{{#Wiki_filter:November 7, | {{#Wiki_filter:November 7, 2006 Mr. James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 | ||
==SUBJECT:== | ==SUBJECT:== | ||
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -NRC GENERIC LETTER 2006-01: | BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) - | ||
NRC GENERIC LETTER 2006-01: STEAM GENERATOR TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS (TAC NOS. MD0064 AND MD0065) | |||
==Dear Mr. Lash:== | ==Dear Mr. Lash:== | ||
On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter(GL) 2006-01, | On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2006-01, Steam Generator [SG] Tube Integrity and Associated Technical Specifications | ||
[TSs], | [TSs], (Agencywide Document Access and Management System (ADAMS) Accession No. | ||
ML060200385). This GL requested that addressees either submit a description of their program for ensuring SG tube integrity for the interval between inspections or adopt alternative TS requirements for ensuring SG tube integrity. By letter dated February 13, 2006, FirstEnergy Nuclear Operating Company, the licensee | ML060200385). This GL requested that addressees either submit a description of their program for ensuring SG tube integrity for the interval between inspections or adopt alternative TS requirements for ensuring SG tube integrity. | ||
This response stated that by application to the NRC dated November 7, 2005, the licensee requested changes to the TSs for BVPS-1 and 2 to adopt the alternative TS requirements for ensuring SG tube integrity (ADAMS Accession No. ML053140195). The new TSs were modeled after Technical Specification Task Force (TSTF) Traveler, TSTF-449, | By letter dated February 13, 2006, FirstEnergy Nuclear Operating Company, the licensee for BVPS-1 and 2, submitted a response to GL 2006-01 (ADAMS Accession No. ML060480408). | ||
This response stated that by application to the NRC dated November 7, 2005, the licensee requested changes to the TSs for BVPS-1 and 2 to adopt the alternative TS requirements for ensuring SG tube integrity (ADAMS Accession No. ML053140195). The new TSs were modeled after Technical Specification Task Force (TSTF) Traveler, TSTF-449, Steam Generator Tube Integrity, (ADAMS Accession No. ML051090200). The original application was supplemented by letters dated April 25, June 1, and August 3, 2006 (ADAMS Accession Nos. ML061210055, ML061580610, and ML062210423). On September 7, 2006, the NRC staff issued Amendment Nos. 276 and 158 to the BVPS-1 and 2 Facility Operating Licenses which approved new SG TSs (ADAMS Accession No. ML062260011). | |||
475 Allendale Road King of Prussia, PA | J. Lash The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC Nos. MD0064 and MD0065. If you have any questions regarding this letter, please contact me at 301-415-1402. | ||
Sincerely, | |||
/RA/ | |||
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page | |||
J. Lash The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC Nos. MD0064 and MD0065. If you have any questions regarding this letter, please contact me at 301-415-1402. | |||
Sincerely, | |||
/RA/ | |||
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page DISTRIBUTION: | |||
PUBLIC LPL1-1 R/F RidsNrrDorlLpl1-1 RidsNrrPMTColburn RidsNrrLASLittle RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDirsltsb RidsRgn1MailCenter RidsNrrDorlDpr RidsNrrKKarwoski RidsNrrLMiller ADAMS ACCESSION NO: ML063040282 OFFICE LPL1-1/PM LPL1-1/LA NRR/CSGB/BC LPL1-1/BC NAME TColburn SLittle AHiser RLaufer DATE 11/02/06 11/02/06 11/02/06 11/07/06 OFFICIAL RECORD COPY | |||
Beaver Valley Power Station, Unit Nos. 1 and 2 cc: | |||
Gary R. Leidich James H. Lash President and Chief Nuclear Officer Site Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SEB1 Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Joseph J. Hagan Senior Vice President of Operations Lew W. Myers and Chief Operating Officer Executive Vice President, Special Projects FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SGRP Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Danny L. Pace Senior Vice President, Fleet Engineering Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-A Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Jeannie M. Rinckel Vice President, Fleet Oversight Commissioner James R. Lewis FirstEnergy Nuclear Operating Company West Virginia Division of Labor Mail Stop A-GO-14 749-B, Building No. 6 76 South Main Street Capitol Complex Akron, OH 44308 Charleston, WV 25305 David W. Jenkins, Attorney Director, Utilities Department FirstEnergy Corporation Public Utilities Commission Mail Stop A-GO-18 180 East Broad Street 76 South Main Street Columbus, OH 43266-0573 Akron, OH 44308 Director, Pennsylvania Emergency Manager, Fleet Licensing Management Agency FirstEnergy Nuclear Operating Company 2605 Interstate Dr. | |||
Mail Stop A-GHE-107 Harrisburg, PA 17110-9364 395 Ghent Road Akron, OH 44333 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 | |||
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc: | |||
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077}} | |||
Revision as of 12:35, 23 November 2019
| ML063040282 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/07/2006 |
| From: | Colburn T NRC/NRR/ADRO/DORL/LPLI-1 |
| To: | Lash J FirstEnergy Nuclear Operating Co |
| Colburn T, NRR/DORL/LPLI-1, 415-1402 | |
| References | |
| GL-06-001, TAC MD0064, TAC MD0065 | |
| Download: ML063040282 (5) | |
Text
November 7, 2006 Mr. James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -
NRC GENERIC LETTER 2006-01: STEAM GENERATOR TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS (TAC NOS. MD0064 AND MD0065)
Dear Mr. Lash:
On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2006-01, Steam Generator [SG] Tube Integrity and Associated Technical Specifications
[TSs], (Agencywide Document Access and Management System (ADAMS) Accession No.
