ML102590093: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 15, 2010 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 15, 2010 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:                Exelon Generation Company, LLC Name of Facility:                Braidwood Station, Units 1 and 2 Docket Nos:                      50-456; 50-457 Date and Time of Meeting:        Thursday, September 30, 2010, 6:00 p.m. (CDT)
Location of Meeting:              Braidwood City Hall, Public Meeting Room 141 W. Main Street Braidwood, Illinois 60408 Purpose of Meeting:              This is the exit meeting for the Special Inspection that was conducted at Braidwood in response to the Dual Unit Shutdown on August 16, 2010. We will follow up with the documented results of our Inspection within 45 days of the meeting. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
Category 1:                      This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. For details, please call the NRC meeting contact listed on the NRC web site or call the NRCs toll-free number, 1-800-368-5642, and ask the operator to be connected to the meeting contact.


Name of Licensee:  Exelon Generation Company, LLC
Notice of Significant                               Licensee Meeting NRC Attendees G. Shear, Acting Director, Division of Reactor Projects R. Skokowski, Chief, Branch 3, Division of Reactor Projects Jamie Benjamin, Senior Resident Inspector, Braidwood Diana Betancourt-Roldan, Acting Resident Inspector, Braidwood J. Jandovitz, Lead Inspector, Division of Reactor Projects Meghan Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects Nestor Féliz Adorno, Reactor Inspector, Division of Reactor Safety Others as assigned Licensee Attendees Amir Shahkarami, Site Vice President Others as assigned Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to the Office of Public Affairs at 630-829-9662 or 630-829-9663 by September 27, 2010.
 
Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 27, 2010. This step will ensure that sufficient copies of meeting materials are available.
Name of Facility:  Braidwood Station, Units 1 and 2
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.
 
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.
Docket Nos:    50-456; 50-457
Meeting Contact:         Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov Approved By:           /RA/
 
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects
Date and Time of Meeting:  Thursday, September 30, 2010, 6:00 p.m. (CDT)
 
Location of Meeting:  Braidwood City Hall, Public Meeting Room 141 W. Main Street Braidwood, Illinois 60408
 
Purpose of Meeting:  This is the exit meeting for the Special Inspection that was conducted at Braidwood in response to the Dual Unit Shutdown on August 16, 2010. We will follow up with the documented results of our Inspection within 45 days of the meeting. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
 
Category 1:    This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. For details, please call the NRC meeting contact listed on the NRC web site or call the NRC's toll-free number, 1-800-368-5642, and ask the operator to be connected to the meeting contact.
 
Notice of Significant   Licensee Meeting  
 
NRC Attendees G. Shear, Acting Director, Division of Reactor Projects R. Skokowski, Chief, Branch 3, Division of Reactor Projects Jamie Benjamin, Senior Resident Inspector, Braidwood Diana Betancourt-Roldan, Acting Resident Inspector, Braidwood J. Jandovitz, Lead Inspector, Division of Reactor Projects Meghan Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects Nestor Féliz Adorno, Reactor Inspector, Division of Reactor Safety Others as assigned  
 
Licensee Attendees Amir Shahkarami, Site Vice President Others as assigned  
 
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to the Office of Public Affairs at 630-829-9662 or 630-829-9663 by September 27, 2010.
Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 27, 2010. This step will ensure that sufficient copies of meeting materials are available.  
 
The NRC provides reas onable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.  
 
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.  
 
Meeting Contact: Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov  
 
Approved By:   /RA/   Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects  
 
Notice of Significant  Licensee Meeting
 
NRC Attendees G. Shear, Acting Director, Division of Reactor Projects R. Skokowski, Chief, Branch 3, Division of Reactor Projects Jamie Benjamin, Senior Resident Inspector, Braidwood Diana Betancourt-Roldan, Acting Resident Inspector, Braidwood J. Jandovitz, Lead Inspector, Division of Reactor Projects Meghan Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects Nestor Féliz Adorno, Reactor Inspector, Division of Reactor Safety Others as assigned
 
Licensee Attendees Amir Shahkarami, Site Vice President Others as assigned


Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Office of Public Affairs at 630-829-9662 or 630-829-9663 by September 27, 2010.
Notice of Significant                                                          Licensee Meeting NRC Attendees G. Shear, Acting Director, Division of Reactor Projects R. Skokowski, Chief, Branch 3, Division of Reactor Projects Jamie Benjamin, Senior Resident Inspector, Braidwood Diana Betancourt-Roldan, Acting Resident Inspector, Braidwood J. Jandovitz, Lead Inspector, Division of Reactor Projects Meghan Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects Nestor Féliz Adorno, Reactor Inspector, Division of Reactor Safety Others as assigned Licensee Attendees Amir Shahkarami, Site Vice President Others as assigned Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Office of Public Affairs at 630-829-9662 or 630-829-9663 by September 27, 2010.
Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 27, 2010. This step will ensure that sufficient copies of meeting materials are available.
Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 27, 2010. This step will ensure that sufficient copies of meeting materials are available.
The NRC provides reas onable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.  
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.
 
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.  
Meeting Contact:                     Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov Approved By:                         /RA/
 
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects DOCUMENT NAME: G:\BRAI\Braidwood SIT Public Meeting Notice.doc Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                               RIII NAME               MThorpe-                           RSkokowski Kavanaugh:dtp DATE               09/15/10                           09/15/10 OFFICIAL RECORD COPY
Meeting Contact: Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov Approved By:   /RA/   Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects  
 
DOCUMENT NAME: G:\BRAI\Braidwood SIT Public Meeting Notice.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII       NAME MThorpe-Kavanaugh:dtp RSkokowski 
 
DATE 09/15/10 09/15/10 OFFICIAL RECORD COPY
 
Notice of Significant    Licensee Meeting
 
Distribution
: Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource Gary Shear, Acting Director, Division of R eactor Proj ects, RIII Patrick Louden, Acting Deputy Director, Division of Reacto r Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Kenneth O'Brien, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Braidwood DRS Branch Chiefs:
Robert Daley David Hills Eric Duncan AnnMarie Stone Billy Dickson Hironori Peterson


Allan Barker, Regi onal State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP}}
Notice of Significant                            Licensee Meeting Distribution:
Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Patrick Louden, Acting Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Kenneth OBrien, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Braidwood DRS Branch Chiefs:
Robert Daley David Hills Eric Duncan AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP}}

Revision as of 13:11, 13 November 2019

09/30/10 - Public Exit Meeting Notice for the Special Inspection That Was Conducted at Braidwood in Response to Dual Unit Shutdown on August 16, 2010
ML102590093
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/15/2010
From: Richard Skokowski
Region 3 Branch 3
To:
References
Download: ML102590093 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 15, 2010 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Exelon Generation Company, LLC Name of Facility: Braidwood Station, Units 1 and 2 Docket Nos: 50-456; 50-457 Date and Time of Meeting: Thursday, September 30, 2010, 6:00 p.m. (CDT)

Location of Meeting: Braidwood City Hall, Public Meeting Room 141 W. Main Street Braidwood, Illinois 60408 Purpose of Meeting: This is the exit meeting for the Special Inspection that was conducted at Braidwood in response to the Dual Unit Shutdown on August 16, 2010. We will follow up with the documented results of our Inspection within 45 days of the meeting. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Category 1: This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

Interested members of the public can participate in this meeting via a toll-free audio teleconference. For details, please call the NRC meeting contact listed on the NRC web site or call the NRCs toll-free number, 1-800-368-5642, and ask the operator to be connected to the meeting contact.

Notice of Significant Licensee Meeting NRC Attendees G. Shear, Acting Director, Division of Reactor Projects R. Skokowski, Chief, Branch 3, Division of Reactor Projects Jamie Benjamin, Senior Resident Inspector, Braidwood Diana Betancourt-Roldan, Acting Resident Inspector, Braidwood J. Jandovitz, Lead Inspector, Division of Reactor Projects Meghan Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects Nestor Féliz Adorno, Reactor Inspector, Division of Reactor Safety Others as assigned Licensee Attendees Amir Shahkarami, Site Vice President Others as assigned Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to the Office of Public Affairs at 630-829-9662 or 630-829-9663 by September 27, 2010.

Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 27, 2010. This step will ensure that sufficient copies of meeting materials are available.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

Meeting Contact: Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov Approved By: /RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects

Notice of Significant Licensee Meeting NRC Attendees G. Shear, Acting Director, Division of Reactor Projects R. Skokowski, Chief, Branch 3, Division of Reactor Projects Jamie Benjamin, Senior Resident Inspector, Braidwood Diana Betancourt-Roldan, Acting Resident Inspector, Braidwood J. Jandovitz, Lead Inspector, Division of Reactor Projects Meghan Thorpe-Kavanaugh, Reactor Engineer, Division of Reactor Projects Nestor Féliz Adorno, Reactor Inspector, Division of Reactor Safety Others as assigned Licensee Attendees Amir Shahkarami, Site Vice President Others as assigned Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Office of Public Affairs at 630-829-9662 or 630-829-9663 by September 27, 2010.

Seating may be limited and will be available on a first-come basis. Inform the NRC meeting contact of your intention to attend by September 27, 2010. This step will ensure that sufficient copies of meeting materials are available.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

Meeting Contact: Viktoria Mitlyng Senior Public Affairs Officer, Region III 630-829-9662 Viktoria.Mitlyng@nrc.gov Approved By: /RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects DOCUMENT NAME: G:\BRAI\Braidwood SIT Public Meeting Notice.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MThorpe- RSkokowski Kavanaugh:dtp DATE 09/15/10 09/15/10 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting Distribution:

Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Patrick Louden, Acting Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Kenneth OBrien, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Braidwood DRS Branch Chiefs:

Robert Daley David Hills Eric Duncan AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP