ML073110163: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:December 4, 2007  
{{#Wiki_filter:December 4, 2007 Mr. M. R. Blevins Executive Vice President
 
& Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043
Mr. M. R. Blevins Executive Vice President  
  & Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043  


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.5.8, INSERVICE TESTING PROGRAM (TAC NOS. MD4072 AND MD4073)  
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -
ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.5.8, INSERVICE TESTING PROGRAM (TAC NOS. MD4072 AND MD4073)


==Dear Mr. Blevins:==
==Dear Mr. Blevins:==


The Nuclear Regulatory Commission has issued the enclosed Amendment No. 140 to Facility Operating License No. NPF-87 and Amendment No. 140 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated December 19, 2006.  
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 140 to Facility Operating License No. NPF-87 and Amendment No. 140 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively.
 
The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated December 19, 2006.
The amendments revise CPSES, Units 1 and 2, TS 5.5.8 to update references to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, and to indicate the applicability of the provisions of TS Surveillance Requirement 3.0.2.
The amendments revise CPSES, Units 1 and 2, TS 5.5.8 to update references to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, and to indicate the applicability of the provisions of TS Surveillance Requirement 3.0.2.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.       Sincerely,   /RA/       Balwant K. Singal, Senior Project Manager       Plant Licensing Branch IV       Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
 
Sincerely,
Docket Nos. 50-445 and 50-446  
                                                /RA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 140 to NPF-87
: 1. Amendment No. 140 to NPF-87
: 2. Amendment No. 140 to NPF-89
: 2. Amendment No. 140 to NPF-89
: 3. Safety Evaluation  
: 3. Safety Evaluation cc w/encls: See next page


cc w/encls:  See next page December 4, 2007 Mr. M. R. Blevins Executive Vice President   & Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043  
December 4, 2007 Mr. M. R. Blevins Executive Vice President
& Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.5.8, INSERVICE TESTING PROGRAM (TAC NOS. MD4072 AND MD4073)  
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -
ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.5.8, INSERVICE TESTING PROGRAM (TAC NOS. MD4072 AND MD4073)


==Dear Mr. Blevins:==
==Dear Mr. Blevins:==


The Nuclear Regulatory Commission has issued the enclosed Amendment No. 140 to Facility Operating License No. NPF-87 and Amendment No. 140 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated December 19, 2006.  
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 140 to Facility Operating License No. NPF-87 and Amendment No. 140 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively.
 
The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated December 19, 2006.
The amendments revise CPSES, Units 1 and 2, TS 5.5.8 to update references to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, and to indicate the applicability of the provisions of TS Surveillance Requirement 3.0.2.  
The amendments revise CPSES, Units 1 and 2, TS 5.5.8 to update references to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, and to indicate the applicability of the provisions of TS Surveillance Requirement 3.0.2.
 
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.       Sincerely, /RA/       Balwant K. Singal, Senior Project Manager       Plant Licensing Branch IV Division of Operating Reactor Licensing       Office of Nuclear Reactor Regulation  
Sincerely,
 
                                                        /RA/
Docket Nos. 50-445 and 50-446  
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 140 to NPF-87   2. Amendment No. 140 to NPF-89
: 1. Amendment No. 140 to NPF-87
: 3. Safety Evaluation  
: 2. Amendment No. 140 to NPF-89
 
: 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
cc w/encls: See next page DISTRIBUTION
PUBLIC                                 RidsNrrDorlDpr                        RidsOgcRp LPLIV Reading                           RidsNrrDorlLpl4                      RidsRgn4MailCenter RidsAcrsAcnwMailCenter                 RidsNrrPMBSingal                     GWaig, NRR RidsNrrDirsItsb                        RidsNrrLAJBurkhardt                  GHill, OIS (4)
PUBLIC LPLIV Reading RidsAcrsAcnwMailCenter RidsNrrDirsItsb RidsNrrDorlDpr RidsNrrDorlLpl4  RidsNrrPMBSingal RidsNrrLAJBurkhardt RidsOgcRp RidsRgn4MailCenter GWaig, NRR GHill, OIS (4)
ADAMS Accession Nos.: Pkg ML073110162 (Amdt/License ML073110163, TS Pgs ML073110180)
ADAMS Accession Nos.: Pkg ML073110162 (Amdt/License ML073110163, TS Pgs ML073110180) (*)SE dated 10/18/2007 (**)See previous concurrence OFFICE NRR/LPL4/PM NRR/LPL4/LA ITSB/DIRS OGC - NLO w/comments NRR/LPL4/BC NAME BSingal(**) JBurkhardt(**) TKobetz(*) APHodgdon (**) THiltz DATE 11/20/07 11/19/07 10/18/07 11/27/07 12/3/07 OFFICIAL AGENCY RECORD
(*)SE dated 10/18/2007   (**)See previous concurrence OFFICE         NRR/LPL4/PM     NRR/LPL4/LA           ITSB/DIRS       OGC - NLO w/comments     NRR/LPL4/BC NAME           BSingal(**)     JBurkhardt(**)       TKobetz(*)     APHodgdon (**)           THiltz DATE           11/20/07         11/19/07             10/18/07       11/27/07                 12/3/07 OFFICIAL AGENCY RECORD


Comanche Peak Steam Electric Station cc:
Comanche Peak Steam Electric Station cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159  
Senior Resident Inspector           Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission   Bureau of Radiation Control P.O. Box 2159                       Texas Department of Health Glen Rose, TX 76403-2159             1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission   Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400     Public Utility Commission Arlington, TX 76011                 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director         1701 North Congress Avenue Regulatory Affairs                   Austin, TX 78701-3326 Luminant Generation Company LLC P.O. Box 1002                       Ms. Susan M. Jablonski Glen Rose, TX 76043                 Office of Permitting, Remediation and Registration Timothy P. Matthews, Esq.           Texas Commission on Environmental Morgan Lewis                         Quality 1111 Pennsylvania Avenue, NW         MC-122 Washington, DC 20004                 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851                        Anthony P. Jones Glen Rose, TX 76043                  Chief Boiler Inspector Texas Department of Licensing Environmental and Natural            and Regulation Resources Policy Director          Boiler Division Office of the Governor              E.O. Thompson State Office Building P.O. Box 12428                      P.O. Box 12157 Austin, TX 78711-3189                Austin, TX 78711
 
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX  76043
 
Environmental and Natural    Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189  Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX  78756-3189
 
Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX  78701-3326
 
Ms. Susan M. Jablonski Office of Permitting, Remediation  and Registration Texas Commission on Environmental  Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony P. Jones Chief Boiler Inspector Texas Department of Licensing   and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711  


LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 1 DOCKET NO. 50-445 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 140 License No. NPF-87
LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 1 DOCKET NO. 50-445 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 140 License No. NPF-87
Line 79: Line 73:
A. The application for amendment by Luminant Generation Company LLC dated December 19, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
A. The application for amendment by Luminant Generation Company LLC dated December 19, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-87 is hereby amended to read as follows:
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-87 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan as indicated in the attachment to this license amendment.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan as indicated in the attachment to this license amendment.
: 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
: 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION  
FOR THE NUCLEAR REGULATORY COMMISSION
  /RA/ Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
                                      /RA/
Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Facility   Operating License No. NPF-87   and Technical Specifications  
Changes to the Facility Operating License No. NPF-87 and Technical Specifications Date of Issuance: December 4, 2007
 
Date of Issuance: December 4, 2007


LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 2 DOCKET NO. 50-446 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 140 License No. NPF-89
LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 2 DOCKET NO. 50-446 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 140 License No. NPF-89
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Luminant Generation Company LLC dated December 19, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
A. The application for amendment by Luminant Generation Company LLC dated December 19, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-89 is hereby amended to read as follows:
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-89 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION  
FOR THE NUCLEAR REGULATORY COMMISSION
  /RA/ Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
                                    /RA/
Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Facility   Operating License No. NPF-89   and Technical Specifications  
Changes to the Facility Operating License No. NPF-89 and Technical Specifications Date of Issuance: December 4, 2007
 
