{{#Wiki_filter:* to REG(, UNITED STATES% XNUCLEAR REGULATORY | {{#Wiki_filter:* to REG(, | ||
COMMISSION | UNITED STATES | ||
e :WASHINGTON, D. C. 20555 July 6, 1989 TO: ALL POWER REACTOR LICENSEES | % XNUCLEAR REGULATORY COMMISSION | ||
AND APPLICANTS | e :WASHINGTON, D. C. 20555 July 6, 1989 TO: ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN | ||
FOR AN OPERATING | OPERATING LICENSE | ||
SUBJECT: OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 89- 1i Generic Letter (GL) 89-03, dated March 24, 1989, promulgated the United States Nuclear Regulatory Commission's (NRC's) national examination schedule. It assigned each facility two examination dates during the fiscal year based, to the extent possible, upon the examination estimates reported in response to GL | |||
EXAMINATIONS (GENERIC LETTER 89- 1i Generic Letter (GL) 89-03, dated March 24, 1989, promulgated the United States Nuclear Regulatory Commission's (NRC's) national examination schedule. | 88-13, dated August 8, 1988. It encouraged facilities to target the assigned examination dates in fiscal year 1990, which begins on October 1, 1989, but acknowledged that some deviation from the promulgated schedule would be accommodated to facilitate incremental training schedule revisions. Beginning in fiscal year 1991 (October 1, 1990), replacement examinations will not be rescheduled but deferred until the next regularly scheduled site visit. | ||
To plan its resources for fiscal years 1990 through 1993, the Office of Nuclear Reactor Regulation (NRR) requires your input to update the number of candidates you provided in response to GL 88-13. On the proposed format provided as Enclosure 1, please provide your best estimate of the anticipated number of candidates to be examined during each site visit assigned to you in Generic Letter 89-03. Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2. Your schedules, to be voluntarily submitted on the enclosed suggested formats, should be returned to Mr. Kenneth E. | |||
Perkins, Jr., Chief, Operator Licensing Branch, OWFN-IOD-18, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a courtesy copy to the appropriate Regional Administrator, by September 1, 1989. | |||
1, 1989 | |||
Bear in mind that 10 CFR 55.45 (b)(2)(iv) prohibits the simulation facility portion if the operating test from being administered on other than a certified or an approved simulation facility after May 26, 1991. In anticipation of that deadline, NRR requires your best estimate of the dates on which you expect to certify and/or apply for NRC approval of your simulation facility(ies). A space has been provided for this purpose on the Proposed Operator Licensing Schedule Format, Enclosure 1. | |||
The NRC regional offices, through direct liaison with your training managers, will confirm your examination requests. As stated in GL 89-03, the regional offices will continue to schedule NRC requalification examinations on a case-by-case basis until NRR reconciles the differences between the requalification and replacement examination methodologies in order to allow the concurrent administration of both examinations. | |||
1. Proposed Operator Licensing Examination Schedule Format 2. Proposed Requalification Examination Schedule Format 3. List of Recently Issued NRC Generic Letters | 89OO | ||
1. Proposed Operator Licensing Examination Schedule Format 2. Proposed Requalification Examination Schedule Format 3. List of Recently Issued NRC Generic Letters DISTRIBUTION: | |||
Central Files SCooley TMurley NRC PDR KPerkins JSniezek OLB RF JZwolinski CBerlinger PD RF JWRoe FMiraglia FGuenther JPartlow HSmith*SEE PREVIOUS PAGE FOR CONCURRENCE | - 2 - July 6, 1989 Generic Letter 89-12 This request is covered by Office of Management and Budget Clearance Number | ||
