| issue date = 06/03/2010
| issue date = 06/03/2010
| title = Notification of Inspection (IR 05000285-10-004) and Request for Information
| title = Notification of Inspection (IR 05000285-10-004) and Request for Information
| author name = Farnholtz T A
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Bannister D J
| addressee name = Bannister D
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000285/2010004]]
See also: [[see also::IR 05000285/2010004]]


=Text=
=Text=
{{#Wiki_filter:June 3, 2010  
{{#Wiki_filter:UNITED STATES
  David J. Bannister, Vice President     and Chief Nuclear Officer  
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Omaha Public Power District 444 South 16
                                                    R E GI ON I V
th St. Mall Omaha, NE 68102-2247  
                                        612 EAST LAMAR BLVD , SU I TE 400
 
                                          AR LI N GTON , TEXAS 76011-4125
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2010004) AND REQUEST FOR INFORMATION  
                                                June 3, 2010
Dear Mr. Bannister:  
David J. Bannister, Vice President
  and Chief Nuclear Officer
Omaha Public Power District
444 South 16th St. Mall
Omaha, NE 68102-2247
SUBJECT:       FORT CALHOUN STATION - NOTIFICATION OF INSPECTION
                (NRC INSPECTION REPORT 05000285/2010004) AND REQUEST FOR
                INFORMATION
Dear Mr. Bannister:
From July 19 - 30, 2010, Reactor Inspectors from NRCs Region IV office will perform the
baseline inspection of changes, tests, experiments, and permanent plant modifications at
Fort Calhoun Station, using NRC Inspection Procedure 71111.17, Evaluations of Changes,
Tests, Experiments, and Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up-to-date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Erick Matzke of your licensing organization.
If there are any questions about this inspection or the material requested, please contact the
lead inspector, Gerond A. George, at 817-276-6562 or by email Gerond.George@nrc.gov.


From July 19 - 30, 2010, Reactor Inspectors from NRC's Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at Fort Calhoun Station, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications." 
Omaha Public Power District                     -2-
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  Upon review of these documents, the inspectors will select additional documentation for review upon arrival.  It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
onsite portions of the inspection.
enclosure will be available electronically for public inspection in the NRC Public Document
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Erick Matzke of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the
Room or from the Publicly Available Records (PARS) component of NRC's document system
lead inspector, Gerond A. George, at 817-276-6562 or by email Gerond.George@nrc.gov. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
       
rm/adams.html (the Public Electronic Reading Room).
Omaha Public Power District - 2 -  
                                              Sincerely,
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
                                                /RA/
      Sincerely, /RA/       Thomas A. Farnholtz, Chief       Engineering Branch 1       Division of Reactor Safety  
                                              Thomas A. Farnholtz, Chief
  Docket:   50-285  
                                              Engineering Branch 1
License: DPR-40  
                                              Division of Reactor Safety
Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document Request cc w/enclosure: Jeffrey A. Reinhart Site Vice President Omaha Public Power District  
Docket: 50-285
Fort Calhoun Station FC-2-4 Adm. P.O. Box 550 Fort Calhoun, NE 68023-0550  
License: DPR-40
Mr. Thomas C. Matthews  
Enclosure:
Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm. P.O. Box 550 Fort Calhoun, NE 68023-0550  
  Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document
  Request
cc w/enclosure:
Jeffrey A. Reinhart
Site Vice President
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
Mr. Thomas C. Matthews
Manager - Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
David A. Repka
Winston & Strawn
1700 K Street, NW
Washington, DC 20006-3817
Chairman
Washington County Board of Supervisors
P.O. Box 466
Blair, NE 68008


David A. Repka Winston & Strawn 1700 K Street, NW Washington, DC  20006-3817
Omaha Public Power District           -3-
Chairman
Ms. Julia Schmitt, Manager
Washington County Board of Supervisors P.O. Box 466 Blair, NE  68008
Radiation Control Program
 
Nebraska Health & Human Services
Omaha Public Power District - 3 -  
Division of Public Health
Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Division of Public Health  
P.O. Box 95026
P.O. Box 95026 Lincoln, NE 68509-5026  
Lincoln, NE 68509-5026
Ms. Melanie Rasmussen Radiation Control Program Officer  
Ms. Melanie Rasmussen
Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319  
Radiation Control Program Officer
Chief, Technological Hazards Branch  
Bureau of Radiological Health
FEMA, Region VII 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372  
Iowa Department of Public Health
 
Lucas State Office Building, 5th Floor
Omaha Public Power District  - 4 -
321 East 12th Street
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov)  Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov)
Des Moines, IA 50319
DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov)
Chief, Technological Hazards Branch
Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) Project Engineer (William.Schaup@nrc.gov) FCS Administrative Assistant (Berni.Madison@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
FEMA, Region VII
Project Manager (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372