Date of Issuance: December 4, 2007 ATTACHMENT TO LICENSE AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-89 DOCKET NOS. 50-445 AND 50-446


Replace the following pages of the Facility Operating License Nos. NPF-87 and NPF-89, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
ATTACHMENT TO LICENSE AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-89 DOCKET NOS. 50-445 AND 50-446 Replace the following pages of the Facility Operating License Nos. NPF-87 and NPF-89, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License No. NPF-87 REMOVE   INSERT     3   3 Facility Operating License No. NPF-89 REMOVE   INSERT     3   3 Technical Specifications REMOVE   INSERT     5.0-12   5.0-12  
Facility Operating License No. NPF-87 REMOVE                       INSERT 3                             3 Facility Operating License No. NPF-89 REMOVE                       INSERT 3                             3 Technical Specifications REMOVE                       INSERT 5.0-12                       5.0-12


(3) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
(3)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission=s regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
=s regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)     Maximum Power Level Luminant Generation Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.
(1) Maximum Power Level Luminant Generation Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 the Environmental Protection Plan contained in           Deleted: and Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No.
Amendment No. 140
140 the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.  


Amendment No. 140 Deleted:  and  (3) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
(3)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)     Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission=s regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
=s regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)     Maximum Power Level Luminant Generation Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.
(1) Maximum Power Level Luminant Generation Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No.
(3)     Antitrust Conditions DELETED Amendment No. 140
140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions DELETED           Amendment No. 140  


SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-89 LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-89 LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446


==1.0 INTRODUCTION==
==1.0     INTRODUCTION==


By application dated December 19, 2006 (Agencywide Documents Access and Management System Accession No. ML070580123), TXU Generation Company LP (now Luminant Generation Company LLC, the licensee), proposed a license amendment to change the Technical Specifications (TSs) for the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. The license amendment request (LAR) proposes to revise the CPSES, Units 1 and 2 TS 5.5.8, "Inservice Testing Program," to incorporate administrative changes. The changes reflect the current configuration of the plant.  
By application dated December 19, 2006 (Agencywide Documents Access and Management System Accession No. ML070580123), TXU Generation Company LP (now Luminant Generation Company LLC, the licensee), proposed a license amendment to change the Technical Specifications (TSs) for the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2.
The license amendment request (LAR) proposes to revise the CPSES, Units 1 and 2 TS 5.5.8, Inservice Testing Program, to incorporate administrative changes. The changes reflect the current configuration of the plant.


==2.0 REGULATORY EVALUATION==
==2.0     REGULATORY EVALUATION==


Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. These TSs are derived from the plant safety analyses.
Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. These TSs are derived from the plant safety analyses.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the proposed changes for compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36 and agreement with the precedent as established in NUREG-1431, Revision 3.1, "Standard Technical Specifications, Westinghouse Plants," dated December 1, 2005. In general, licensees cannot justify TS changes solely on the basis of adopting the model Standard Technical Specifications (STS). To ensure this, the staff makes a determination that proposed changes maintain adequate safety. Changes that result in relaxation (less restrictive condition) of current TS requirements require detailed justification.  
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the proposed changes for compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36 and agreement with the precedent as established in NUREG-1431, Revision 3.1, Standard Technical Specifications, Westinghouse Plants, dated December 1, 2005. In general, licensees cannot justify TS changes solely on the basis of adopting the model Standard Technical Specifications (STS). To ensure this, the staff makes a determination that proposed changes maintain adequate safety. Changes that result in relaxation (less restrictive condition) of current TS requirements require detailed justification.
 
In general, there are two classes of changes to TSs: (1) changes needed to reflect contents of the design basis (TSs are derived from the design basis), and (2) voluntary changes to take
In general, there are two classes of changes to TSs: (1) changes needed to reflect contents of the design basis (TSs are derived from the design basis), and (2) voluntary changes to take   advantage of the evolution in policy and guidance as to the required content and preferred format of TSs over time. The proposed amendment concerns the second class of change; namely, administrative changes that reflect the current configuration of the plant.


advantage of the evolution in policy and guidance as to the required content and preferred format of TSs over time. The proposed amendment concerns the second class of change; namely, administrative changes that reflect the current configuration of the plant.
Licensees may revise the technical specifications to adopt improved STS format and content provided that a plant-specific review supports a finding of continued adequate safety because:
Licensees may revise the technical specifications to adopt improved STS format and content provided that a plant-specific review supports a finding of continued adequate safety because:
(1) the change is editorial, administrative, or provides clarification (i.e., no requirements are materially altered); (2) the change is more restrictive than the licensee's current requirement; or (3) the change is less restrictive than the licensee's current requirement, but nonetheless still affords adequate assurance of safety when judged against current regulatory standards. The detailed application of this general framework, and additional specialized guidance, are discussed in Section 3.0 in the context of specific proposed changes.
(1) the change is editorial, administrative, or provides clarification (i.e., no requirements are materially altered); (2) the change is more restrictive than the licensees current requirement; or (3) the change is less restrictive than the licensees current requirement, but nonetheless still affords adequate assurance of safety when judged against current regulatory standards. The detailed application of this general framework, and additional specialized guidance, are discussed in Section 3.0 in the context of specific proposed changes.
 
==3.0 TECHNICAL EVALUATION==
 
The licensee's TS revision proposes to make changes that are editorial, administrative or provide clarification. In order for these changes to be acceptable, the NRC staff must determine that the changes are compatible with current TS, do not result in any substantive change in operating requirements, and are consistent with the Commission's regulations. 
 
The licensee proposes to adopt the administrative TS changes contained in TS Task Force (TSTF)-479, Revision 0 (TSTF-479), "Changes to Reflect Revision of 10 CFR 50.55a," and TSTF-497, Revision 0 (TSTF-497), "Limit Inservice Testing Program SR [Surveillance Requirement] 3.0.2 Application to Frequencies of 2 Years or Less." 


TSTF-479 revised the Inservice Testing Program (IST) located in Chapter 5 of the STS to reflect the latest approved version of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) consistent with the requirements of 10 CFR 50.55a. TSTF-479 also revised paragraph b of STS Chapter 5 IST by adding "[t]he provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal and accelerated Frequencies specified in the Inservice Testing (IST) Program for performing inservice testing activities."  This requirement refers to testing frequencies specified in the table in paragraph a of STS Chapter 5, which only lists test frequency intervals of 2 years or less. Since the licensee's proposed TS change does not affect the maximum 2-year valve test interval, TSTF-479 does not alter the TS requirements and is consistent with the guidance provided in NUREG-1482, "Guidelines for Inservice Testing at Nuclear Power Plants."
==3.0     TECHNICAL EVALUATION==
To clarify the applicability of the provisions of TS SR 3.0.2, TSTF-497 revised the sentence in paragraph b to state:  "[t]he provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities."  This is an administrative change to clearly state that the provisions of SR 3.0.2 are applicable to IST frequency intervals of 2 years or less. The licensee's revision adopts TSTF-479 and TSTF-497 changes to Section 5.5.8 of the CPSES Units 1 and 2 TSs to reflect the latest approved version of the ASME OM Code, the applicability of the provisions of SR 3.0.2, and additional wording to clarify that the test interval extension in the inservice testing program applies only to test intervals of 2 years or less.


==4.0 STATE CONSULTATION==
The licensees TS revision proposes to make changes that are editorial, administrative or provide clarification. In order for these changes to be acceptable, the NRC staff must determine that the changes are compatible with current TS, do not result in any substantive change in operating requirements, and are consistent with the Commission's regulations.
The licensee proposes to adopt the administrative TS changes contained in TS Task Force (TSTF)-479, Revision 0 (TSTF-479), Changes to Reflect Revision of 10 CFR 50.55a, and TSTF-497, Revision 0 (TSTF-497), Limit Inservice Testing Program SR [Surveillance Requirement] 3.0.2 Application to Frequencies of 2 Years or Less.
TSTF-479 revised the Inservice Testing Program (IST) located in Chapter 5 of the STS to reflect the latest approved version of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) consistent with the requirements of 10 CFR 50.55a. TSTF-479 also revised paragraph b of STS Chapter 5 IST by adding [t]he provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal and accelerated Frequencies specified in the Inservice Testing (IST) Program for performing inservice testing activities. This requirement refers to testing frequencies specified in the table in paragraph a of STS Chapter 5, which only lists test frequency intervals of 2 years or less. Since the licensees proposed TS change does not affect the maximum 2-year valve test interval, TSTF-479 does not alter the TS requirements and is consistent with the guidance provided in NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants.
To clarify the applicability of the provisions of TS SR 3.0.2, TSTF-497 revised the sentence in paragraph b to state: [t]he provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities. This is an administrative change to clearly state that the provisions of SR 3.0.2 are applicable to IST frequency intervals of 2 years or less. The licensees revision adopts TSTF-479 and TSTF-497 changes to Section 5.5.8 of the CPSES Units 1 and 2 TSs to reflect the latest approved version of the ASME OM Code, the applicability of the provisions of SR 3.0.2, and additional wording to clarify that the test interval extension in the inservice testing program applies only to test intervals of 2 years or less.


In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendment. The State official had no comments. 
==4.0      STATE CONSULTATION==


==5.0 ENVIRONMENTAL CONSIDERATION==
In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendment. The State official had no comments.


The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published May 22, 2007 (72 FR 28724). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.  
==5.0      ENVIRONMENTAL CONSIDERATION==


==6.0 CONCLUSION==
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published May 22, 2007 (72 FR 28724). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.


The licensee's proposed changes in this LAR are acceptable since the changes to CPSES Units 1 and 2 and TS requirements do not result in any substantive change in operating requirements, and are consistent with the Commission's regulations, and conform to the requirements of 10 CFR 50.55a. On this basis, the NRC staff concludes that the proposed TS changes are acceptable.
==6.0      CONCLUSION==
The Commission has concluded, based on the considerations discussed above, that:  (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor:  Gerald Waig


Date: December 4, 2007}}
The licensees proposed changes in this LAR are acceptable since the changes to CPSES Units 1 and 2 and TS requirements do not result in any substantive change in operating requirements, and are consistent with the Commissions regulations, and conform to the requirements of 10 CFR 50.55a. On this basis, the NRC staff concludes that the proposed TS changes are acceptable.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Gerald Waig Date: December 4, 2007}}

Revision as of 00:54, 23 November 2019

Issuance of Amendment Nos. 140 and 140, Revised Technical Specification 5.5.8, Inservice Testing Program (TAC Nos. MD4072 and MD4073)
ML073110163
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/04/2007
From: Balwant Singal
NRC/NRR/ADRO/DORL/LPLIV
To: Blevins M
Luminant Generation Co
Singal, Balwant, 415-3016, NRR/DORL/LPL4
Shared Package
ML073110162 List:
References
TAC MD4072, TAC MD4073
Download: ML073110163 (13)


Text

December 4, 2007 Mr. M. R. Blevins Executive Vice President

& Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -

ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.5.8, INSERVICE TESTING PROGRAM (TAC NOS. MD4072 AND MD4073)

Dear Mr. Blevins:

The Nuclear Regulatory Commission has issued the enclosed Amendment No. 140 to Facility Operating License No. NPF-87 and Amendment No. 140 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively.

The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated December 19, 2006.

The amendments revise CPSES, Units 1 and 2, TS 5.5.8 to update references to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, and to indicate the applicability of the provisions of TS Surveillance Requirement 3.0.2.

A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.

