{{#Wiki_filter:January 30, 2008  
{{#Wiki_filter:January 30, 2008
  Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant  
Mr. Barry S. Allen
P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097  
Site Vice President
SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION  
FirstEnergy Nuclear Operating Company
(CDBI) 05000440/2008006(DRS)  
Perry Nuclear Power Plant
Dear Mr. Allen:  
P. O. Box 97, 10 Center Road, A-PY-290
On May 5, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection  
Perry, OH 44081-0097
(CDBI) at the Perry Nuclear Power Plant. A team of six inspectors will perform this 3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.
SUBJECT:       PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN
The CDBI inspection focuses on components that have high risk and low design margins. The  
                NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
components to be reviewed during this baseline inspection will be identified during an in-office preparation week prior to the first week of the on-site inspection. In addition, a number of risk significant operator actions and operating experience issues, associated with the component samples, will also be selected for review.  
                (CDBI) 05000440/2008006(DRS)
Dear Mr. Allen:
The inspection will include three weeks on-site, including the information gathering during the first on-site week. The inspection team will consist of six NRC inspectors, of which five will focus on engineering and one on operations. The current inspection schedule is as follows:  
On May 5, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection
* On-site weeks: May 5, 2008, through May 9, 2008;   May 19, 2008, through May 23, 2008; and   June 2, 2008, through June 6, 2008.  
(CDBI) at the Perry Nuclear Power Plant. A team of six inspectors will perform this
3-week inspection. This inspection will be performed in accordance with NRC Baseline
Inspection Procedure (IP) 71111.21.
The CDBI inspection focuses on components that have high risk and low design margins. The
components to be reviewed during this baseline inspection will be identified during an in-office
preparation week prior to the first week of the on-site inspection. In addition, a number of risk
significant operator actions and operating experience issues, associated with the component
samples, will also be selected for review.
The inspection will include three weeks on-site, including the information gathering during the
first on-site week. The inspection team will consist of six NRC inspectors, of which five will
focus on engineering and one on operations. The current inspection schedule is as follows:
*   On-site weeks: May 5, 2008, through May 9, 2008;
                      May 19, 2008, through May 23, 2008; and
                      June 2, 2008, through June 6, 2008.
The team will be preparing for the inspection, mainly during the week of April 28, 2008, as
discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the
inspection team during the week of May 5, 2008, to review probabilistic risk assessment data,
and assist in identifying risk significant components, which will be reviewed during the
inspection.
Experience with previous baseline design inspections of similar depth and length has shown
that these type of inspections are extremely resource intensive, both for the NRC inspectors and
the licensee staff. In order to minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for information needed for
the inspection.