3150-0131, which expires March 31, 1992. The estimated average burden is two person-hours per owner response, including assessment of the new recommendations, searching data sources, gathering and analyzing the data, and preparing the required letters. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0131), | |||
Office of Management and Budget, Washington, D.C. 20503. | |||
:OLB:DLPQ | |||
We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Perkins at (301) 492-1031. | |||
: | |||
: | Sincerely, Ja s G. Partlow, Associate Director r Projects Office of Nuclear Reactor Regulation Enclosures: | ||
1. Proposed Operator Licensing Examination Schedule Format | |||
2. Proposed Requalification Examination Schedule Format | |||
3. List of Recently Issued NRC Generic Letters | |||
: | -2- July 6, 1989 Generic Letter 89-12 and Budget Clearance Number this request is covered by Office of Managementestimated average burden is two The | ||
:KPerkins* | 3150-0131, which expires March 31, 1992. assessment of the new recommendations, person-hours per owner response, including the data, and preparing the searching data sources, gathering and analyzing this burden estimate or any other required letters. Send comments regarding including suggestions for reducing aspect of this collection of information,Management Branch, Division of this burden, to the Records and Reports Resources Management, Information Support Services, Office of Information Reduction Project (3150-0131), | ||
:JZ v hnki : J3f : | Washington, D.C. 20555; and to the Paperwork D.C. 20503. | ||
------------- | Office of Management and Budget, Washington, and invite you to address any We appreciate your assistance in this matter Mr. Perkins at (301) 492-1031. | ||
:JPart ow DATE : klj~/T89 (e / /89 * | questions concerning this generic letter to Sincerely, ORIGINAL SIGNED BY JAMES G. PARTLOW | ||
Enclosure | James 6. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures: | ||
1 PROPOSED OPERATOR LICENSING | 1. Proposed Operator Licensing Examination Schedule Format | ||
EXAMINATION | 2. Proposed Requalification Examination Schedule Format | ||
SCHEDULE FORMAT Facility NRC Region FY 199U FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90) | 3. List of Recently Issued NRC Generic Letters DISTRIBUTION: | ||
(10/1/90-9/30/91) | Central Files SCooley TMurley NRC PDR KPerkins JSniezek OLB RF JZwolinski CBerlinger PD RF JWRoe FMiraglia FGuenther JPartlow HSmith | ||
J10/1/91-9/30/92) | *SEE PREVIOUS PAGE FOR CONCURRENCE | ||
(1u/1/92-9/30/93) | on 6/2/89. | ||
1. Assigned Date (GL 89-03)ERO fSRO Instant ISRU Upgrade ISRO Limited 2. Assigned Date (GL 89-03)IRO#SRO Instant_#SRO Upgrade#SRO | |||
(**). tfor example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.") | Reviewed by B. Calure, Technical Editor, GUENTHER - 20 Ad | ||
Enclosure | :DDIR:DLPQ :DIR:DLPQ :AWDT | ||
OFC :OLB:DLPQ DOLB:DLPQ :OLB:DLPQ:BC - - | |||
EXAMINATION | '---------- %,Is ------ | ||
________________ | |||
(10/1/90-9130/91) | ______----- ________--------------:-- :FMir | ||
(10/1/91-9/30/92) | :KPerkins* :JZ v hnki :J3f NAME :FGuenther:rh* :SCooley* ____- ___- __ ___ -- - __-- __- ----------- ------------- | ||
______________- _____- | |||
Date | ______* _______ ______ | ||
3 LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No. | : /7A'89 : 6/ 7'/89 : (063/89 DATE :5/25/89 :5/25/89 :5/25/89 | ||
GENERIC LETTER 89-11: RESOLUTION | : : : | ||
OF GENERIC ISSUE 101 WBOILING WATER REACTOR WATER LEVEL REDUNDANCYN | UFC | ||
:e - | |||
MOTOR-OPERATED | NAME :CBerlinger :JPart ow DATE : klj~/T89 (e / /89 * | ||
VALVE TESTING AND SURVEILLANCE | |||
89-09 ASME SECTION III COMPONENT REPLACEMENTS | Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT | ||