ML060200385). This GL requested that addressees either submit a description of their program for ensuring SG tube integrity for the interval between inspections or adopt alternative TS requirements for ensuring SG tube integrity.
By letter dated February 13, 2006, FirstEnergy Nuclear Operating Company, the licensee for BVPS-1 and 2, submitted a response to GL 2006-01 (ADAMS Accession No. ML060480408).
This response stated that by application to the NRC dated November 7, 2005, the licensee requested changes to the TSs for BVPS-1 and 2 to adopt the alternative TS requirements for ensuring SG tube integrity (ADAMS Accession No. ML053140195). The new TSs were modeled after Technical Specification Task Force (TSTF) Traveler, TSTF-449, Steam Generator Tube Integrity, (ADAMS Accession No. ML051090200). The original application was supplemented by letters dated April 25, June 1, and August 3, 2006 (ADAMS Accession Nos. ML061210055, ML061580610, and ML062210423). On September 7, 2006, the NRC staff issued Amendment Nos. 276 and 158 to the BVPS-1 and 2 Facility Operating Licenses which approved new SG TSs (ADAMS Accession No. ML062260011).
J. Lash The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC Nos. MD0064 and MD0065. If you have any questions regarding this letter, please contact me at 301-415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page
J. Lash The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC Nos. MD0064 and MD0065. If you have any questions regarding this letter, please contact me at 301-415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page DISTRIBUTION:
PUBLIC LPL1-1 R/F RidsNrrDorlLpl1-1 RidsNrrPMTColburn RidsNrrLASLittle RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDirsltsb RidsRgn1MailCenter RidsNrrDorlDpr RidsNrrKKarwoski RidsNrrLMiller ADAMS ACCESSION NO: ML063040282 OFFICE LPL1-1/PM LPL1-1/LA NRR/CSGB/BC LPL1-1/BC NAME TColburn SLittle AHiser RLaufer DATE 11/02/06 11/02/06 11/02/06 11/07/06 OFFICIAL RECORD COPY
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Gary R. Leidich James H. Lash President and Chief Nuclear Officer Site Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SEB1 Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Joseph J. Hagan Senior Vice President of Operations Lew W. Myers and Chief Operating Officer Executive Vice President, Special Projects FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SGRP Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Danny L. Pace Senior Vice President, Fleet Engineering Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-A Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Jeannie M. Rinckel Vice President, Fleet Oversight Commissioner James R. Lewis FirstEnergy Nuclear Operating Company West Virginia Division of Labor Mail Stop A-GO-14 749-B, Building No. 6 76 South Main Street Capitol Complex Akron, OH 44308 Charleston, WV 25305 David W. Jenkins, Attorney Director, Utilities Department FirstEnergy Corporation Public Utilities Commission Mail Stop A-GO-18 180 East Broad Street 76 South Main Street Columbus, OH 43266-0573 Akron, OH 44308 Director, Pennsylvania Emergency Manager, Fleet Licensing Management Agency FirstEnergy Nuclear Operating Company 2605 Interstate Dr.
Mail Stop A-GHE-107 Harrisburg, PA 17110-9364 395 Ghent Road Akron, OH 44333 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077