SBK-L-10154, Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NEXTera" ENERGY ,, g.- ep em13 6r-4-, 2010 Docket No. 50-443 SBK-L-10154 U. S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:NEXTera" ENERGY   ,,
Document Control Desk Washington, DC 20555-0001 Seabrook Station Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing Examinations NextEra Energy Seabrook, LLC has enclosed a response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations.
g.-ep em13 6r-4-, 2010 Docket No. 50-443 SBK-L-10154 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing Examinations NextEra Energy Seabrook, LLC has enclosed a response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations.
If you have any questions regarding this submittal, please contact me at (603) 773-7745.Sincerely, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager cc: NRC Region I Administrator S. L. Hansell, NRC Region I G. E. Miller, NRC Project Manager W. J. Raymond, NRC Resident Inspector SW38 NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 Enclosure to SBK-L-10154 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
If you have any questions regarding this submittal, please contact me at (603) 773-7745.
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations.
Sincerely, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager cc:     NRC Region I Administrator S. L. Hansell, NRC Region I G. E. Miller, NRC Project Manager W. J. Raymond, NRC Resident Inspector SW38 NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
 
FACILITY NRC REGION Seabrook Station Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 12 Cy 13 Cy 14 Cy 15 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMI NATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 12 Cy 13 Cy 14 Cy 15 NUMBER OF REACTOR 0 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS  
Enclosure to SBK-L-10154 NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 10/31/2011 (10-2008)                                                         Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
-INSTANT NUMBER OF SENIOR REACTOR 4 OPERATORS  
OPERATOR LICENSING                       Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA                         and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
-UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS  
FACILITY                                                                                                         NRC REGION Seabrook Station Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY   12           Cy   13                       Cy     14                       Cy 15 ESTIMATED NUMBER OF LICENSEE-PREPARED                 0                         1                                 0                               1 EXAMI NATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                         0                                 0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY   12           Cy   13                       Cy 14                           Cy     15 NUMBER OF REACTOR                         0                   8                               0                               8 OPERATORS NUMBER OF SENIOR REACTOR                         0                 4                                 0                             4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR                                           4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR                                           0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                                   04/15/2013                                                     06/22/2015 ALTERNATE DATE                                   04/22/2013                                                     06/29/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   11                                                   CY       13 PROPOSED NUMBER             MARCH       JUNE     SEPTEMBER DECEMBER           MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                       12                                                                               12 CANDIDATES NRC FORM 536 (10-2008)                                                                                             PRINTED ON RECYCLED PAPER}}
-LIMITED PROPOSED DATES PRIMARY DATE 04/15/2013 06/22/2015 ALTERNATE DATE 04/22/2013 06/29/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 11 CY 13 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER}}

Latest revision as of 14:02, 13 November 2019

Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing Examinations
ML102630218
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/15/2010
From: O'Keefe M
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2010-08, SBK-L-10154
Download: ML102630218 (3)


Text

NEXTera" ENERGY ,,

g.-ep em13 6r-4-, 2010 Docket No. 50-443 SBK-L-10154 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Response to RIS 2010-08 Preparation and Scheduling of Operator Licensing Examinations NextEra Energy Seabrook, LLC has enclosed a response to Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations.

If you have any questions regarding this submittal, please contact me at (603) 773-7745.

Sincerely, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager cc: NRC Region I Administrator S. L. Hansell, NRC Region I G. E. Miller, NRC Project Manager W. J. Raymond, NRC Resident Inspector SW38 NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

Enclosure to SBK-L-10154 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Seabrook Station Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 12 Cy 13 Cy 14 Cy 15 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMI NATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 12 Cy 13 Cy 14 Cy 15 NUMBER OF REACTOR 0 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/15/2013 06/22/2015 ALTERNATE DATE 04/22/2013 06/29/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 11 CY 13 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER