ML091760686: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 06/25/2009 | | issue date = 06/25/2009 | ||
| title = Relaxation of Confirmatory Order. Ltr. to Christopher J. Schwarz from Cynthia Carpenter | | title = Relaxation of Confirmatory Order. Ltr. to Christopher J. Schwarz from Cynthia Carpenter | ||
| author name = Carpenter C | | author name = Carpenter C | ||
| author affiliation = NRC/OE | | author affiliation = NRC/OE | ||
| addressee name = Schwarz C | | addressee name = Schwarz C | ||
| addressee affiliation = Entergy Nuclear Operations, Inc | | addressee affiliation = Entergy Nuclear Operations, Inc | ||
| docket = 05000255 | | docket = 05000255 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 25, 2009 | {{#Wiki_filter:June 25, 2009 EA-06-178 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations, Inc. | ||
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9503 | |||
EA-06-178 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9503 | |||
==SUBJECT:== | ==SUBJECT:== | ||
RELAXATION OF CONFIRMATORY ORDER | RELAXATION OF CONFIRMATORY ORDER | ||
==Dear Mr. Schwarz:== | ==Dear Mr. Schwarz:== | ||
In your letter dated June 1, 2009, you requested the Nuclear Regulatory | In your letter dated June 1, 2009, you requested the Nuclear Regulatory Commissions (NRCs) approval to relax one of the conditions specified in the Confirmatory Order (Order) issued to Palisades Nuclear Plant (PNP) on January 3, 2007. Specifically, you requested a relaxation to Section IV, Condition 3 of the Order to allow new employees holding supervisory positions and higher be trained on safety conscious work environment (SCWE) principles within 12 months of their hire date unless they had the same or equivalent SCWE training within the previous two years. The condition of the Order requires that the training be performed within nine (9) months of the employees hire date. | ||
The Confirmatory Order specifies that the Director, Office of Enforcement, may relax or rescind, in writing, any of the conditions upon a showing by the Licensee of good cause. Your letter indicated that this change would allow PNP to align its supervisory training with the Entergy Nuclear Operations, Inc (ENO) fleet supervisory training program for both initial and continuing training requirements. At the time the Order was issued, the operating license for PNP was held, and PNP was operated by Nuclear Management Company, LLC (NMC). On April 11, 2007, Consumers Energy sold PNP to ENO and ENO became the owner, operator, and holder of the facility operating license. You also stated that because SCWE has become a core value of ENO, principles of SCWE permeate the culture at ENO plants, including PNP, such that new personnel are exposed to it organizationally before being introduced to it in a formal instructional setting. | The Confirmatory Order specifies that the Director, Office of Enforcement, may relax or rescind, in writing, any of the conditions upon a showing by the Licensee of good cause. Your letter indicated that this change would allow PNP to align its supervisory training with the Entergy Nuclear Operations, Inc (ENO) fleet supervisory training program for both initial and continuing training requirements. At the time the Order was issued, the operating license for PNP was held, and PNP was operated by Nuclear Management Company, LLC (NMC). On April 11, 2007, Consumers Energy sold PNP to ENO and ENO became the owner, operator, and holder of the facility operating license. You also stated that because SCWE has become a core value of ENO, principles of SCWE permeate the culture at ENO plants, including PNP, such that new personnel are exposed to it organizationally before being introduced to it in a formal instructional setting. | ||
My staff has reviewed your request, and I hereby grant approval to relax the above condition of the Order (to extend by three months the required due date for the initial training of new employees holding supervisory positions and higher) due to the showing of good cause. You are not required to respond to this letter; however, if you choose to provide one your response should not, to the extent possible, include any personal privacy, proprietary, or safeguards | My staff has reviewed your request, and I hereby grant approval to relax the above condition of the Order (to extend by three months the required due date for the initial training of new employees holding supervisory positions and higher) due to the showing of good cause. You are not required to respond to this letter; however, if you choose to provide one your response should not, to the extent possible, include any personal privacy, proprietary, or safeguards | ||