   
Omaha Public Power District                    -4-
   
Electronic distribution by RIV:
    R:\REACTORS\FC2010004 RFI rpt - GAG   ADAMS ML   ADAMS:   No        Yes SUNSI Review Complete Reviewer Initials:GAG  
Regional Administrator (Elmo.Collins@nrc.gov)
Publicly Available   Non-Sensitive  
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
  Non-publicly Available   Sensitive DRS/EB1 C: DRS/EB1  
DRP Director (Dwight.Chamberlain@nrc.gov)
  G. George T. Farnholtz       6 /2 /10 6 /2 /10   OFFICIAL RECORD COPY                                         T=Telephone           E=E-mail       F=Fax  
DRP Deputy Director (Anton.Vegel@nrc.gov)
  - 1 - Enclosure Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification  
DRS Director (Roy.Caniano@nrc.gov)
  Inspection Dates: July 19 - 30, 2010  
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Inspection Procedures: IP 71111.17 "Evaluation of Changes, Tests, or Experiments and     Permanent Plant Modifications"
Resident Inspector (Jacob.Wingebach@nrc.gov)
Inspectors:   Gerond A. George, Reactor Inspector, Lead Inspector     Isaac Anchondo, Reactor Inspector  
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
    Theresa Buchanan, Reactor Inspector  
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
 
Project Engineer (William.Schaup@nrc.gov)
FCS Administrative Assistant (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
R:\REACTORS\FC2010004 RFI rpt - GAG                         ADAMS ML
ADAMS:       No        7Yes      SUNSI Review Complete         Reviewer Initials:GAG
                                  7Publicly Available           7 Non-Sensitive
                                      Non-publicly Available       Sensitive
DRS/EB1                 C: DRS/EB1
G. George               T. Farnholtz
6 /2 /10               6 /2 /10
OFFICIAL RECORD COPY                                   T=Telephone     E=E-mail       F=Fax
 
    Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
Inspection Dates:               July 19 - 30, 2010
Inspection Procedures:         IP 71111.17 Evaluation of Changes, Tests, or Experiments and
                                Permanent Plant Modifications
Inspectors:                     Gerond A. George, Reactor Inspector, Lead Inspector
                                Isaac Anchondo, Reactor Inspector
                                Theresa Buchanan, Reactor Inspector
Information Requested for the In-Office Preparation Week
Information Requested for the In-Office Preparation Week
 
The following information should be sent to the Region IV office in hard copy or electronic
The following information should be sent to the Region IV office in hard copy or electronic format (Certrec database preferred), in care of Gerond A. George, by July 12, 2010, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. Also, we request that you categorize the documents in your response with the numbered list below.  
format (Certrec database preferred), in care of Gerond A. George, by July 12, 2010, to facilitate
Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.  
the selection of specific items that will be reviewed during the onsite inspection week. The
1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since August 14, 2006, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. We ask that the
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC from August 14, 2006, to the present. Note: Description of evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
specific items requested be available and ready for review on the first day of inspection. Also,
3. Fort Calhoun Station procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  
we request that you categorize the documents in your response with the numbered list below.
4. A list with descriptions of all Corrective Action documents related to 50.59 activities, including screenings and evaluations from August 14, 2006, to the present.  
Please provide requested documentation electronically if possible. If requested documents are
5. A list with descriptions of all permanent plant modifications, dating from August 14, 2006, Include sufficient detail to enable the inspector to determine the significance of each modification. For this inspection, permanent plant modifications include permanent plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.
large and only hard copy formats are available, please inform the inspector(s), and provide
  - 2 - Enclosure 6. Fort Calhoun Station procedure(s) for implementing and controlling permanent plant modifications.  
subject documentation during the first day of the onsite inspection. If you have any questions
7. A list with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since August 14, 2006. Include  
regarding this information request, please call the lead inspector as soon as possible.
sufficient detail to enable the inspector to determine the significance of each modification.  
    1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.  
        August 14, 2006, which did not result in an evaluation. Note: Description of screenings
9. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.  
        should be brief, but of sufficient detail so that inspectors can determine the significance
  Inspector Contact Information:  
        of the issue.
    2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in
Gerond George Isaac Anchondo Theresa Buchanan Reactor Inspector Reactor Inspector Reactor Inspector 817-276-6562   817-860-8152   817-276-6503 Gerond.George@nrc.gov Isaac.Anchondo@nrc.gov Theresa.Buchanan@nrc.gov
        an application for license amendment to NRC from August 14, 2006, to the present.
        Note: Description of evaluations should be brief, but of sufficient detail so that
Mailing Address: US NRC Region IV Attn: Gerond George 612 E. Lamar Blvd., Suite 400  
        inspectors can determine the significance of the issue.
Arlington, TX 76011-4125
    3. Fort Calhoun Station procedure(s) for conducting 10 CFR 50.59 screenings and
        evaluations.
    4. A list with descriptions of all Corrective Action documents related to 50.59 activities,
        including screenings and evaluations from August 14, 2006, to the present.
    5. A list with descriptions of all permanent plant modifications, dating from August 14, 2006,
        Include sufficient detail to enable the inspector to determine the significance of each
        modification. For this inspection, permanent plant modifications include permanent plant
        changes, design changes, setpoint changes, procedure changes, equivalency
        evaluations, suitability analyses, calculations, and commercial grade dedications.
                                                  -1-                               Enclosure
 
