ML091520257: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Proposed Operating Test Comments | {{#Wiki_filter:Proposed Operating Test Comments | ||
: 1. Change SRO JPM ADM 2 so we can perform in the simulator or classroom. | : 1. Change SRO JPM ADM 2 so we can perform in the simulator or classroom. Done | ||
: 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done | |||
: 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A. | : 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A. | ||
: 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC | : 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC cant evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.}} | ||
Latest revision as of 05:13, 14 November 2019
| ML091520257 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/07/2008 |
| From: | NRC/RGN-III |
| To: | Entergy Nuclear Palisades |
| Shared Package | |
| ML082200310 | List: |
| References | |
| Download: ML091520257 (1) | |
Text
Proposed Operating Test Comments
- 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done
- 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A.
- 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC cant evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.