Sincerely,

/RA/

Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446

Enclosures:

1. Amendment No. 140 to NPF-87
2. Amendment No. 140 to NPF-89
3. Safety Evaluation cc w/encls: See next page

December 4, 2007 Mr. M. R. Blevins Executive Vice President

& Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -

ISSUANCE OF AMENDMENTS RE: REVISION TO TECHNICAL SPECIFICATION 5.5.8, INSERVICE TESTING PROGRAM (TAC NOS. MD4072 AND MD4073)

Dear Mr. Blevins:

The Nuclear Regulatory Commission has issued the enclosed Amendment No. 140 to Facility Operating License No. NPF-87 and Amendment No. 140 to Facility Operating License No. NPF-89 for Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, respectively.

The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated December 19, 2006.

The amendments revise CPSES, Units 1 and 2, TS 5.5.8 to update references to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, and to indicate the applicability of the provisions of TS Surveillance Requirement 3.0.2.

A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.

Sincerely,

/RA/

Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446

Enclosures:

1. Amendment No. 140 to NPF-87
2. Amendment No. 140 to NPF-89
3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsNrrDorlDpr RidsOgcRp LPLIV Reading RidsNrrDorlLpl4 RidsRgn4MailCenter RidsAcrsAcnwMailCenter RidsNrrPMBSingal GWaig, NRR RidsNrrDirsItsb RidsNrrLAJBurkhardt GHill, OIS (4)

ADAMS Accession Nos.: Pkg ML073110162 (Amdt/License ML073110163, TS Pgs ML073110180)

(*)SE dated 10/18/2007 (**)See previous concurrence OFFICE NRR/LPL4/PM NRR/LPL4/LA ITSB/DIRS OGC - NLO w/comments NRR/LPL4/BC NAME BSingal(**) JBurkhardt(**) TKobetz(*) APHodgdon (**) THiltz DATE 11/20/07 11/19/07 10/18/07 11/27/07 12/3/07 OFFICIAL AGENCY RECORD

Comanche Peak Steam Electric Station cc:

Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400 Public Utility Commission Arlington, TX 76011 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 Luminant Generation Company LLC P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration Timothy P. Matthews, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Anthony P. Jones Glen Rose, TX 76043 Chief Boiler Inspector Texas Department of Licensing Environmental and Natural and Regulation Resources Policy Director Boiler Division Office of the Governor E.O. Thompson State Office Building P.O. Box 12428 P.O. Box 12157 Austin, TX 78711-3189 Austin, TX 78711

LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 1 DOCKET NO. 50-445 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 140 License No. NPF-87

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Luminant Generation Company LLC dated December 19, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-87 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan as indicated in the attachment to this license amendment.

3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. NPF-87 and Technical Specifications Date of Issuance: December 4, 2007

LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 2 DOCKET NO. 50-446 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 140 License No. NPF-89

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Luminant Generation Company LLC dated December 19, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-89 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. NPF-89 and Technical Specifications Date of Issuance: December 4, 2007

ATTACHMENT TO LICENSE AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-89 DOCKET NOS. 50-445 AND 50-446 Replace the following pages of the Facility Operating License Nos. NPF-87 and NPF-89, and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Operating License No. NPF-87 REMOVE INSERT 3 3 Facility Operating License No. NPF-89 REMOVE INSERT 3 3 Technical Specifications REMOVE INSERT 5.0-12 5.0-12

(3) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission=s regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level Luminant Generation Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 the Environmental Protection Plan contained in Deleted: and Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 140

(3) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Luminant Generation Company LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission=s regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level Luminant Generation Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3458 megawatts thermal in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. Luminant Generation Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions DELETED Amendment No. 140

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-87 AND AMENDMENT NO. 140 TO FACILITY OPERATING LICENSE NO. NPF-89 LUMINANT GENERATION COMPANY LLC COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446

1.0 INTRODUCTION

By application dated December 19, 2006 (Agencywide Documents Access and Management System Accession No. ML070580123), TXU Generation Company LP (now Luminant Generation Company LLC, the licensee), proposed a license amendment to change the Technical Specifications (TSs) for the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2.