The team will be preparing for the inspection, mainly during the week of April 28, 2008, as discussed in the attached enclosure.  A Region III Senior Reactor Analyst may accompany the inspection team during the week of May 5, 2008, to review probabilistic risk assessment data, and assist in identifying risk significant components, which will be reviewed during the
B. Allen                                         -2-
inspection.
It is important that all of these documents are up to date and complete in order to minimize the
Experience with previous baseline design inspections of similar depth and length has shown that these type of inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a
number of additional documents requested during the preparation and/or the on-site portions of
productive inspection for both parties, we have enclosed a request for information needed for the inspection. 
the inspection. Insofar as possible, this information should be provided electronically to the lead
B. Allen -2-  
inspector. The information request has been divided into three groups:
It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of  
*   The first group lists information necessary for our initial inspection scoping activities.
the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:  
    This information should be provided to the lead inspector no later than March 24, 2008. By
* The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than March 24, 2008. By April 11, 2008, the lead inspector will communicate the initial selected set of approximately 30 high risk components.
    April 11, 2008, the lead inspector will communicate the initial selected set of approximately
* The second group of documents requested are those items needed to support our in-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than April 23, 2008. During the in-office preparation activities, the team may identify  
    30 high risk components.
additional information needed to support the inspection.  
*   The second group of documents requested are those items needed to support our in-office
* The last group includes the additional information above as well as plant specific reference material. This information should be available to the team at Perry on May 5, 2008. It is also requested that corrective action documents and/or questions developed during the  
    preparation activities. This set of documents, including the calculations associated with the
inspection be provided to the lead inspector as the documents are generated.  
    initial selected components, should be provided to the lead inspector at the Regional Office
The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing contact for this inspection is Mr. Kenneth Russell of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the  
    no later than April 23, 2008. During the in-office preparation activities, the team may identify
lead inspector at (630) 829-9727 or via e-mail at sns2@nrc.gov.  
    additional information needed to support the inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
*   The last group includes the additional information above as well as plant specific reference
Sincerely, /RA/ Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety
    material. This information should be available to the team at Perry on May 5, 2008. It is
Docket No. 50-440  
    also requested that corrective action documents and/or questions developed during the
License No. NPF-58  
    inspection be provided to the lead inspector as the documents are generated.
Enclosure: Component Design Bases Inspection (CDBI) Document Request  
The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing
DISTRIBUTION
contact for this inspection is Mr. Kenneth Russell of your organization. If there are any
See next page
questions about the inspection or the material requested in the enclosure, please contact the
  B. Allen -2-
lead inspector at (630) 829-9727 or via e-mail at sns2@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
It is important that all of these documents are up to date and complete in order to minimize the number of
enclosure will be available electronically for public inspection in the NRC Public Document
additional documents requested during the preparation and/or the on-site portions of the inspection. 
Room or from the Publicly Available Records (PARS) component of NRC's document system
Insofar as possible, this information should be provided electronically to the lead inspector.  The
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
information request has been divided into three groups:
Public Electronic Reading Room).
* The first group lists information necessary for our initial inspection scoping activities.  This information should be provided to the lead inspector no later than March 24, 2008.  By April 11, 2008, the lead
                                              Sincerely,
inspector will communicate the initial selected set of approximately 30 high risk components. 
                                                /RA/
* The second group of documents requested are those items needed to support our in-office preparation activities.  This set of documents, including the calculations associated with the initial
                                              Ann Marie Stone, Chief
selected components, should be provided to the lead inspector at the Regional Office no later than
                                              Engineering Branch 2
April 23, 2008.  During the in-office preparation activities, the team may identify additional information
                                              Division of Reactor Safety
needed to support the inspection. 
Docket No. 50-440
* The last group includes the additional information above as well as plant specific reference material.  This information should be available to the team at Perry on May 5, 2008.  It is also requested that
License No. NPF-58
corrective action documents and/or questions developed during the inspection be provided to the lead
Enclosure:       Component Design Bases Inspection (CDBI) Document Request
inspector as the documents are generated. 
DISTRIBUTION
See next page
The lead inspector for this inspection is Dr. Stuart Sheldon.  We understand that our licensing contact for this inspection is Mr. Kenneth Russell of your organization.  If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727
or via e-mail at sns2@nrc.gov.


B. Allen                                                                      -2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure  
It is important that all of these documents are up to date and complete in order to minimize the number of
will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
additional documents requested during the preparation and/or the on-site portions of the inspection.
Insofar as possible, this information should be provided electronically to the lead inspector. The
information request has been divided into three groups:
*    The first group lists information necessary for our initial inspection scoping activities. This information
      should be provided to the lead inspector no later than March 24, 2008. By April 11, 2008, the lead
      inspector will communicate the initial selected set of approximately 30 high risk components.
*    The second group of documents requested are those items needed to support our in-office
      preparation activities. This set of documents, including the calculations associated with the initial
      selected components, should be provided to the lead inspector at the Regional Office no later than
      April 23, 2008. During the in-office preparation activities, the team may identify additional information
      needed to support the inspection.
*    The last group includes the additional information above as well as plant specific reference material.
      This information should be available to the team at Perry on May 5, 2008. It is also requested that
      corrective action documents and/or questions developed during the inspection be provided to the lead
      inspector as the documents are generated.
The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing contact for
this inspection is Mr. Kenneth Russell of your organization. If there are any questions about the
inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727
or via e-mail at sns2@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                                Sincerely,
                                                                                /RA/
                                                                                Ann Marie Stone, Chief
                                                                                Engineering Branch 2
                                                                                Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure:                Component Design Bases Inspection (CDBI) Document Request
DISTRIBUTION
See next page
G:\DRS\Work in Progress\Ltr 01 08 Perry Request for Information SNS.doc
Publicly Available                        Non-Publicly Available                  Sensitive              Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE: RIII                                                      RIII                                  RIII                            RIII
  NAME:            SSheldon: ls                                      AMStone
  DATE:            01/28/08                                          01/30/08
                                                          OFFICIAL RECORD COPY


Sincerely,  
Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January , 2008.
/RA/
SUBJECT:      PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN
Ann Marie Stone, Chief  
              NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
Engineering Branch 2
              (CDBI) 05000440/2008006(DRS)
Division of Reactor Safety 
cc w/encl:    J. Hagan, President and Chief Nuclear Officer - FENOC
Docket No. 50-440 License No. NPF-58
              J. Lash, Senior Vice President of Operations and
                Chief Operating Officer - FENOC
              D. Pace, Senior Vice President, Fleet Engineering - FENOC
              J. Rinckel, Vice President, Fleet Oversight - FENOC
              Director, Fleet Regulatory Affairs - FENOC
              Manager, Fleet Licensing - FENOC
              Manager, Site Regulatory Compliance - FENOC
              D. Jenkins, Attorney, FirstEnergy Corp.
              Public Utilities Commission of Ohio
              Ohio State Liaison Officer
              R. Owen, Ohio Department of Health


Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January , 2008.
Enclosure: Component Design Bases Inspection (CDBI) Document Request
SUBJECT:       PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN
              NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
              (CDBI) 05000440/2008006(DRS)
cc w/encl:    J. Hagan, President and Chief Nuclear Officer - FENOC
              J. Lash, Senior Vice President of Operations and
                Chief Operating Officer - FENOC
              D. Pace, Senior Vice President, Fleet Engineering - FENOC
              J. Rinckel, Vice President, Fleet Oversight - FENOC
              Director, Fleet Regulatory Affairs - FENOC
              Manager, Fleet Licensing - FENOC
              Manager, Site Regulatory Compliance - FENOC
              D. Jenkins, Attorney, FirstEnergy Corp.
              Public Utilities Commission of Ohio
              Ohio State Liaison Officer
              R. Owen, Ohio Department of Health
DISTRIBUTION:
RAG1
TJW2
TEB
RidsNrrDirslpab
JLC1
GEG
KGO
RML2
SRI Perry
DRPIII
DRSIII
PLB1
TXN
ROPreports@nrc.gov


            INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
DISTRIBUTION See next page
                      COMPONENT DESING BASES INSPECTION (CDBI)
Inspection Report:              05000440/2008006(DRS)
Inspection Dates:               May 5, 2008, through May 9, 2008;
G:\DRS\Work in Progress\Ltr  01  08 Perry Request for Information SNS.doc  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive
                                May 19, 2008, through May 23, 2008; and
To receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy
                                June 2, 2008, through June 6, 2008.
OFFICE: RIII  RIII  RIII  RIII  NAME: SSheldon:  ls AMStone  DATE: 01/28/08 01/30/08 
Inspection Procedure:          IP 71111.21 Component Design Bases Inspection
OFFICIAL RECORD COPY
Lead Inspector:                Stuart Sheldon, Lead Inspector
  Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January  , 2008.
                                (630) 829-9727
SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000440/2008006(DRS)  
                                sns2@nrc.gov
cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC  J. Lash, Senior Vice President of Operations and    Chief Operating Officer - FENOC  D. Pace, Senior Vice President, Fleet Engineering - FENOC
I.    Information Requested Prior to the On-site Information Gathering/Inspection Week
  J. Rinckel, Vice President, Fleet Oversight - FENOC  Director, Fleet Regulatory Affairs - FENOC  Manager, Fleet Licensing - FENOC  Manager, Site Regulatory Compliance - FENOC  D. Jenkins, Attorney, FirstEnergy Corp.   Public Utilities Commission of Ohio  Ohio State Liaison Officer
      The following information is requested by March 24, 2008, or sooner, to facilitate
  R. Owen, Ohio Department of Health
      inspection preparation. If you have any questions regarding this information, please call
   