ISSUANCE OF GENERIC LETTER 89-08: EROSION/CORROSION | Facility NRC Region FY 199U FY 1991 FY 1992 FY 1993 | ||
(10/1/89-9/30/90) (10/1/90-9/30/91) J10/1/91-9/30/92) (1u/1/92-9/30/93) | |||
1. Assigned Date (GL 89-03) | |||
ERO | |||
fSRO Instant ISRU Upgrade ISRO Limited | |||
2. Assigned Date (GL 89-03) | |||
IRO | |||
#SRO Instant_ | |||
#SRO Upgrade | |||
#SRO Limited_ | |||
Please indicate Initial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**). tfor example, if Unit | |||
1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.") | |||
Enclosure 2 FORMAT | |||
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE | |||
NRC Region Facility Date Planned Simulation Facility Certification/Approval FY 1993 FY 1992 FY 1993 FY 1990 FY 1991 (10/1/92-9/30/93) | |||
(10/1189-9/30/90) (10/1/90-9130/91) (10/1/91-9/30/92) | |||
Date Date Date | |||
1. Date Date Date Date | |||
2. Date Date Date., Date | |||
3. Date Date Date Date | |||
4. Date Date Date Date- | |||
5. Date | |||
ENCLOSURE 3 LIST OF RECENTLY ISSUED GENERIC LETTERS | |||
Generic Date of Letter No. Subject Issuance Issued To | |||
89-12 GENERIC LETTER 89-12: 7/6/89 LICENSE TO ALL | |||
OPERATOR LICENSING POWER REACTORS | |||
EXAMINATIONS BWRS, PWRS, AND | |||
VENDORS IN ADDITION | |||
TO GENERAL CODES | |||
APPLICABLE TO | |||
GENERIC LETTERS | |||
89-11 GENERIC LETTER 89-11: 6/30/89 ALL BWR PLANTS & | |||
RESOLUTION OF GENERIC ISSUE ALL LISTINGS | |||
101 WBOILING WATER REACTOR APPLICABLE TO | |||
WATER LEVEL REDUNDANCYN GENERIC LETTERS & | |||
VENDORS, ETC. | |||
89-10 GENERIC LETTER 89-10: 6/28/89 LICENSEES TO ALL | |||
SAFETY-RELATED MOTOR-OPERATED POWER REACTORS, | |||
VALVE TESTING AND SURVEILLANCE BWRS, PWRS, AND | |||
VENDORS IN ADDITION | |||
TO GENERAL CODES | |||
APPLICABLE TO | |||
GENERIC LETTERS | |||
89-09 ASME SECTION III COMPONENT 5/8/89 ALL HOLDERS OF LIGHT | |||
REPLACEMENTS WATER REACTOR | |||
OPERATING LICENSES | |||
89-08 ISSUANCE OF GENERIC LETTER 5/2/89 LICENSEES TO ALL | |||
89-08: EROSION/CORROSION - POWER REACTORS, | |||
INDUCED PIPE WALL THINNING - BWRS, PWRS, AND | |||
10 CFR §50.54(f) VENDORS IN ADDITION | |||
TO GENERAL CODES | |||
APPLICABLE TO | |||
GENERIC LETTERS | |||
89-07 GENERIC LETTER 89-07, POWER 4/28/89 LICENSEES TO ALL | |||
REACTOR SAFEGUARDS CONTINGENCY BWRS, PWRS, AND | |||
PLANNING FOR SURFACE VEHICLE VENDORS IN ADDITION | |||
BOMBS TO GENERAL CODES | |||
APPLICABLE TO | |||
GENERIC LETTERS | |||
89-06 TASK ACTION PLAN ITEM I.D.2 - 4/12/89 LICENSEES OF ALL | |||
SAFETY PARAMETER DISPLAY POWER REACTORS, | |||
SYSTEM - 10 CFR §50.54(f) BWRS, PWRS, HTGR, | |||
AND NSSS VENDORS | |||
IN ADDITION TO | |||
GENERAL CODES | |||
APPLICABLE TO | |||
GENERIC LETTERS}} | |||
{{GL-Nav}} | {{GL-Nav}} | ||
Latest revision as of 02:18, 24 November 2019
- to REG(,
UNITED STATES
% XNUCLEAR REGULATORY COMMISSION
e :WASHINGTON, D. C. 20555 July 6, 1989 TO: ALL POWER REACTOR LICENSEES AND APPLICANTS FOR AN
OPERATING LICENSE
SUBJECT: OPERATOR LICENSING EXAMINATIONS (GENERIC LETTER 89- 1i Generic Letter (GL) 89-03, dated March 24, 1989, promulgated the United States Nuclear Regulatory Commission's (NRC's) national examination schedule. It assigned each facility two examination dates during the fiscal year based, to the extent possible, upon the examination estimates reported in response to GL 88-13, dated August 8, 1988. It encouraged facilities to target the assigned examination dates in fiscal year 1990, which begins on October 1, 1989, but acknowledged that some deviation from the promulgated schedule would be accommodated to facilitate incremental training schedule revisions. Beginning in fiscal year 1991 (October 1, 1990), replacement examinations will not be rescheduled but deferred until the next regularly scheduled site visit.