C. J. Schwarz 2 information so that it can be made available to the Public without redaction. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Cynthia A. Carpenter, Director Office of Enforcement cc: Edward Weinkam, Senior Manager, Licensing Docket No. 50-255 License No. DPR-20 | |||
ML091760686 XPUBLIC | C. J. Schwarz 2 information so that it can be made available to the Public without redaction. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
/RA/ | |||
Cynthia A. Carpenter, Director Office of Enforcement cc: Edward Weinkam, Senior Manager, Licensing Docket No. 50-255 License No. DPR-20 Electronic DISTRIBUTION: | |||
ADAMS (PARS) B. Borchardt, EDO M. Virgilio, DEDMRT R. Campbell, OEDO C. Marco, OGC M. Satorius, RA SRI Palisades V. Mitlying, RIII K. OBrien, RIII J. Heck, RIII C. Pederson, RIII RidsNrrPMPalisades M. Ashley, NRR OE r/f OEWEB EA File Enforcement Coordinators RI, RII, RIV ML091760686 XPUBLIC XNON-SENSITIVE OFFICE OE OE:SC RIII OGC NAME R. Arrighi D. Solorio K. OBrien MBarkman for C. Marco DATE 6/12/09 6/15/09 6/25/09 (nlo) 6/25/09 OE:D OFFICE NAME C. Carpenter DATE 6/25/09 OFFICIAL RECORD COPY}} |
Latest revision as of 05:35, 14 November 2019
ML091760686 | |
Person / Time | |
---|---|
Site: | Palisades ![]() |
Issue date: | 06/25/2009 |
From: | Carpenter C NRC/OE |
To: | Schwarz C Entergy Nuclear Operations |
Arrighi R, OE | |
References | |
EA-06-178 | |
Download: ML091760686 (3) | |
Text
June 25, 2009 EA-06-178 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9503
SUBJECT:
RELAXATION OF CONFIRMATORY ORDER
Dear Mr. Schwarz:
In your letter dated June 1, 2009, you requested the Nuclear Regulatory Commissions (NRCs) approval to relax one of the conditions specified in the Confirmatory Order (Order) issued to Palisades Nuclear Plant (PNP) on January 3, 2007. Specifically, you requested a relaxation to Section IV, Condition 3 of the Order to allow new employees holding supervisory positions and higher be trained on safety conscious work environment (SCWE) principles within 12 months of their hire date unless they had the same or equivalent SCWE training within the previous two years. The condition of the Order requires that the training be performed within nine (9) months of the employees hire date.
The Confirmatory Order specifies that the Director, Office of Enforcement, may relax or rescind, in writing, any of the conditions upon a showing by the Licensee of good cause. Your letter indicated that this change would allow PNP to align its supervisory training with the Entergy Nuclear Operations, Inc (ENO) fleet supervisory training program for both initial and continuing training requirements. At the time the Order was issued, the operating license for PNP was held, and PNP was operated by Nuclear Management Company, LLC (NMC). On April 11, 2007, Consumers Energy sold PNP to ENO and ENO became the owner, operator, and holder of the facility operating license. You also stated that because SCWE has become a core value of ENO, principles of SCWE permeate the culture at ENO plants, including PNP, such that new personnel are exposed to it organizationally before being introduced to it in a formal instructional setting.
My staff has reviewed your request, and I hereby grant approval to relax the above condition of the Order (to extend by three months the required due date for the initial training of new employees holding supervisory positions and higher) due to the showing of good cause. You are not required to respond to this letter; however, if you choose to provide one your response should not, to the extent possible, include any personal privacy, proprietary, or safeguards
C. J. Schwarz 2 information so that it can be made available to the Public without redaction. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Cynthia A. Carpenter, Director Office of Enforcement cc: Edward Weinkam, Senior Manager, Licensing Docket No. 50-255 License No. DPR-20
C. J. Schwarz 2 information so that it can be made available to the Public without redaction. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Cynthia A. Carpenter, Director Office of Enforcement cc: Edward Weinkam, Senior Manager, Licensing Docket No. 50-255 License No. DPR-20 Electronic DISTRIBUTION:
ADAMS (PARS) B. Borchardt, EDO M. Virgilio, DEDMRT R. Campbell, OEDO C. Marco, OGC M. Satorius, RA SRI Palisades V. Mitlying, RIII K. OBrien, RIII J. Heck, RIII C. Pederson, RIII RidsNrrPMPalisades M. Ashley, NRR OE r/f OEWEB EA File Enforcement Coordinators RI, RII, RIV ML091760686 XPUBLIC XNON-SENSITIVE OFFICE OE OE:SC RIII OGC NAME R. Arrighi D. Solorio K. OBrien MBarkman for C. Marco DATE 6/12/09 6/15/09 6/25/09 (nlo) 6/25/09 OE:D OFFICE NAME C. Carpenter DATE 6/25/09 OFFICIAL RECORD COPY