      the team leader as soon as possible. (Please provide the information electronically in
 
      pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM
  Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January  , 2008.
      should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000440/2008006(DRS)  
      use. Information in lists should contain enough information to be easily understood by
  cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC  J. Lash, Senior Vice President of Operations and     Chief Operating Officer - FENOC
      someone who has knowledge of boiling water reactor technology).
  D. Pace, Senior Vice President, Fleet Engineering - FENOC  J. Rinckel, Vice President, Fleet Oversight - FENOC  Director, Fleet Regulatory Affairs - FENOC  Manager, Fleet Licensing - FENOC  Manager, Site Regulatory Compliance - FENOC  D. Jenkins, Attorney, FirstEnergy Corp.   Public Utilities Commission of Ohio
      1.       Risk ranking of top 150 components from your site specific probabilistic safety
  Ohio State Liaison Officer  R. Owen, Ohio Department of Health
                analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for
  DISTRIBUTION
                Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)
: RAG1 TJW2 TEB RidsNrrDirslpab
                (as applicable).
JLC1 
      2.      Provide a list of the top 200 cut-sets from your PSA.
GEG KGO RML2 SRI Perry  DRPIII
      3.      Risk ranking of operator actions from your site specific PSA sorted by RAW.
DRSIII  PLB1 TXN ROPreports@nrc.gov
                Provide copies of your human reliability worksheets for these items.
       4.      If you have an External Events or Fire PSA Model, provide the information
        
                requested in Items 1 and 2 for external events and fire. Provide narrative
   
                description of each coded event (including fire, flood zone description).
 
      5.      Any pre-existing evaluation or list of components and associated calculations
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
                with low design margins, (i.e., pumps closest to the design limit for flow or
COMPONENT DESING BASES INSPECTION (CDBI)  
                pressure, diesel generator close to design required output, heat exchangers
Enclosure
                close to rated design heat removal etc.).
1 Inspection Report:  05000440/2008006(DRS)
                                                  1                                      Enclosure
Inspection Dates:  May 5, 2008, through May 9, 2008;    May 19, 2008, through May 23, 2008; and      June 2, 2008, through June 6, 2008.  


          INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
Inspection Procedure:  IP 71111.21 "Component Design Bases Inspection"
                  COMPONENT DESING BASES INSPECTION (CDBI)
    6.     List of available design (setup) margins for valves in the motor-operated valve
Lead Inspector:  Stuart Sheldon, Lead Inspector  (630) 829-9727      sns2@nrc.gov
            (MOV) and air-operated valve (AOV) programs.
  I. Information Requested Prior to the On-site Information Gathering/Inspection Week
    7.     List of high risk Maintenance Rule systems/components based on engineering or
  The following information is requested by March 24, 2008, or sooner, to facilitate
            expert panel judgment.
inspection preparation.  If you have any questions regarding this information, please call the team leader as soon as possible.  (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on CDROM.  The CDROM should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough information to be easily understood by
    8.     Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
someone who has knowledge of boiling water reactor technology).
            category.
1. Risk ranking of top 150 components from your site specific probabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW).  Include values for Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)
    9.     Site top ten issues list (if applicable).
(as applicable).
    10.     A list of operating experience evaluations for the last 3 years.
2. Provide a list of the top 200 cut-sets from your PSA.
    11.     Information of any common cause failure of components experienced in the last
3. Risk ranking of operator actions from your site specific PSA sorted by RAW.
            5 years at your facility.
Provide copies of your human reliability worksheets for these items.
    12.     List of Root Cause Evaluations associated with component failures or design
4. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire.  Provide narrative description of each coded event (including fire, flood zone description).
            issues initiated/completed in the last 5 years.
5. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.).
    13.     Current management and engineering organizational chart.
 