To plan its resources for fiscal years 1990 through 1993, the Office of Nuclear Reactor Regulation (NRR) requires your input to update the number of candidates you provided in response to GL 88-13. On the proposed format provided as Enclosure 1, please provide your best estimate of the anticipated number of candidates to be examined during each site visit assigned to you in Generic Letter 89-03. Also, please provide the dates for your scheduled requalification examinations during the same fiscal years in the proposed format provided as Enclosure 2. Your schedules, to be voluntarily submitted on the enclosed suggested formats, should be returned to Mr. Kenneth E.
Perkins, Jr., Chief, Operator Licensing Branch, OWFN-IOD-18, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a courtesy copy to the appropriate Regional Administrator, by September 1, 1989.
Bear in mind that 10 CFR 55.45 (b)(2)(iv) prohibits the simulation facility portion if the operating test from being administered on other than a certified or an approved simulation facility after May 26, 1991. In anticipation of that deadline, NRR requires your best estimate of the dates on which you expect to certify and/or apply for NRC approval of your simulation facility(ies). A space has been provided for this purpose on the Proposed Operator Licensing Schedule Format, Enclosure 1.
The NRC regional offices, through direct liaison with your training managers, will confirm your examination requests. As stated in GL 89-03, the regional offices will continue to schedule NRC requalification examinations on a case-by-case basis until NRR reconciles the differences between the requalification and replacement examination methodologies in order to allow the concurrent administration of both examinations.
89OO
- 2 - July 6, 1989 Generic Letter 89-12 This request is covered by Office of Management and Budget Clearance Number
3150-0131, which expires March 31, 1992. The estimated average burden is two person-hours per owner response, including assessment of the new recommendations, searching data sources, gathering and analyzing the data, and preparing the required letters. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0131),
Office of Management and Budget, Washington, D.C. 20503.
We appreciate your assistance in this matter and invite you to address any questions concerning this generic letter to Mr. Perkins at (301) 492-1031.
Sincerely, Ja s G. Partlow, Associate Director r Projects Office of Nuclear Reactor Regulation Enclosures:
1. Proposed Operator Licensing Examination Schedule Format
2. Proposed Requalification Examination Schedule Format
3. List of Recently Issued NRC Generic Letters
-2- July 6, 1989 Generic Letter 89-12 and Budget Clearance Number this request is covered by Office of Managementestimated average burden is two The
3150-0131, which expires March 31, 1992. assessment of the new recommendations, person-hours per owner response, including the data, and preparing the searching data sources, gathering and analyzing this burden estimate or any other required letters. Send comments regarding including suggestions for reducing aspect of this collection of information,Management Branch, Division of this burden, to the Records and Reports Resources Management, Information Support Services, Office of Information Reduction Project (3150-0131),
Washington, D.C. 20555; and to the Paperwork D.C. 20503.
Office of Management and Budget, Washington, and invite you to address any We appreciate your assistance in this matter Mr. Perkins at (301) 492-1031.
questions concerning this generic letter to Sincerely, ORIGINAL SIGNED BY JAMES G. PARTLOW
James 6. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation Enclosures:
1. Proposed Operator Licensing Examination Schedule Format
2. Proposed Requalification Examination Schedule Format
3. List of Recently Issued NRC Generic Letters DISTRIBUTION:
Central Files SCooley TMurley NRC PDR KPerkins JSniezek OLB RF JZwolinski CBerlinger PD RF JWRoe FMiraglia FGuenther JPartlow HSmith
- SEE PREVIOUS PAGE FOR CONCURRENCE
on 6/2/89.
Reviewed by B. Calure, Technical Editor, GUENTHER - 20 Ad
- DDIR:DLPQ :DIR:DLPQ :AWDT
OFC :OLB:DLPQ DOLB:DLPQ :OLB:DLPQ:BC - -
'---------- %,Is ------
________________
______----- ________--------------:-- :FMir
- KPerkins* :JZ v hnki :J3f NAME :FGuenther:rh* :SCooley* ____- ___- __ ___ -- - __-- __- ----------- -------------
______________- _____-
______* _______ ______
- /7A'89 : 6/ 7'/89 : (063/89 DATE :5/25/89 :5/25/89 :5/25/89
- : :
UFC
- e -
NAME :CBerlinger :JPart ow DATE : klj~/T89 (e / /89 *
Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT
Facility NRC Region FY 199U FY 1991 FY 1992 FY 1993
(10/1/89-9/30/90) (10/1/90-9/30/91) J10/1/91-9/30/92) (1u/1/92-9/30/93)
1. Assigned Date (GL 89-03)
fSRO Instant ISRU Upgrade ISRO Limited
2. Assigned Date (GL 89-03)
IRO
- SRO Instant_
- SRO Upgrade
- SRO Limited_
Please indicate Initial cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**). tfor example, if Unit
1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")
Enclosure 2 FORMAT
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE
NRC Region Facility Date Planned Simulation Facility Certification/Approval FY 1993 FY 1992 FY 1993 FY 1990 FY 1991 (10/1/92-9/30/93)
(10/1189-9/30/90) (10/1/90-9130/91) (10/1/91-9/30/92)
Date Date Date
1. Date Date Date Date
2. Date Date Date., Date
3. Date Date Date Date
4. Date Date Date Date-
5. Date
ENCLOSURE 3 LIST OF RECENTLY ISSUED GENERIC LETTERS
Generic Date of Letter No. Subject Issuance Issued To
89-12 GENERIC LETTER 89-12: 7/6/89 LICENSE TO ALL
OPERATOR LICENSING POWER REACTORS
EXAMINATIONS BWRS, PWRS, AND
VENDORS IN ADDITION
TO GENERAL CODES
APPLICABLE TO
GENERIC LETTERS
89-11 GENERIC LETTER 89-11: 6/30/89 ALL BWR PLANTS &
RESOLUTION OF GENERIC ISSUE ALL LISTINGS
101 WBOILING WATER REACTOR APPLICABLE TO
WATER LEVEL REDUNDANCYN GENERIC LETTERS &
VENDORS, ETC.
89-10 GENERIC LETTER 89-10: 6/28/89 LICENSEES TO ALL
SAFETY-RELATED MOTOR-OPERATED POWER REACTORS,
VALVE TESTING AND SURVEILLANCE BWRS, PWRS, AND
VENDORS IN ADDITION
TO GENERAL CODES
APPLICABLE TO
GENERIC LETTERS
89-09 ASME SECTION III COMPONENT 5/8/89 ALL HOLDERS OF LIGHT
REPLACEMENTS WATER REACTOR
OPERATING LICENSES
89-08 ISSUANCE OF GENERIC LETTER 5/2/89 LICENSEES TO ALL
89-08: EROSION/CORROSION - POWER REACTORS,
INDUCED PIPE WALL THINNING - BWRS, PWRS, AND
10 CFR §50.54(f) VENDORS IN ADDITION
TO GENERAL CODES
APPLICABLE TO
GENERIC LETTERS
89-07 GENERIC LETTER 89-07, POWER 4/28/89 LICENSEES TO ALL
REACTOR SAFEGUARDS CONTINGENCY BWRS, PWRS, AND
PLANNING FOR SURFACE VEHICLE VENDORS IN ADDITION
BOMBS TO GENERAL CODES
APPLICABLE TO
GENERIC LETTERS
89-06 TASK ACTION PLAN ITEM I.D.2 - 4/12/89 LICENSEES OF ALL
SAFETY PARAMETER DISPLAY POWER REACTORS,
SYSTEM - 10 CFR §50.54(f) BWRS, PWRS, HTGR,
AND NSSS VENDORS
IN ADDITION TO
GENERAL CODES
APPLICABLE TO
GENERIC LETTERS