-by-case basis until NRR reconciles the differences between the requalification and replacement examination methodologies in order to allow the concurrent administration of both examinations.
Bear in mind that 10 CFR 55.45 (b)(2)(iv) prohibits the simulation facility portion if the operating test from being administered on other than a certified or an approved simulation facility after May 26, 1991. In anticipation of that deadline, NRR requires your best estimate of the dates on which you expect to certify and/or apply for NRC approval of your simulation facility(ies). A space has been provided for this purpose on the Proposed Operator Licensing Schedule Format, Enclosure 1.


89OO
The NRC regional offices, through direct liaison with your training managers, will confirm your examination requests. As stated in GL 89-03, the regional offices will continue to schedule NRC requalification examinations on a case-by-case basis until NRR reconciles the differences between the requalification and replacement examination methodologies in order to allow the concurrent administration of both examinations.
July 6, 1989 Generic Letter 89-12-2 -This request is covered by Office of Management and Budget Clearance Number 3150-0131, which expires March 31, 1992. The estimated average burden is two person-hours per owner response, including assessment of the new recommendations, searching data sources, gathering and analyzing the data, and preparing the required letters. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0131), Office of Management and Budget, Washington, D.C. 20503.We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Perkins at (301) 492-1031.Sincerely, Ja s G. Partlow, Associate Director r Projects Office of Nuclear Reactor Regulation Enclosures:
 
1. Proposed Operator Licensing Examination Schedule Format 2. Proposed Requalification Examination Schedule Format 3. List of Recently Issued NRC Generic Letters Generic Letter 89-12-2-July 6, 1989 this request is covered by Office of Management and Budget Clearance Number 3150-0131, which expires March 31, 1992. The estimated average burden is two person-hours per owner response, including assessment of the new recommendations, searching data sources, gathering and analyzing the data, and preparing the required letters. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0131), Office of Management and Budget, Washington, D.C. 20503.We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Perkins at (301) 492-1031.Sincerely, ORIGINAL SIGNED BY JAMES G. PARTLOW James 6. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
89OO
1. Proposed Operator Licensing Examination Schedule Format 2. Proposed Requalification Examination Schedule Format 3. List of Recently Issued NRC Generic Letters DISTRIBUTION:
 
Central Files SCooley TMurley NRC PDR KPerkins JSniezek OLB RF JZwolinski CBerlinger PD RF JWRoe FMiraglia FGuenther JPartlow HSmith*SEE PREVIOUS PAGE FOR CONCURRENCE
- 2 -                           July 6, 1989 Generic Letter 89-12 This request is covered by Office of Management and Budget Clearance Number
Reviewed by B. Calure, Technical Editor, on 6/2/89.GUENTHER -20 Ad OFC :OLB:DLPQ  
3150-0131, which expires March 31, 1992. The estimated average burden is two person-hours per owner response, including assessment of the new recommendations, searching data sources, gathering and analyzing the data, and preparing the required letters. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0131),
DOLB:DLPQ  
Office of Management and Budget, Washington, D.C. 20503.
:OLB:DLPQ:BC
 
:DDIR:DLPQ  
We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Perkins at (301) 492-1031.
:DIR:DLPQ  
 
:AWDT______-----  
Sincerely, Ja s G. Partlow, Associate Director r Projects Office of Nuclear Reactor Regulation Enclosures:
________________
1. Proposed Operator Licensing Examination Schedule Format
________--------------:--  
2. Proposed Requalification Examination Schedule Format
'----------  
3. List of Recently Issued NRC Generic Letters
%,Is ------ --NAME :FGuenther:rh*
 
:SCooley*
-2-                                                         July 6, 1989 Generic Letter 89-12 and Budget Clearance Number this request is covered by Office of Managementestimated average burden is two The
:KPerkins*  
              3150-0131, which expires March 31, 1992.                       assessment of the new recommendations, person-hours per owner response,                 including the data, and preparing the searching data sources, gathering and analyzing               this burden estimate or any other required letters. Send comments regarding including suggestions for reducing aspect of this collection of information,Management Branch, Division of this burden, to the Records and Reports                                         Resources Management, Information Support Services, Office of Information               Reduction Project (3150-0131),
:JZ v hnki : J3f :FMir______* _______ ______ ______________-
              Washington, D.C. 20555; and to the Paperwork D.C. 20503.
_____- ____- ___- __ ___ __ __ -- --- ------------
 
-------------
Office of Management and Budget, Washington, and invite you to address any We appreciate your assistance in this matter Mr. Perkins at (301) 492-1031.
DATE :5/25/89 :5/25/89 :5/25/89 : /7A'89 : 6/ 7'/89 : (06 3/89 UFC : - : :--- :e -NAME :CBerlinger  
 
:JPart ow DATE : klj~/T89 (e / /89 *  
questions concerning this generic letter to Sincerely, ORIGINAL SIGNED BY JAMES G. PARTLOW
Enclosure  
                                                                        James 6. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1 PROPOSED OPERATOR LICENSING  
                1. Proposed Operator Licensing Examination Schedule Format
EXAMINATION  
                2. Proposed Requalification Examination Schedule Format
SCHEDULE FORMAT Facility NRC Region FY 199U FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)  
                3. List of Recently Issued NRC Generic Letters DISTRIBUTION:
(10/1/90-9/30/91)  
                Central Files SCooley                     TMurley NRC PDR         KPerkins                 JSniezek OLB RF         JZwolinski               CBerlinger PD RF           JWRoe                     FMiraglia FGuenther       JPartlow                 HSmith
J10/1/91-9/30/92)  
                  *SEE PREVIOUS PAGE FOR CONCURRENCE
(1u/1/92-9/30/93)
                                                                              on 6/2/89.
1. Assigned Date (GL 89-03)ERO fSRO Instant ISRU Upgrade ISRO Limited 2. Assigned Date (GL 89-03)IRO#SRO Instant_#SRO Upgrade#SRO Limited_Please indicate Initial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks  
 
(**). tfor example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")  
Reviewed by B. Calure, Technical Editor, GUENTHER - 20                                                                                                       Ad
Enclosure  
                                                                                :DDIR:DLPQ               :DIR:DLPQ                 :AWDT
2 PROPOSED REQUALIFICATION  
OFC        :OLB:DLPQ             DOLB:DLPQ               :OLB:DLPQ:BC                                                                              - -
EXAMINATION  
                                                                                        '----------         %,Is          ------
SCHEDULE FORMAT Facility NRC Region Planned Simulation Facility Certification/Approval Date FY 1990 FY 1991 FY 1992 (10/1189-9/30/90)  
            ________________
(10/1/90-9130/91)  
    ______-----                ________--------------:--                                                                          :FMir
(10/1/91-9/30/92)
                                                        :KPerkins*             :JZ v       hnki         :J3f NAME      :FGuenther:rh*      :SCooley*                         ____-   ___-   __ ___ --    - __-- __-       -----------         -------------
1. Date Date Date 2. Date Date Date 3. Date Date Date., 4. Date Date Date 5. Date Date Date FY 1993 FY 1993 (10/1/92-9/30/93)
                                ______________-           _____-
Date Date Date Date Date- ENCLOSURE  
    ______*  _______  ______
3 LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No.Date of Subject Issuance Issued To 89-12 GENERIC LETTER 89-12: OPERATOR LICENSING EXAMINATIONS
                                                                                :     /7A'89             : 6/ 7'/89                : (063/89 DATE      :5/25/89             :5/25/89                 :5/25/89
GENERIC LETTER 89-11: RESOLUTION  
                                                :      :                                                :
OF GENERIC ISSUE 101 WBOILING WATER REACTOR WATER LEVEL REDUNDANCYN
UFC
7/6/89 6/30/89 89-11 89-10 GENERIC LETTER 89-10: 6/28/89 SAFETY-RELATED  
            :e                                                                 -
MOTOR-OPERATED
NAME       :CBerlinger         :JPart ow DATE       : klj~/T89           (e   /         /89     *
VALVE TESTING AND SURVEILLANCE
 
89-09 ASME SECTION III COMPONENT REPLACEMENTS
Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT
ISSUANCE OF GENERIC LETTER 89-08: EROSION/CORROSION  
Facility                                         NRC Region FY 199U           FY 1991           FY 1992         FY 1993
-INDUCED PIPE WALL THINNING -10 CFR §50.54(f)5/8/89 5/2/89 LICENSE TO ALL POWER REACTORS BWRS, PWRS, AND VENDORS IN ADDITION TO GENERAL CODES APPLICABLE  
            (10/1/89-9/30/90) (10/1/90-9/30/91) J10/1/91-9/30/92) (1u/1/92-9/30/93)
TO GENERIC LETTERS ALL BWR PLANTS &ALL LISTINGS APPLICABLE
1. Assigned Date (GL 89-03)
TO GENERIC LETTERS &VENDORS, ETC.LICENSEES
    ERO
TO ALL POWER REACTORS, BWRS, PWRS, AND VENDORS IN ADDITION TO GENERAL CODES APPLICABLE  
  fSRO Instant ISRU Upgrade ISRO Limited
TO GENERIC LETTERS ALL HOLDERS OF LIGHT WATER REACTOR OPERATING
2. Assigned Date (GL 89-03)
LICENSES LICENSEES
    IRO
TO ALL POWER REACTORS, BWRS, PWRS, AND VENDORS IN ADDITION TO GENERAL CODES APPLICABLE  
    #SRO Instant_
TO GENERIC LETTERS LICENSEES
    #SRO Upgrade
TO ALL BWRS, PWRS, AND VENDORS IN ADDITION TO GENERAL CODES APPLICABLE
    #SRO Limited_
TO GENERIC LETTERS LICENSEES
Please indicate Initial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**). tfor example, if Unit
OF ALL POWER REACTORS, BWRS, PWRS, HTGR, AND NSSS VENDORS IN ADDITION TO GENERAL CODES APPLICABLE
1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")
TO GENERIC LETTERS 89-08 89-07 89-06 GENERIC LETTER 89-07, POWER 4/28/89 REACTOR SAFEGUARDS
 
CONTINGENCY
Enclosure 2 FORMAT
PLANNING FOR SURFACE VEHICLE BOMBS TASK ACTION PLAN ITEM I.D.2 -4/12/89 SAFETY PARAMETER
              PROPOSED REQUALIFICATION EXAMINATION SCHEDULE
DISPLAY SYSTEM -10 CFR §50.54(f)}}
                                              NRC Region Facility Date Planned Simulation Facility Certification/Approval                 FY 1993 FY 1992          FY 1993 FY 1990             FY 1991                         (10/1/92-9/30/93)
    (10/1189-9/30/90)     (10/1/90-9130/91) (10/1/91-9/30/92)
                              Date             Date           Date
1.     Date Date             Date           Date
2.     Date Date               Date.,         Date
3.     Date Date               Date           Date
4.     Date Date               Date          Date-
5.    Date
 
ENCLOSURE 3 LIST OF RECENTLY ISSUED GENERIC LETTERS
Generic                                   Date of Letter No. Subject                       Issuance       Issued To
89-12     GENERIC LETTER 89-12:         7/6/89        LICENSE TO ALL
          OPERATOR LICENSING                           POWER REACTORS
          EXAMINATIONS                                  BWRS, PWRS, AND
                                                        VENDORS IN ADDITION
                                                        TO GENERAL CODES
                                                        APPLICABLE TO
                                                        GENERIC LETTERS
89-11      GENERIC LETTER 89-11:         6/30/89        ALL BWR PLANTS &
          RESOLUTION OF GENERIC ISSUE                   ALL LISTINGS
          101 WBOILING WATER REACTOR                   APPLICABLE TO
          WATER LEVEL REDUNDANCYN                       GENERIC LETTERS &
                                                        VENDORS, ETC.
 
89-10     GENERIC LETTER 89-10:         6/28/89       LICENSEES TO ALL
          SAFETY-RELATED MOTOR-OPERATED                 POWER REACTORS,
          VALVE TESTING AND SURVEILLANCE               BWRS, PWRS, AND
                                                        VENDORS IN ADDITION
                                                        TO GENERAL CODES
                                                        APPLICABLE TO
                                                        GENERIC LETTERS
89-09     ASME SECTION III COMPONENT     5/8/89        ALL HOLDERS OF LIGHT
          REPLACEMENTS                                 WATER REACTOR
                                                        OPERATING LICENSES
89-08      ISSUANCE OF GENERIC LETTER     5/2/89        LICENSEES TO ALL
          89-08: EROSION/CORROSION -                    POWER REACTORS,
          INDUCED PIPE WALL THINNING -                 BWRS, PWRS, AND
          10 CFR §50.54(f)                             VENDORS IN ADDITION
                                                        TO GENERAL CODES
                                                        APPLICABLE TO
                                                        GENERIC LETTERS
89-07      GENERIC LETTER 89-07, POWER 4/28/89          LICENSEES TO ALL
          REACTOR SAFEGUARDS CONTINGENCY                BWRS, PWRS, AND
          PLANNING FOR SURFACE VEHICLE                  VENDORS IN ADDITION
          BOMBS                                        TO GENERAL CODES
                                                        APPLICABLE TO
                                                        GENERIC LETTERS
89-06      TASK ACTION PLAN ITEM I.D.2 - 4/12/89        LICENSEES OF ALL
          SAFETY PARAMETER DISPLAY                      POWER REACTORS,
          SYSTEM - 10 CFR §50.54(f)                    BWRS, PWRS, HTGR,
                                                        AND NSSS VENDORS
                                                        IN ADDITION TO
                                                        GENERAL CODES
                                                        APPLICABLE TO
                                                        GENERIC LETTERS}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 02:18, 24 November 2019

NRC Generic Letter 1989-012: Operator Licensing Examinations
ML031200747
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane
Issue date: 07/06/1989
From: Partlow J
Office of Nuclear Reactor Regulation
To:
References
GL-89-003 GL-89-012, NUDOCS 8907060026
Download: ML031200747 (6)


  • to REG(,

UNITED STATES

% XNUCLEAR REGULATORY COMMISSION

e :WASHINGTON, D. C. 20555 July 6, 1989 TO: ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN

OPERATING LICENSE

SUBJECT: OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 89- 1i Generic Letter (GL) 89-03, dated March 24, 1989, promulgated the United States Nuclear Regulatory Commission's (NRC's) national examination schedule. It assigned each facility two examination dates during the fiscal year based, to the extent possible, upon the examination estimates reported in response to GL 88-13, dated August 8, 1988. It encouraged facilities to target the assigned examination dates in fiscal year 1990, which begins on October 1, 1989, but acknowledged that some deviation from the promulgated schedule would be accommodated to facilitate incremental training schedule revisions. Beginning in fiscal year 1991 (October 1, 1990), replacement examinations will not be rescheduled but deferred until the next regularly scheduled site visit.

To plan its resources for fiscal years 1990 through 1993, the Office of Nuclear Reactor Regulation (NRR) requires your input to update the number of candidates you provided in response to GL 88-13. On the proposed format provided as Enclosure 1, please provide your best estimate of the anticipated number of candidates to be examined during each site visit assigned to you in Generic Letter 89-03. Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2. Your schedules, to be voluntarily submitted on the enclosed suggested formats, should be returned to Mr. Kenneth E.

Perkins, Jr., Chief, Operator Licensing Branch, OWFN-IOD-18, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a courtesy copy to the appropriate Regional Administrator, by September 1, 1989.

Bear in mind that 10 CFR 55.45 (b)(2)(iv) prohibits the simulation facility portion if the operating test from being administered on other than a certified or an approved simulation facility after May 26, 1991. In anticipation of that deadline, NRR requires your best estimate of the dates on which you expect to certify and/or apply for NRC approval of your simulation facility(ies). A space has been provided for this purpose on the Proposed Operator Licensing Schedule Format, Enclosure 1.

The NRC regional offices, through direct liaison with your training managers, will confirm your examination requests. As stated in GL 89-03, the regional offices will continue to schedule NRC requalification examinations on a case-by-case basis until NRR reconciles the differences between the requalification and replacement examination methodologies in order to allow the concurrent administration of both examinations.

89OO

- 2 - July 6, 1989 Generic Letter 89-12 This request is covered by Office of Management and Budget Clearance Number

3150-0131, which expires March 31, 1992. The estimated average burden is two person-hours per owner response, including assessment of the new recommendations, searching data sources, gathering and analyzing the data, and preparing the required letters. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0131),

Office of Management and Budget, Washington, D.C. 20503.

We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Perkins at (301) 492-1031.

Sincerely, Ja s G. Partlow, Associate Director r Projects Office of Nuclear Reactor Regulation Enclosures:

1. Proposed Operator Licensing Examination Schedule Format

2. Proposed Requalification Examination Schedule Format

3. List of Recently Issued NRC Generic Letters

-2- July 6, 1989 Generic Letter 89-12 and Budget Clearance Number this request is covered by Office of Managementestimated average burden is two The

3150-0131, which expires March 31, 1992. assessment of the new recommendations, person-hours per owner response, including the data, and preparing the searching data sources, gathering and analyzing this burden estimate or any other required letters. Send comments regarding including suggestions for reducing aspect of this collection of information,Management Branch, Division of this burden, to the Records and Reports Resources Management, Information Support Services, Office of Information Reduction Project (3150-0131),

Washington, D.C. 20555; and to the Paperwork D.C. 20503.

Office of Management and Budget, Washington, and invite you to address any We appreciate your assistance in this matter Mr. Perkins at (301) 492-1031.

questions concerning this generic letter to Sincerely, ORIGINAL SIGNED BY JAMES G. PARTLOW

James 6. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. Proposed Operator Licensing Examination Schedule Format

2. Proposed Requalification Examination Schedule Format

3. List of Recently Issued NRC Generic Letters DISTRIBUTION:

Central Files SCooley TMurley NRC PDR KPerkins JSniezek OLB RF JZwolinski CBerlinger PD RF JWRoe FMiraglia FGuenther JPartlow HSmith

  • SEE PREVIOUS PAGE FOR CONCURRENCE

on 6/2/89.

Reviewed by B. Calure, Technical Editor, GUENTHER - 20 Ad

DDIR:DLPQ :DIR:DLPQ :AWDT

OFC :OLB:DLPQ DOLB:DLPQ :OLB:DLPQ:BC - -

'----------  %,Is ------

________________

______----- ________--------------:-- :FMir

KPerkins* :JZ v hnki :J3f NAME :FGuenther:rh* :SCooley* ____- ___- __ ___ -- - __-- __- ----------- -------------

______________- _____-

______* _______ ______

/7A'89  : 6/ 7'/89  : (063/89 DATE :5/25/89 :5/25/89 :5/25/89
:  :

UFC

e -

NAME :CBerlinger :JPart ow DATE  : klj~/T89 (e / /89 *

Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT

Facility NRC Region FY 199U FY 1991 FY 1992 FY 1993

(10/1/89-9/30/90) (10/1/90-9/30/91) J10/1/91-9/30/92) (1u/1/92-9/30/93)

1. Assigned Date (GL 89-03)

ERO

fSRO Instant ISRU Upgrade ISRO Limited

2. Assigned Date (GL 89-03)

IRO

  1. SRO Instant_
  1. SRO Upgrade
  1. SRO Limited_

Please indicate Initial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**). tfor example, if Unit

1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")

Enclosure 2 FORMAT

PROPOSED REQUALIFICATION EXAMINATION SCHEDULE

NRC Region Facility Date Planned Simulation Facility Certification/Approval FY 1993 FY 1992 FY 1993 FY 1990 FY 1991 (10/1/92-9/30/93)

(10/1189-9/30/90) (10/1/90-9130/91) (10/1/91-9/30/92)

Date Date Date

1. Date Date Date Date

2. Date Date Date., Date

3. Date Date Date Date

4. Date Date Date Date-

5. Date

ENCLOSURE 3 LIST OF RECENTLY ISSUED GENERIC LETTERS

Generic Date of Letter No. Subject Issuance Issued To

89-12 GENERIC LETTER 89-12: 7/6/89 LICENSE TO ALL

OPERATOR LICENSING POWER REACTORS

EXAMINATIONS BWRS, PWRS, AND

VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-11 GENERIC LETTER 89-11: 6/30/89 ALL BWR PLANTS &

RESOLUTION OF GENERIC ISSUE ALL LISTINGS

101 WBOILING WATER REACTOR APPLICABLE TO

WATER LEVEL REDUNDANCYN GENERIC LETTERS &

VENDORS, ETC.

89-10 GENERIC LETTER 89-10: 6/28/89 LICENSEES TO ALL

SAFETY-RELATED MOTOR-OPERATED POWER REACTORS,

VALVE TESTING AND SURVEILLANCE BWRS, PWRS, AND

VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-09 ASME SECTION III COMPONENT 5/8/89 ALL HOLDERS OF LIGHT

REPLACEMENTS WATER REACTOR

OPERATING LICENSES

89-08 ISSUANCE OF GENERIC LETTER 5/2/89 LICENSEES TO ALL

89-08: EROSION/CORROSION - POWER REACTORS,

INDUCED PIPE WALL THINNING - BWRS, PWRS, AND

10 CFR §50.54(f) VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-07 GENERIC LETTER 89-07, POWER 4/28/89 LICENSEES TO ALL

REACTOR SAFEGUARDS CONTINGENCY BWRS, PWRS, AND

PLANNING FOR SURFACE VEHICLE VENDORS IN ADDITION

BOMBS TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-06 TASK ACTION PLAN ITEM I.D.2 - 4/12/89 LICENSEES OF ALL

SAFETY PARAMETER DISPLAY POWER REACTORS,

SYSTEM - 10 CFR §50.54(f) BWRS, PWRS, HTGR,

AND NSSS VENDORS

IN ADDITION TO

GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

Template:GL-Nav