    14.     Electronic copies of Updated Final Safety Analysis Report, Technical
 
            Specifications, Technical Specifications Bases, and Technical Requirements
INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
            Manual.
COMPONENT DESING BASES INSPECTION (CDBI)  
II. Information requested (for the approx. 30 selected components) to be available by
Enclosure
    April 23, 2008, (will be reviewed by the team in the Regional office during the week
2 6. List of available design (setup) margins for valves in the motor-operated valve (MOV) and air-operated valve (AOV) programs.  
    of April 28, 2008). This information should be separated for each selected
7. List of high risk Maintenance Rule systems/components based on engineering or expert panel judgment.  
    component, especially if provided electronically (e.g., folder with component
8. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category.  
    name that includes calculations, condition reports, maintenance history, etc).
9. Site top ten issues list (if applicable).
    1.     List of condition reports (corrective action documents) associated with each of
10. A list of operating experience evaluations for the last 3 years.  
            the selected components for the last 4 years.
11. Information of any common cause failure of components experienced in the last 5 years at your facility.  
    2.     The corrective maintenance history associated with each of the selected
12. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last 5 years.  
            components for the last 4 years.
13. Current management and engineering organizational chart.  
    3.     Copies of calculations associated with each of the selected components (if not
14. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. II. Information requested (for the approx. 30 selected components) to be available by April 23, 2008, (will be reviewed by the team in the Regional office during the week of April 28, 2008). This information should be separated for each selected component, especially if provided electronically (e.g., folder with component  
            previously provided), excluding data files. Please review the calculations and
name that includes calculations, condition reports, maintenance history, etc). 1. List of condition reports (corrective action documents) associated with each of the selected components for the last 4 years. 2. The corrective maintenance history associated with each of the selected components for the last 4 years. 3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of referenced material (such as drawings, engineering requests, and vendor letters). 4. System Health Reports, System Descriptions, and/or Design Basis Documents that are associated with each of the selected components.  
            also provide copies of referenced material (such as drawings, engineering
  INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
            requests, and vendor letters).
  COMPONENT DESIGN BASES INSPECTION (CDBI)  
    4.     System Health Reports, System Descriptions, and/or Design Basis Documents
  Enclosure
            that are associated with each of the selected components.
35. A list of modifications associated with each of the selected components. 6. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable. 7. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable. 8. Copies of any open temporary modifications associated with each of the selected components, if applicable. 9. Trend data on the selected electrical/mechanical components' performance for last 3 years (For example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). 10. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. 11. A copy of engineering/operations related audits completed in the last 2 years.  
                                                2                                    Enclosure
12. Provide list of PRA assumptions regarding operator actions and the associated procedures. III. Additional Information to be provided on May 5, 2008 on-site (for final 15 - 20 selected components)  
 
During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of April 28, 2008.   IV. Information Requested to be provided throughout the inspection
            INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
  1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). 3. One complete set of P&IDs and one line electrical drawings (paper copies). 4. Reference materials. (make available if needed during all on-site weeks):  
                    COMPONENT DESIGN BASES INSPECTION (CDBI)
  INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT  
    5.       A list of modifications associated with each of the selected components.
  COMPONENT DESIGN BASES INSPECTION (CDBI)  
    6.       Copies of operability evaluations associated with each of the selected
  Enclosure
              components and plans for restoring operability, if applicable.
4* IPE/PRA report;  
    7.       Copies of selected operator work-around evaluations associated with each of the
* Procurement documents for components selected (verify retrievable);  
              selected components and plans for resolution, if applicable.
* Plant procedures (normal, abnormal, emergency, surveillance, etc.); and  
    8.       Copies of any open temporary modifications associated with each of the selected
* Vendor manuals.  
              components, if applicable.
If you have questions regarding the information requested, please contact the lead inspector.
    9.       Trend data on the selected electrical/mechanical components performance for
              last 3 years (For example, pumps performance including in-service testing, other
              vibration monitoring, oil sample results, etc., as applicable).
    10.     A copy of any internal/external self-assessments and associated corrective
              action documents generated in preparation for the inspection.
    11.     A copy of engineering/operations related audits completed in the last 2 years.
    12.     Provide list of PRA assumptions regarding operator actions and the associated
              procedures.
III. Additional Information to be provided on May 5, 2008 on-site (for final 15 - 20
    selected components)
    During the in-office preparation activities, the team will be making final selections and
    may identify additional information needed to support the inspection. The lead inspector
    will provide a list of the additional information needed during the week of April 28, 2008.
IV. Information Requested to be provided throughout the inspection
    1.       Copies of any corrective action documents generated as a result of the teams
              questions or queries during this inspection.
    2.       Copies of the list of questions submitted by the team members and the
              status/resolution of the information requested (provide daily during the inspection
              to each team member).
    3.       One complete set of P&IDs and one line electrical drawings (paper copies).
    4.       Reference materials. (make available if needed during all on-site weeks):
                                                3                                Enclosure
 
            INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT
                    COMPONENT DESIGN BASES INSPECTION (CDBI)
              *     IPE/PRA report;
              *     Procurement documents for components selected (verify retrievable);
              *     Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
              *     Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
                                                4                                Enclosure
}}
}}

Revision as of 20:02, 14 November 2019

Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) 05000440-08-006 (DRS)
ML080310280
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/30/2008
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML080310280 (9)


See also: IR 05000440/2008006

Text

January 30, 2008

Mr. Barry S. Allen

Site Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

P. O. Box 97, 10 Center Road, A-PY-290

Perry, OH 44081-0097

SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) 05000440/2008006(DRS)

Dear Mr. Allen:

On May 5, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection

(CDBI) at the Perry Nuclear Power Plant. A team of six inspectors will perform this

3-week inspection. This inspection will be performed in accordance with NRC Baseline

Inspection Procedure (IP) 71111.21.

The CDBI inspection focuses on components that have high risk and low design margins. The

components to be reviewed during this baseline inspection will be identified during an in-office

preparation week prior to the first week of the on-site inspection. In addition, a number of risk

significant operator actions and operating experience issues, associated with the component

samples, will also be selected for review.

The inspection will include three weeks on-site, including the information gathering during the

first on-site week. The inspection team will consist of six NRC inspectors, of which five will

focus on engineering and one on operations. The current inspection schedule is as follows:

  • On-site weeks: May 5, 2008, through May 9, 2008;

May 19, 2008, through May 23, 2008; and

June 2, 2008, through June 6, 2008.

The team will be preparing for the inspection, mainly during the week of April 28, 2008, as

discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the

inspection team during the week of May 5, 2008, to review probabilistic risk assessment data,

and assist in identifying risk significant components, which will be reviewed during the

inspection.

Experience with previous baseline design inspections of similar depth and length has shown

that these type of inspections are extremely resource intensive, both for the NRC inspectors and

the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection.

B. Allen -2-

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than March 24, 2008. By

April 11, 2008, the lead inspector will communicate the initial selected set of approximately

30 high risk components.

  • The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

initial selected components, should be provided to the lead inspector at the Regional Office

no later than April 23, 2008. During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific reference

material. This information should be available to the team at Perry on May 5, 2008. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing

contact for this inspection is Mr. Kenneth Russell of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9727 or via e-mail at sns2@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure: Component Design Bases Inspection (CDBI) Document Request

DISTRIBUTION

See next page

B. Allen -2-

It is important that all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the on-site portions of the inspection.

Insofar as possible, this information should be provided electronically to the lead inspector. The

information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities. This information

should be provided to the lead inspector no later than March 24, 2008. By April 11, 2008, the lead

inspector will communicate the initial selected set of approximately 30 high risk components.

  • The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the initial

selected components, should be provided to the lead inspector at the Regional Office no later than

April 23, 2008. During the in-office preparation activities, the team may identify additional information

needed to support the inspection.

  • The last group includes the additional information above as well as plant specific reference material.