The license amendment request (LAR) proposes to revise the CPSES, Units 1 and 2 TS 5.5.8, Inservice Testing Program, to incorporate administrative changes. The changes reflect the current configuration of the plant.

2.0 REGULATORY EVALUATION

Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. These TSs are derived from the plant safety analyses.

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the proposed changes for compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36 and agreement with the precedent as established in NUREG-1431, Revision 3.1, Standard Technical Specifications, Westinghouse Plants, dated December 1, 2005. In general, licensees cannot justify TS changes solely on the basis of adopting the model Standard Technical Specifications (STS). To ensure this, the staff makes a determination that proposed changes maintain adequate safety. Changes that result in relaxation (less restrictive condition) of current TS requirements require detailed justification.

In general, there are two classes of changes to TSs: (1) changes needed to reflect contents of the design basis (TSs are derived from the design basis), and (2) voluntary changes to take

advantage of the evolution in policy and guidance as to the required content and preferred format of TSs over time. The proposed amendment concerns the second class of change; namely, administrative changes that reflect the current configuration of the plant.

Licensees may revise the technical specifications to adopt improved STS format and content provided that a plant-specific review supports a finding of continued adequate safety because:

(1) the change is editorial, administrative, or provides clarification (i.e., no requirements are materially altered); (2) the change is more restrictive than the licensees current requirement; or (3) the change is less restrictive than the licensees current requirement, but nonetheless still affords adequate assurance of safety when judged against current regulatory standards. The detailed application of this general framework, and additional specialized guidance, are discussed in Section 3.0 in the context of specific proposed changes.

3.0 TECHNICAL EVALUATION

The licensees TS revision proposes to make changes that are editorial, administrative or provide clarification. In order for these changes to be acceptable, the NRC staff must determine that the changes are compatible with current TS, do not result in any substantive change in operating requirements, and are consistent with the Commission's regulations.

The licensee proposes to adopt the administrative TS changes contained in TS Task Force (TSTF)-479, Revision 0 (TSTF-479), Changes to Reflect Revision of 10 CFR 50.55a, and TSTF-497, Revision 0 (TSTF-497), Limit Inservice Testing Program SR [Surveillance Requirement] 3.0.2 Application to Frequencies of 2 Years or Less.

TSTF-479 revised the Inservice Testing Program (IST) located in Chapter 5 of the STS to reflect the latest approved version of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) consistent with the requirements of 10 CFR 50.55a. TSTF-479 also revised paragraph b of STS Chapter 5 IST by adding [t]he provisions of SR 3.0.2 are applicable to the above required Frequencies and other normal and accelerated Frequencies specified in the Inservice Testing (IST) Program for performing inservice testing activities. This requirement refers to testing frequencies specified in the table in paragraph a of STS Chapter 5, which only lists test frequency intervals of 2 years or less. Since the licensees proposed TS change does not affect the maximum 2-year valve test interval, TSTF-479 does not alter the TS requirements and is consistent with the guidance provided in NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants.

To clarify the applicability of the provisions of TS SR 3.0.2, TSTF-497 revised the sentence in paragraph b to state: [t]he provisions of SR 3.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities. This is an administrative change to clearly state that the provisions of SR 3.0.2 are applicable to IST frequency intervals of 2 years or less. The licensees revision adopts TSTF-479 and TSTF-497 changes to Section 5.5.8 of the CPSES Units 1 and 2 TSs to reflect the latest approved version of the ASME OM Code, the applicability of the provisions of SR 3.0.2, and additional wording to clarify that the test interval extension in the inservice testing program applies only to test intervals of 2 years or less.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Texas State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published May 22, 2007 (72 FR 28724). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),

no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The licensees proposed changes in this LAR are acceptable since the changes to CPSES Units 1 and 2 and TS requirements do not result in any substantive change in operating requirements, and are consistent with the Commissions regulations, and conform to the requirements of 10 CFR 50.55a. On this basis, the NRC staff concludes that the proposed TS changes are acceptable.

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: Gerald Waig Date: December 4, 2007