    6. Fort Calhoun Station procedure(s) for implementing and controlling permanent plant
        modifications.
    7. A list with descriptions of all Corrective Action documents related to your permanent
        plant modification program and its implementation since August 14, 2006. Include
        sufficient detail to enable the inspector to determine the significance of each
        modification.
    8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including
        qualification dates.
    9. A listing of personnel qualified to review and approve 50.59 screenings and/or
        evaluations, including qualification dates.
Inspector Contact Information:
Gerond George                   Isaac Anchondo               Theresa Buchanan
Reactor Inspector               Reactor Inspector             Reactor Inspector
817-276-6562                   817-860-8152                 817-276-6503
Gerond.George@nrc.gov           Isaac.Anchondo@nrc.gov       Theresa.Buchanan@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Gerond George
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125
                                                -2-                                  Enclosure
}}
}}

Latest revision as of 18:30, 13 November 2019

Notification of Inspection (IR 05000285-10-004) and Request for Information
ML101550050
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/03/2010
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Bannister D
Omaha Public Power District
References
IR-10-004
Download: ML101550050 (6)


See also: IR 05000285/2010004

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

June 3, 2010

David J. Bannister, Vice President

and Chief Nuclear Officer

Omaha Public Power District

444 South 16th St. Mall

Omaha, NE 68102-2247

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000285/2010004) AND REQUEST FOR

INFORMATION

Dear Mr. Bannister:

From July 19 - 30, 2010, Reactor Inspectors from NRCs Region IV office will perform the

baseline inspection of changes, tests, experiments, and permanent plant modifications at

Fort Calhoun Station, using NRC Inspection Procedure 71111.17, Evaluations of Changes,

Tests, Experiments, and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up-to-date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Erick Matzke of your licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector, Gerond A. George, at 817-276-6562 or by email Gerond.George@nrc.gov.

Omaha Public Power District -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas A. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-285

License: DPR-40

Enclosure:

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document

Request

cc w/enclosure:

Jeffrey A. Reinhart

Site Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

Mr. Thomas C. Matthews

Manager - Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

David A. Repka

Winston & Strawn

1700 K Street, NW

Washington, DC 20006-3817

Chairman

Washington County Board of Supervisors

P.O. Box 466

Blair, NE 68008

Omaha Public Power District -3-

Ms. Julia Schmitt, Manager

Radiation Control Program

Nebraska Health & Human Services

Division of Public Health

P.O. Box 95026

Lincoln, NE 68509-5026

Ms. Melanie Rasmussen

Radiation Control Program Officer

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

Chief, Technological Hazards Branch

FEMA, Region VII

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Omaha Public Power District -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (William.Schaup@nrc.gov)

FCS Administrative Assistant (Berni.Madison@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

R:\REACTORS\FC2010004 RFI rpt - GAG ADAMS ML

ADAMS: No 7Yes SUNSI Review Complete Reviewer Initials:GAG

7Publicly Available 7 Non-Sensitive

Non-publicly Available Sensitive

DRS/EB1 C: DRS/EB1

G. George T. Farnholtz

6 /2 /10 6 /2 /10

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates: July 19 - 30, 2010

Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors: Gerond A. George, Reactor Inspector, Lead Inspector

Isaac Anchondo, Reactor Inspector

Theresa Buchanan, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec database preferred), in care of Gerond A. George, by July 12, 2010, to facilitate

the selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since

August 14, 2006, which did not result in an evaluation. Note: Description of screenings

should be brief, but of sufficient detail so that inspectors can determine the significance

of the issue.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC from August 14, 2006, to the present.

Note: Description of evaluations should be brief, but of sufficient detail so that

inspectors can determine the significance of the issue.

3. Fort Calhoun Station procedure(s) for conducting 10 CFR 50.59 screenings and

evaluations.

4. A list with descriptions of all Corrective Action documents related to 50.59 activities,

including screenings and evaluations from August 14, 2006, to the present.

5. A list with descriptions of all permanent plant modifications, dating from August 14, 2006,

Include sufficient detail to enable the inspector to determine the significance of each

modification. For this inspection, permanent plant modifications include permanent plant

changes, design changes, setpoint changes, procedure changes, equivalency

evaluations, suitability analyses, calculations, and commercial grade dedications.

-1- Enclosure

6. Fort Calhoun Station procedure(s) for implementing and controlling permanent plant

modifications.

7. A list with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since August 14, 2006. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including

qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

Gerond George Isaac Anchondo Theresa Buchanan

Reactor Inspector Reactor Inspector Reactor Inspector

817-276-6562 817-860-8152 817-276-6503

Gerond.George@nrc.gov Isaac.Anchondo@nrc.gov Theresa.Buchanan@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Gerond George

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125

-2- Enclosure