This information should be available to the team at Perry on May 5, 2008. It is also requested that

corrective action documents and/or questions developed during the inspection be provided to the lead

inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing contact for

this inspection is Mr. Kenneth Russell of your organization. If there are any questions about the

inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727

or via e-mail at sns2@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure: Component Design Bases Inspection (CDBI) Document Request

DISTRIBUTION

See next page

G:\DRS\Work in Progress\Ltr 01 08 Perry Request for Information SNS.doc

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE: RIII RIII RIII RIII

NAME: SSheldon: ls AMStone

DATE: 01/28/08 01/30/08

OFFICIAL RECORD COPY

Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January , 2008.

SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) 05000440/2008006(DRS)

cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC

J. Lash, Senior Vice President of Operations and

Chief Operating Officer - FENOC

D. Pace, Senior Vice President, Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

Director, Fleet Regulatory Affairs - FENOC

Manager, Fleet Licensing - FENOC

Manager, Site Regulatory Compliance - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

Letter to Mr. Barry S. Allen from Ms. A M. Stone dated January , 2008.

SUBJECT: PERRY NUCLEAR POWER PLANT REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

(CDBI) 05000440/2008006(DRS)

cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC

J. Lash, Senior Vice President of Operations and

Chief Operating Officer - FENOC

D. Pace, Senior Vice President, Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

Director, Fleet Regulatory Affairs - FENOC

Manager, Fleet Licensing - FENOC

Manager, Site Regulatory Compliance - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

DISTRIBUTION:

RAG1

TJW2

TEB

RidsNrrDirslpab

JLC1

GEG

KGO

RML2

SRI Perry

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESING BASES INSPECTION (CDBI)

Inspection Report: 05000440/2008006(DRS)

Inspection Dates: May 5, 2008, through May 9, 2008;

May 19, 2008, through May 23, 2008; and

June 2, 2008, through June 6, 2008.

Inspection Procedure: IP 71111.21 Component Design Bases Inspection

Lead Inspector: Stuart Sheldon, Lead Inspector

(630) 829-9727

sns2@nrc.gov

I. Information Requested Prior to the On-site Information Gathering/Inspection Week

The following information is requested by March 24, 2008, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM

should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of boiling water reactor technology).

1. Risk ranking of top 150 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2. Provide a list of the top 200 cut-sets from your PSA.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW.

Provide copies of your human reliability worksheets for these items.

4. If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

5. Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

1 Enclosure

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESING BASES INSPECTION (CDBI)

6. List of available design (setup) margins for valves in the motor-operated valve

(MOV) and air-operated valve (AOV) programs.

7. List of high risk Maintenance Rule systems/components based on engineering or

expert panel judgment.

8. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)

category.

9. Site top ten issues list (if applicable).

10. A list of operating experience evaluations for the last 3 years.

11. Information of any common cause failure of components experienced in the last

5 years at your facility.

12. List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

13. Current management and engineering organizational chart.

14. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

II. Information requested (for the approx. 30 selected components) to be available by

April 23, 2008, (will be reviewed by the team in the Regional office during the week

of April 28, 2008). This information should be separated for each selected

component, especially if provided electronically (e.g., folder with component

name that includes calculations, condition reports, maintenance history, etc).

1. List of condition reports (corrective action documents) associated with each of

the selected components for the last 4 years.

2. The corrective maintenance history associated with each of the selected

components for the last 4 years.

3. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of referenced material (such as drawings, engineering

requests, and vendor letters).

4. System Health Reports, System Descriptions, and/or Design Basis Documents

that are associated with each of the selected components.

2 Enclosure

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

5. A list of modifications associated with each of the selected components.

6. Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., as applicable).

10. A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

11. A copy of engineering/operations related audits completed in the last 2 years.

12. Provide list of PRA assumptions regarding operator actions and the associated

procedures.

III. Additional Information to be provided on May 5, 2008 on-site (for final 15 - 20

selected components)

During the in-office preparation activities, the team will be making final selections and

may identify additional information needed to support the inspection. The lead inspector

will provide a list of the additional information needed during the week of April 28, 2008.

IV. Information Requested to be provided throughout the inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3. One complete set of P&IDs and one line electrical drawings (paper copies).

4. Reference materials. (make available if needed during all on-site weeks):

3 Enclosure

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

  • IPE/PRA report;
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

4 Enclosure